1
The new AUS-SPEC Specification by NATSPEC
Driving Efficiency in Road Maintenance. Innovative delivery models to demonstrate Value for Money.
1 A practical workshop by Bill Woodcock Complete Urban, NSW * - - PowerPoint PPT Presentation
Driving Efficiency in Road Maintenance. Innovative delivery models to demonstrate Value for Money. The new AUS-SPEC Specification by NATSPEC 1 A practical workshop by Bill Woodcock Complete Urban, NSW * Note: This Seminar has the support
1
The new AUS-SPEC Specification by NATSPEC
Driving Efficiency in Road Maintenance. Innovative delivery models to demonstrate Value for Money.
* Note: This Seminar has the support
authorised by NATSPEC.
2
1.
Introductions.
2.
AUS-SPEC Series.
3.
Define the problem – An Amorphous Blob
4.
Contract or Day Labour
5.
The Logic – Cut into manageable portions
6.
The Solution – A Systems Approach
7.
Data Capture
8.
Technology
9.
OUTCOMES AND BENEFITS
3
This WORKSHOP is designed to advise
4
Bill Woodcock has been in the Local Government Engineering Industry for 35 years. In that time he has worked in positions including Director of Works and Services and Assistant General Manager, Technical Services. As co-author of the AUS-SPEC series he is more than qualified to advise on the best ways to obtain value from the AUS-SPEC series.
5
is a professional organisation providing member services and advocacy for those involved in and delivering public works and engineering services to the community. One service is to provide the lead in Asset Management, Plant Management and Professional Specifications and Contract documentation.
government engineering but by broadening the base of expertise and experience, adds a new dimension to public works professionalism in Australia.
your State Division directly or email the www.ipwea.org.au
6
property industry through professional associations and government property groups.
national building specification system endorsed by government and professional bodies.
the specification for all building structures. It has specialist packages for architects, interior designers, landscape architects, structural engineers, service engineers and domestic
7
for its shareholders and to improve the quality of construction in Australia via the provision of information, tools, products and services.
series of Engineering Specifications
the written notes.
8
9
AUS-SPEC Up to date
Continious improvements have been made to the AUS-SPEC documents, as listed below:
Buildings, Roadworks and Public utilities have been significantly revised.
book for building mainitenance contracts. AUS-SPEC Buildings package also includes the NATSPEC Buildings Basic package.
Some results of poor Contract
Documentation and non-specific Specifications.
Some examples of Road Defects that
AUS-SPEC won’t fix !
10
11
12
13
14
15
(Includes NATSPEC Site)
(includes NATSPEC Basic)
16
17
preliminaries, quality checklists and quality requirements for the supply of projects and services.
for completing the tender and contract documentation, maintenance management plans and contract schedules for a maintenance contract.
guidelines and examples to prepare the specifications.
Managers, Purchasing and Legal Officers.
18
AUS-SPEC Benefits and Objectives
reducing the number of project variations, disputes and correctional work. Without a correct specification the additional costs are inevitably borne by you, the client.
provide more honest and accurate tenders instead of inflated tenders because they do not know clearly what you want.
scale are possible through staff training and Contractor familiarity of one standard instead a myriad of good, bad and ugly specification attempts.
19
20
AUS-SPEC Up to date
local government Councils at a greatly reduced price via annual subscription.
standards, e.g. to Australian Standards, Austroads and
and various industry organisations.
introduced in the design and construction worksections e.g. Water Sensitive Urban Design, stormwater harvesting and new design and construction techniques as per Austroads and WSAA standards.
21
22
We will always be told where a pothole is or
a ragged edge break,
Should we respond to every request and
have the patching crew drive all over the road network always catching up with any request.
What constitutes a real problem ?
23
Do all Gangs/Teams fill a pothole the same
The same goes for Edge break repair, rutting,
alligator cracking ?
Is all the plant and equipment for each
Gang/team the same or most appropriate ?
Is the materials being used the same or most
Do we use a machine, say a Paveliner for all
potholes even if it is not the best fix ?
24
What is the right budget ? How much does the Engineer tell the
Council is enough ?
