Active Transportation Initiatives 2017 Public Hearing on Active Transportation Matt Dawson-Mathur, P.E. April 19, 2017 2016 Adopted Hike & Bike Plan Target Audience 8 to 80 Context Sensitive Designs Connect Regional Points


slide-1
SLIDE 1

Active Transportation Initiatives

2017 Public Hearing on Active Transportation Matt Dawson-Mathur, P.E. April 19, 2017

slide-2
SLIDE 2

2016 Adopted Hike & Bike Plan

  • Target Audience “8 to 80”
  • Context Sensitive Designs
  • Connect Regional Points
  • f Interest
  • Texas A&M University
  • Blinn College
  • Downtown Bryan
  • Schools
  • Parks
  • Trails
slide-3
SLIDE 3

2015 Transportation Alternatives Program (TAP)

1. South College Avenue Phase 1 (FY18 Construction) 2. FM 158 Safety Lighting (Under Construction) 3. Safe Routes to School 4. East 29th Street Shared Use Path 5. South College Avenue Phase 2

slide-4
SLIDE 4

2017 Transportation Alternatives (TA) Set-Aside Program

1. Coulter Drive Sidewalks and Bike Lanes

a. S College Avenue to William J Bryan Parkway (FM 158) b. 6’ sidewalks and 5’ (min.) bike lanes c. Connections

i. S College Ave Bike Lanes ii. Neighborhoods iii. Stephen F Austin Middle iv. St Joseph Catholic School v. Sue Haswell Park

slide-5
SLIDE 5

2017 TA Set-Aside Program

2. Earl Rudder Freeway (SH 6) E Frontage Road Shared Use Path (SUP)

a. Boonville Road (FM 158) to Old Reliance Road b. 12’ Separated SUP c. Connections

i. FM 158 SUP ii. Kroger, etc. iii. Premier Cinema, etc. iv. Sam Rayburn Middle

slide-6
SLIDE 6

2017 TA Set-Aside Program

3. Villa Maria Road (FM 158) Shared Use Path and Lighting

a. Harvey Mitchell Parkway (FM 2818) to Riverside Parkway (SH 47) b. 12’ Separated SUP with Pedestrian Lighting c. Connections

i. Wal-Mart, etc. ii. Neighborhoods iii. Parks/Trails iv. Branch Elementary v. Brazos Christian School vi. Future BISD School

slide-7
SLIDE 7

2017 TA Set-Aside Program

4. Safe Routes to Schools Sidewalks

a. Kemp, Sul Ross, and Johnson Elementary Schools b. 5’ and 6’ sidewalks

slide-8
SLIDE 8

Upcoming Projects

  • Separated Shared Use Path (MPO –

FY20)

  • William J Bryan (FM 158) from

SH 6 to Coulter Drive

  • Buffered Bike Lanes (HSIP – FY17)
  • Finfeather Road from Groesbeck

Street to City Limits

  • Two Way Cycle Track (Unfunded)
  • Wellborn Road from Natalie

Street to Tee Drive

  • Clay Street Extension (COB – FY17)
  • Bike Lane / SUP from Wellborn

Road to College Main