5 th Street SE Bridge Overview Bridge is functionally obsolete - - PowerPoint PPT Presentation

5 th street se bridge overview
SMART_READER_LITE
LIVE PREVIEW

5 th Street SE Bridge Overview Bridge is functionally obsolete - - PowerPoint PPT Presentation

5 th Street SE Bridge Overview Bridge is functionally obsolete New bridge funded with federal money Layout was approved 2017 MnDOT hosted several visual quality workshops where community members were able to select bridge


slide-1
SLIDE 1

5 th Street SE Bridge Overview

  • Bridge is functionally obsolete
  • New bridge funded with federal money
  • Layout was approved 2017
  • MnDOT hosted several visual quality

workshops where community members were able to select bridge design details such as style and color.

slide-2
SLIDE 2

5 th Street SE Bridge Neighborhood Context

N Black = Traffic Flow Green = Bike Lane Direction

slide-3
SLIDE 3

5 th St. SE Bridge Layout

slide-4
SLIDE 4

Aerial perspective

slide-5
SLIDE 5

Perspective looking w est

slide-6
SLIDE 6

Bridge rail design

slide-7
SLIDE 7

5 th Street SE Bridge

  • Municipal consent process (state statute)
  • Triggered by roadway reconfiguration
  • Triggered by ROW acquisition
slide-8
SLIDE 8

East Approach Cross Sections

B B A A 28’ 14’ 6’ 20’ Section A-A Section B-B Direction

  • f Traffic

Direction

  • f Traffic
slide-9
SLIDE 9

West Cross Section

D D C C 28’ 14’ 6’ 20’ Section C-C Section D-D

slide-10
SLIDE 10

9 th Street ROW acquisition

slide-11
SLIDE 11

Questions

slide-12
SLIDE 12

Drivew ay Issue

Proposed One-way Private Driveways

slide-13
SLIDE 13

Drivew ay Issue