There is never enough ! The Asset management plan should tell
Council what the renewal budget is but how big should the Maintenance budget be ?
25
How many staff is enough ? What skill set do they need ? How many trucks, backhoe’s, how many
dog trailers ?
How do we predict the quantities and at
what cost ?
26
27
What do our Gangs/teams look out for ? Do we rely on the residents to tell us what is
wrong ?
What constitutes something that is valid from
28
29
Do we fix every Customer request to placate
the Councillors ?
Are we being true to our profession, the one
we are being paid to provide advice from ?
30
Do we comply with the Civil Liabilities Act ? Do we fix something because we are asked
Do we comply with our ethical obligations to
31
At this point I would like to emphasise that
the processes defined here and in fact defined in AUS-SPEC are independent on whether Day Labour or Contract Maintenance is carried out.
The only difference is how to define the level
32
33
Amorphous Blob Manageable Portions
› Segments / Precincts / Areas defined › Activity Specifications › Road Traffic Score › Split Inspection from Doing › Work Method Statements › Materials specified – Australian Standards › Levels of Service Intervention Level Response Time Compulsory Intervention Level › The Law – The Judges Response › Civil Liability › Proportioning the existing budget to Level of Service › Risk Management › Fine Tuning / Iteration
34
We now split the Council area into a set
number of Segments, Precincts or areas.
An existing Precinct will do, as long as each
has approximately the same number of length of streets.
This is easily done on a map/GIS.
35
A set of some 40 separate Activity
Specifications are available.
See Notes for list and a number of examples. Acronym Code, “What work is Included ?”,
Why do we do it ? Etc.
Work Method Requirements. Material Standards. Checklists Performance
36
As part of the Activity Specification all roads
are allocated a “Road Traffic Score”.
This nominates the “importance of the road”
in the Hierarchy.
Roads near shops, Schools, Hospitals are
more important than back roads. This can be easily shown on the map/GIS by colour coding.
37
Why separate the “Inspection” from the
“Doing” ?
Work Method Requirements included for
Should these be changed ?
38
In the Activity Specification, the materials
used are specified for compliance with up to date Australian Standards.
Older versions have older Australian
The Activity Specifications also refer to the
normal AUS-SPEC Specifications. i.e. “1141 Flexible paving”.
39
Now please look at the sample Activity
Specifications.
40
The intervention level is established by
Council and is directly proportional to the available budget.
Unless it is unreasonable, a judge can only
A judge cannot direct a Council to adopt
41
You will see that the Intervention level is
mostly based on a dimension.
Through determining the equivalent current
intervention level through Consensus from the Works staff a start level can be reached.
This is then used as an initial trial and costings
done for each Activity.
42
43
Once the Level of service is determined from
the Staff Consensus, the relative risk is considered based on AS 4360 principles.
A revision is made and the other Activity
44
The system is then trialled for between 3 to 6
months to monitor relative costs associated with meeting the levels of service.
These are then shifted up or down to suit the
actualities of the budget.
These then become the new levels of
service as being closer to the actual budget.
Through continuous iterations it is possible to
fine tune.
45
46
› Records › Costings › Maintenance Defect Register (MDR)
47
It is imperative that records are kept for both
costing reasons and legal reasons.
It should be made as easy as possible for the
information to be captured and stored for later retrieval.
48
Each class of Activity Specification will have
its own separate budget.
To facilitate the fine tuning, any monthly
variations from a straight line show whether the annual budget will be met or not.
This can be done using a simple progressive
monthly cumulative graph for each activity class.
49
50
The MDR is the easiest way to Register
defects.
It can record the inspection, nominate the
Road Traffic Score, Allocate the work to an area or precinct, allocate the work to a gang or team (work order) and finally record the completion of the work with date.
An MDR form is available in the AUS-SPEC
documentation, but this can be automated.
51
› I Pad or similar
X-Y Coordinate Level of Service Photo record Court evidence Work Orders
52
capture the X-Y Coordinate, Link this to the
This then forms the Court evidence and
provides all the information for the resulting
53
54
55
56
WHY HAVE A SPECIFICATION? The primary function of a specification is to give effect to design decisions. Many design decisions cannot be expressed in graphic form and therefore rely on words for their expression. Other decisions would be too tedious or impractical to be conveyed in graphic form.
