ACE Your Next Paving Project Fifte teen en hundr dred ed years - - PowerPoint PPT Presentation

ace your next paving project
SMART_READER_LITE
LIVE PREVIEW

ACE Your Next Paving Project Fifte teen en hundr dred ed years - - PowerPoint PPT Presentation

ACE Your Next Paving Project Fifte teen en hundr dred ed years s ago, everybody rybody knew w the earth th was s the e cente nter of the univer erse se Five hundr ndred ed year ars ago, , everybody rybody knew w the earth th


slide-1
SLIDE 1

ACE Your Next Paving Project

slide-2
SLIDE 2

Fifte teen en hundr dred ed years s ago, everybody rybody knew w the earth th was s the e cente nter of the univer erse se

slide-3
SLIDE 3

Five hundr ndred ed year ars ago, , everybody rybody knew w the earth th was flat

slide-4
SLIDE 4

Pavement Matrix

Lower Initial Cost Structurally Sound Longevity Speed of Construction Aesthetics Asphalt and Stone Base Conventional Reinforced Concrete CCP Compacted Concrete Pavement

slide-5
SLIDE 5
slide-6
SLIDE 6
slide-7
SLIDE 7
slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10

Imagine what we’ll know tomorrow RCC has been called and “ugly” paveme ment; nt; What t about ut CCP? P?

slide-11
SLIDE 11
slide-12
SLIDE 12
slide-13
SLIDE 13
slide-14
SLIDE 14
slide-15
SLIDE 15

Now we can construct CCP pavements with finished, troweled, and textured surfaces.

slide-16
SLIDE 16
slide-17
SLIDE 17
slide-18
SLIDE 18
slide-19
SLIDE 19
slide-20
SLIDE 20
slide-21
SLIDE 21
slide-22
SLIDE 22
slide-23
SLIDE 23
slide-24
SLIDE 24

3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 3 DAY 7 DAY 14 DAY 21 DAY 28 DAY 56 day 90 Day

Cylinders

CONTROL 2 NO ASH CONTROL 1 ASH ACEiT ASH ACEiT NO ASH City of Wichita 650 FLEX KDOT 4.0

slide-25
SLIDE 25

400 450 500 550 600 650 700 750 800 850 900 3 DAY 7 DAY 14 DAY 21 DAY 28 DAY

Molded Beams

CONTROL 1 ASH CONTROL 2 NO ASH ACEiT ASH ACEiT NO ASH 3 DAY 7 DAY 14 DAY 21 DAY 28 DAY 3 DAY 7 DAY 14 DAY 21 DAY 28 DAY

slide-26
SLIDE 26

0.5875 0.275 0.95 0.8 0.25 0.225 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1

Depth (mm)

Mix Description

Conventional Concrete Mix Wichita city mix Conventional Concrete KDOT Mix Traditional RCC mix, No Ash, No ACEiT Traditional RCC mix with Ash, No ACEiT ACEiT No Ash, Rolled, Troweled ACEiT, Ash, Rolled, Troweled

slide-27
SLIDE 27

 Surface finish is indistinguishable from conventional

concrete.

 Acceptable haul time is increased by a factor of 8.  Sensitivity to moisture variation is reduced.  Rolling is virtually eliminated and ride is greatly

improved.

 Labor to pave around obstructions and tight radii is

drastically reduced.

 Price of paving is directly competitive with asphalt.

With ACEiT – The future of RCC is here today!

slide-28
SLIDE 28

Increased workability Increased working TIME [TIME=?] Building VALUE Managing expectations positively Hand work is much easier Surface appearance, texture, and properties are more consistent More controlled strength gain Construction is made easier