A n n u a l G e n e r a l M e e t i n g 30 November 2016 1 D i s - - PowerPoint PPT Presentation

a n n u a l g e n e r a l m e e t i n g
SMART_READER_LITE
LIVE PREVIEW

A n n u a l G e n e r a l M e e t i n g 30 November 2016 1 D i s - - PowerPoint PPT Presentation

A n n u a l G e n e r a l M e e t i n g 30 November 2016 1 D i s c l ai m e r All information contained in this presentation is of a general nature. Potential investors are cautioned against using the content of this presentation, in


slide-1
SLIDE 1

A n n u a l G e n e r a l M e e t i n g

30 November 2016 1

slide-2
SLIDE 2

All information contained in this presentation is of a general nature. Potential investors are cautioned against using the content of this presentation, in isolation, for making investment decisions. Best efforts have been made to ensure the accuracy of information contained (at the time of preparation). Where forward targets and/or assumptions have been included – all such instances are indicative only and subject to alteration and/or cancellation as and when the management of Santana Minerals Limited (‘Santana’) determines. Research and advice of a qualified financial advisor or accountant are strongly recommended to anyone considering investing in listed company securities, including those of Santana. Previous Disclosure - JORC Code Information relating to Mineral Resources, Exploration Targets and Exploration Data associated with the Company’s projects in this presentation is extracted from the following ASX Announcements:

  • ASX announcement titled “Wide Multi Ounce Silver Mineralisation Returned From Diamond Saw Intercepts Southern Sector Cuitaboca Project, Mexico”

dated 11 January 2016;

  • ASX announcement titled “Additional Wide Multi Ounce Silver Mineralisation Returned From Diamond Saw Intercepts Central Sector Cuitaboca Project,

Mexico” dated 14 January 2016;

  • ASX announcement titled “Silver Mineralisation at Cuitaboca – Mojardina Strike Doubled” dated 1 March 2016.
  • ASX announcement titled “New Gold Zone and Drilling Update - Cuitaboca Project Mexico” dated 7 June 2016
  • ASX announcement titled “Broad Zones of High Grade Silver from RC Drilling – Cuitaboca” dated 23 June 2016
  • ASX announcement titled “Broad Silver Zones Build Bulk Tonnage Potential – Cuitaboca” dated 6 July 2016
  • ASX announcement titled “Drilling Commences at Cuitaboca, Mexico” dated 18 October 2016
  • ASX announcement titled “Initial RC Drill Results, Mojardina Loop Prospect Cuitaboca” dated 18 November 2016
  • ASX announcement titled “High Grade Silver Intercept Drill Result – Mojardina Prospect – Cuitaboca Mexico” dated 23 November 2016
  • ASX announcement titled “New High Grade Shoot Discovery – Mojardina Prospect” dated 28 November 2016

A copy of each of these announcements is available to view on the Santana Minerals Limited website www.santanaminerals.com. The reports were issued in accordance with the 2012 Edition of the JORC Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements. Forward-looking statements in this presentation include, but are not limited to, statements with respect to Santana’s future plans, strategy, activities, events or developments the Company believes, expects or anticipates will or may occur. By their very nature, forward-looking statements require Santana to make assumptions that may not materialize or that may not be accurate. Although Santana believes that the expectations reflected in the forward-looking statements in this presentation are reasonable, no assurance can be given that these expectations will prove to have been correct, as actual results and future events could differ materially from those anticipated in the forward looking statements. Accordingly, viewers are cautioned not to place undue reliance on forward-looking statements. Santana does not undertake to update publicly or to revise any of the included forward-looking statements, except as may be required under applicable securities laws.

D i s c l ai m e r

2

slide-3
SLIDE 3

S i e r ra M a d re O c c i d e nta l M i n i n g A c ti v i ty

3

slide-4
SLIDE 4

Location: Sinaloa State, Mexico

100km N-E of Los Mochis, Sinaloa

5,500ha project area (Central, Southern & Northern Sectors)

Elevation: S (RL 750m) to N (RL1,200m)