57
AUS-SPEC Benefits and Objectives
THE IMPORTANCE OF A SPECIFICATION?
documentation provided.
conditions of contract, the drawings, the schedules and the specification.
document, its primary function is to define precisely and succinctly the quality required and the processes necessary for achieving it. Its role includes; but extends beyond; the selection of materials by providing the baseline for acceptable quality of construction.
58
The word “Specification” comes from the word “Specific”.
AUS-SPEC Benefits and Objectives
THE ROLES OF THE SPECIFICATION
The specification has many roles including being:
statutory requirements.
59
AUS-SPEC Benefits and Objectives
SPECIFYING RECREATION AREAS
This is listed as a Playground for bad children. Note, signage to cover liability. This sign may not be as useful! So is this.
60
Traffic Calming we would not recommend. Wayfinding we would not recommend!
61
design, tendering and contract preliminaries, construction, maintenance and operations of roadworks and minor bridges for vehicle and pedestrian use.
(MMP) to organize and ensure quality maintenance processes and Activity Requirements (AR) covering road pavement and shoulder, drainage, roadside, traffic facilities and miscellaneous activities such as emergency call out.
guidelines and examples to prepare the specifications.
Asset, Maintenance Business Unit and Strategic Planning Managers.
62
and contract preliminaries, maintenance and operations buildings, roadworks, minor bridges for vehicle and pedestrian use and public utilities.
Plan (MMP) to organize and ensure quality maintenance and Activity Contract Requirements (ACR) for various activities.
guidelines and examples to prepare the specifications.
Services, Asset and Maintenance Managers.
63
AUS-SPEC TECHguides
government projects.
specifications and tender submission
commencing a project.
section of SPECbuilder Pro in pdf format and can be printed as well.
64
chart for those who need to associate their
identified easily.
new numbering system.
65
the internet (Lite)
67
SPECbuilder Pro
repackaged with a new front end software program called SPECbuilder Pro. This makes compilation significantly
the existing NATSPEC series.
SPECbuilder Pro.
into a draft worksection by the design team.
68
69
Screen Grab – SPECBuilder Pro.
AUS-SPEC Roads, Parks and Buildings Maintenance Process and Principles - Recap
70
Maintenance Process and Principles
The Maintenance specifications for Roads, Parks and Buildings consists of a lot more than just specifications. Inside these documents is a complete pro active maintenance system with all of the support information required.
with examples from Parramatta and Penrith City Councils. (Attached to Notes).
Service” for roads, parks and buildings ?
71
Guide to Road Reserve maintenance management model documentation Road Reserve Management Plan requirements Quick Start Guide Guide to adapting asset delivery documentation to road reserve maintenance Technical Specifications for Road Reserves
72
THE AUS-SPEC MAINTENANCE PROCESS
PRINCIPAL COMMISSIONS WORK
ROAD INVENTORY
PROGRAMMED BUSINESS UNIT INSPECTIONS MAINTENANCE DEFECT REGISTER (MDR) ACTIVITY SPECIFICATIONS DEFINE LEVEL OF SERVICE QUALITY RANDOM AUDIT CARRIED OUT BY PRINCIPAL WORK CARRIED OUT ADVICE TO CUSTOMER SERVICE UNIT PROOF OF SYSTEMATIC APPROACH FOR INSURANCE AND LITIGATION CLAIMS
REVIEW
73
74
NOTE: The same basic process works for Parks and Recreation Areas Specifications as well as Buildings and Facilities Specifications.
To go from an add-hoc or reactive maintenance system to a pro active system involves a number of fairly basic and logical steps. These can be summarised as follows:
classes of road and apply a score being a “Road Traffic Score”.
be carried out.
75
intervention level”, for each road traffic score.
pre determined intervention levels in the Maintenance Defect Register (MDR).
precincts.
more and more accurate.
76
These are:
based on the existing budget and a Council based risk profile.
unnecessary travel between jobs.
tasks involved.
