5 th Street SE Bridge Overview Bridge is functionally obsolete - PowerPoint PPT Presentation
5 th Street SE Bridge Overview Bridge is functionally obsolete New bridge funded with federal money Layout was approved 2017 MnDOT hosted several visual quality workshops where community members were able to select bridge
5 th Street SE Bridge Overview • Bridge is functionally obsolete • New bridge funded with federal money • Layout was approved 2017 • MnDOT hosted several visual quality workshops where community members were able to select bridge design details such as style and color.
5 th Street SE Bridge Neighborhood Context Black = Traffic Flow Green = Bike Lane Direction N
5 th St. SE Bridge Layout
Aerial perspective
Perspective looking w est
Bridge rail design
5 th Street SE Bridge • Municipal consent process (state statute) • Triggered by roadway reconfiguration • Triggered by ROW acquisition
East Approach Cross Sections Section A-A 20’ A Section B-B A B B 28’ 6’ 14’ Direction of Traffic Direction of Traffic
West Cross Section Section C-C C C 20’ Section D-D D D 28’ 6’ 14’
9 th Street ROW acquisition
Questions
Drivew ay Issue Private Driveways Proposed One-way
Drivew ay Issue
Recommend