Cuitaboca Project - Location

4

Deal Structure/Ownership

Earning to initial 80% through option payments + exploration spend

Option payments (US$3.5M – circa $3M

  • utstanding)

to Concession Holder (Mexican Family) – ‘usual’ Mexican deal structure

Post option payments 20% third party contributions or dilution

2.5% NSR to Concession Holder

Santana has project management and control

slide-5
SLIDE 5

Exploration Progress

Multiple ‘repeats’ systems

2015-2016 broad zones of mineralisation identified at vein junctions - Southern and Central Sectors

1H 2016 phase 1 RC drilling confirmed bulk tonnage potential at Mojardina

2H 2016 phase 2 RC drilling:

  • Enhances Mojardina Loop
  • Jesus Maria breccia

Cuitaboca Project - Regional Setting

5

slide-6
SLIDE 6

Mojardina Loop – identify, geologic concep, discovery by drill

Diamond saw surface trench

Broad zones of silver rich mineralisation

Drilled (RC) Phase 1

Drilled (RC) Phase 2 – mineralisation continuity + geometric simplicity + remains open at depth and along strike

6

61m @ 61 g/t Ag (MJTR001+020) 37m @ 51 g/t Ag (MJTR020) 8m @ 119 g/t Ag (MJTR020) 12m @ 71 g/t Ag (MJTR024) 12m @ 102 g/t Ag (MJTR025) RC Drilling Phase 1 (1,850m in 14 holes) 83m @ 97 g/t Ag from 0m (RC16CT-03) 67m @ 66 g/t Ag from 31m (RC16CT-04) 51m @ 42 g/t Ag + 0.23% Zn from 21m (RC16CT-05) 3m @ 119g/t Ag + 2.5% Zn, 0.87% Pb from 52m (RC16CT-10) 9m @ 53g/t Ag from 2m (RC16CT-14) RC Drilling Phase 2 (1,835m in 10 holes) 35m @ 221 g/t Ag from 0m incl 14m@ 453 g/t Ag + 2% Zn from 21m (RC16CT-21) 52m @ 127 g/t Ag from 0m incl 23m@ 253 g/t Ag from 27m (RC16CT-23) 6m @ 194 g/t Ag from 75m (RC16CT-24) 11m @ 55 g/t Ag from 0m (RC16CT-19) 45m @ 45 g/t Ag from 65m incl 8m@ 116 Ag from 100m (RC16CT-19) + others not summarised here near surface bulk tonnage silver at vein flexures concept demonstrated demonstrate concept at depth – successful Build towards a resource - underway 2H 2015 – 2H 2016 Concept Results

slide-7
SLIDE 7

Mojardina Loop – Drill location Plan (Phase 1 + 2)

Mojardina Loop

Drill holes 1-14 Phase 1 RC Drilling

Drill holes 16-24 + 26 Phase 2 RC Drilling

Thick continuous intercepts

Simple geometry: series of circa 20m thick panels dipping 45deg NW

7

slide-8
SLIDE 8

Mojardina Loop - Drill Sections

8

Note: continuity of mineralised envelope

slide-9
SLIDE 9

Mojardina Loop – Long Section

9

slide-10
SLIDE 10

Jesus Maria breccia – ‘repeat of Mojardina’

10

2nd Half 2016 RC Drill results pending – first drill testing of Jesus Maria breccia

slide-11
SLIDE 11

C u i ta b o c a Pro j e c t – N o r th e r n S e c to r - 2 0 1 5

Highlights

Located higher elevations in geological sequence

Less accessible at present (pending track cutting)

Gold appears: 3.39 g/t and 2.93 g/t (surface samples)

Petrography confirms hypogene hematite hosted

Mapping and sampling 2H 2016 with view to trenching and later drill planning 11 Lupita Structure 15km along structural trend from San Jose de Gracia Mine

slide-12
SLIDE 12

S M I C ap i tal S tr u c tu re & M an age m e nt

(30 Nov 2016 – incl *Shareholder approvals of AGM)

Issued Capital Issued Shares 262M* Options (unlisted) @$0.03 13.47M (expire 30 09 17) @$0.06 2M (expire 31 March 2017)* - broker @$0.275 3.9M (expire April 2018) – management @$0.08 1.5M (expire May 2019) - management Market Cap $13M Cash $1.4M (post drill program) Directors / Management Norm Seckold Chairman Tony McDonald Managing Director Dick Keevers Director Jason Beckton Chief Geologist Craig McPherson CFO / Corporate Secretary

12