77
78
maintenance tasks in any one precinct.
performed by a work crew while on the job.
iterative improvements.
role.
79
Maintenance Defect Register (MDR)
80
allocated budget.
allocated budget.
type (Road Traffic Score).
AUS-SPEC DEFINED LEVELS OF SERVICE - PRINCIPLES
81
82
reported liability incidents over the last 10 years. The bars show the value of claims made over the same
attributed to the introduction of the Civil Liabilities Act in 2002/03.
attributed to changes in legislation. People have incidents and report them.
83
Institute of Public Works Engineering Australia
$0 $200,000 $400,000 $600,000 $800,000 $1,000,000 $1,200,000 1998/1999 1999/2000 2000/2001 2001/2002 2002/2003 2003/2004 2004/2005 2005/2006 2006/2007 2007/2008 2008/2009
Claims Costs
20 40 60 80 100 120 140 160 180
Frequency of Claims
Cost (LHS) Claims (RHS)
LIABILITY CLAIMS & INCIDENTS COST & FREQUENCY OVER 10 YRS
Institute of Public Works Engineering Australia
84
km of paving. The introduction of AUS-SPEC has resulted in better priority setting and maintenance
at least twofold. You should note there is now only 1 incident in every 24 km
eightfold in 2008.
85
Institute of Public Works Engineering Australia
5 10 15 20 25 30 1996/1997 1997/1998 1998/1999 1999/2000 2000/2001 2001/2002 2002/2003 2003/2004 2004/2005 2005/2006 2006/2007 2007/2008 2008/09 est
1 Incident every 3 km 1 Incident every 24 km
AUS-SPEC
Grinding program
Institute of Public Works Engineering Australia
86
the Civil Liabilities Act in 2002/03 the number of incidents and claims is not affected by the legislation.
claims is attributed to improved asset management and our ability to demonstrate that we have systems in place through the use of AUS-SPEC.
87
Institute of Public Works Engineering Australia
88
Claims Received & Accepted & Cost of Claims
10 20 30 40 50 60 70 80 1999/2000 2000/2001 2001/2002 2002/2003 2003/2004 2004/2005 2005/2006 2006/2007 2007/2008 2008/2009 $0 $100,000 $200,000 $300,000 $400,000 $500,000 $600,000 $700,000 $800,000 Paid Claims (LHS) Claims Received (LHS) Claims Costs (RHS) AusSpec 4 major claims
Claims Received, Accepted and Cost of Claims
Institute of Public Works Engineering Australia
Penrith City Council implemented the AUS-SPEC systems approach to road reserve maintenance in 2001-02.
89
Council’s Objectives Programmed Approach to Maintenance Appropriate quality management controls Decreasing number of community complaints Adequate reporting for insurance purposes Carry out work in a cost effective and efficient manner Repeatable and quantifiable criteria for work Be able to benchmark with peers Professional approach to asset management Satisfy our customers within a clear framework Organise maintenance in a systematic way More pro-active approach Minimised risk profile Inspection by Asset Coordinators
“I am convinced that a systematic (asset
centric) approach to road maintenance is the only way to manage roads in a safe and cost effective manner. The sooner the process is implemented, the better the
90
Try cycling down this cycle path !!
91
92
have the potential to save most Councils both
professionals managing the process look good !!!!
93
94
Discover the value of the new AUS-SPEC Documentation series sponsored by IPWEA and NATSPEC.
95
96
For additional information and relevant documents on AUS-SPEC they can visit our website www.natspec.com.au. NATSPEC conducts Professional development seminar series every year in July/August, interested Councils can contact us directly or simply write to us at aus-spec@natspec.com.au.
If you need any assistance with the installation or implementation of any of the new AUS-SPEC Documentation series you have seen today, please do not hesitate to discuss it with us. bill_woodcock@completeurban.com.au www.completeurban.com.au (02) 9282 9900
97
98
Bill Woodcock
bill_woodcock@ completeurban.com.au. (02) 92829900. Mob 0402 026 917 PRINCIPAL, GOVERNMENT AND BUSINESS SERVICES
99
Driving Efficiency in Road Maintenance. Innovative delivery models to demonstrate Value for Money.