ACTO TON STORM TANKS Community Liaison Working Group Tuesday 4 February 2020 Acton Storm Tanks Josh Roy, Section Manager Tideway Overview WEST Tideway West Acton Storm Tanks Curren rent t ope peration ration at Acton ton Storm rm


slide-1
SLIDE 1

ACTO TON STORM TANKS Community Liaison Working Group

Tuesday 4 February 2020

slide-2
SLIDE 2

Acton Storm Tanks

Josh Roy, Section Manager

slide-3
SLIDE 3

Tideway Overview

WEST

slide-4
SLIDE 4

Tideway West

Acton Storm Tanks

slide-5
SLIDE 5

Curren rent t ope peration ration at Acton ton Storm rm Tanks ks

Acton Storm Tanks

1 2 3 4

Stamford Brook Sewer fills up during storm Storm flows

  • verflow

the weir Overflow channel directs flow to Tanks 3 & 4 Odour control system triggered by flows in

  • verflow channel

Excess flows discharge to the River Thames Tanks 1 & 2 now fill only in scenarios where the river is at Tidelock

slide-6
SLIDE 6

Curren rent t ope peration ration at Acton ton Storm rm Tanks ks

Acton Storm Tanks

1 2 3 4 Problem 29 discharges per year 312,000t sewage Solution Thames Tideway Tunnel No expected discharges

slide-7
SLIDE 7

Curren rent t ope peration ration at Acton ton Storm rm Tanks ks

TWUL Network

To Beckton To the Thames

slide-8
SLIDE 8

TWUL Network

slide-9
SLIDE 9

Acton Storm Tanks What we are doing

slide-10
SLIDE 10

Apr ’18 Nov ‘18 May ‘20 Aug ‘20 Remaining Drop Shaft lining and Civil works

Today

Acton Storm Tanks Timeline

Project Duration: BMB took possession of the site in November 2017. The project will take just over four years to complete.

June‘19 Nov ‘20 Feb ‘22 Year 1 Year 2 Year 3 Year 4 Apr ‘19 Sep ‘18

slide-11
SLIDE 11

Acton Storm Tanks – Last 4 Months

Phased demolition below Overspill Channel Construction of Interception Chamber Construction of Air Treatment Chamber Construction below Overspill Channel

slide-12
SLIDE 12

Acton Storm Tanks

September 2019 – Demolition below Overspill Channel

slide-13
SLIDE 13

Acton Storm Tanks

October 2019 – Lower Chamber Wall Construction

slide-14
SLIDE 14

Acton Storm Tanks

November 2019 – Upper Chamber Wall Construction

slide-15
SLIDE 15

Acton Storm Tanks

December 2019 – Chamber Roof Construction

slide-16
SLIDE 16

Acton Storm Tanks

January 2020 – Construction below Overspill Channel

slide-17
SLIDE 17

Acton Storm Tanks – Next 3 Months

Completion of Interception and Inlet Chambers Installation of Ventilation Ducting & Backfill Construction of Bypass Damper Chamber Construction of Ventilation Column Substructure Demolition of Gallery Wall

slide-18
SLIDE 18

Acton Storm Tanks – Drop Shaft Internals

Vortex drop tube and approach structure Internal baffle and weir walls Cover slab and pressure relief structure Mainline tunnel connection works

slide-19
SLIDE 19

Landscaping

Majority of storm tanks area is hardstanding for operational access. Gabion wall structure to act as barrier to remaining storm retention area. Advance tree planting at Warple Way already in place. Soft landscaping to be implemented along northern Canham Road boundary including native wildflower meadow planting and native tree species including oak, cherry, hornbeam and birch.

slide-20
SLIDE 20

Community Engagement Katie Ashton, Communications Manager

slide-21
SLIDE 21

Community Engagement

  • 2 x Information notices sent out since last meeting for:

➢ 1 x Christmas Shutdown ➢ 1 x Road Closure & Demolition Works

  • 4 enquires received since last meeting:

➢ 2 x traffic and transport ➢ 1 x settlement deed ➢ 1 x site visit request All enquiries have been responded to within 24 hours (where possible)

slide-22
SLIDE 22

HOW TO MAKE A CLAIM IF YOU ARE AFFECTED BY TIDEWAY’S WORK

Who do I go to for advice?

  • Independent Advisory Service (IAS) Helpline for independent advice:

0800 917 8845 or info@tidewayias.co.uk

  • Tideway’s Compensation Officer, Louise Walsh, for personal

assistance and advice: via Tideway Helpdesk 08000 30 80 80 or helpdesk@tideway.london or direct 07971 077165 or louise.walsh@tideway.london How do I submit my claim?

  • Louise can submit your claim to the Independent Compensation Panel

(ICP) on your behalf, or

  • Y
  • u can submit your claim direct to the ICP: admin@tidewayicp.london
  • The IAS can send you a claim form, or you can download a claim form off

the Tideway website: www.tideway.london/help-advice/compensation-

information/Independent-Compensation-Panel

20

slide-23
SLIDE 23

Community Engagement

Continues in 2020 ….

  • Thames Water Network Challenge – 6 February
  • Acton Scouts STEM Event – 19 February
  • A.P.P.L.E site visit – 20 February
  • Resident visit – 27 February, 1-2.30pm. Register your place at

helpdesk@tideway.london

slide-24
SLIDE 24

Community Engagement

Legacy since 2016 Hammersmith and Fulham Acton

Community Investment Hours 2844 (including Tideway CI) 987 STEM Hours 1895 528 Volunteering commitments 1118 335 Work experience placement 18 placements from LBHF 69 placements at CARRR and HAMPS 1 placement at ACTST 10 placements from Ealing based on

  • ther sites

Summer placements 1 summer placement from LBHF 11 summer placements placed at CARRR/HAMPS 2 Schools engaged 13 7 BMB staff residing in area 123 9 Apprentices Apprentices working on any BMB site and residing in LBHF – 4 Apprentices working in HAMPS/CARRR

  • 12

Apprentices working at ACTST – 0 Apprentices working on any BMB site and residing in Ealing - 2

slide-25
SLIDE 25

How to stay up to date

Monthly tunnelling updates Information Sheets Quarterly Newsletter Community Liaison Working Group Meeting’s

If you would like to be added to our mailing list for works updates/notifications, email Helpdesk@Tideway.London

slide-26
SLIDE 26

How to stay up to date @TidewayLondon

www.linkedin.com/company/tideway-london/ twitter.com/TidewayLondon www.instagram.com/tidewaylondon/ en-gb.facebook.com/TidewayLondon/

slide-27
SLIDE 27

27

Overall Project Update

Jamie Gray

slide-28
SLIDE 28

Tunnel Boring Machine, Rachel, was launched from Carnwath Road in May 2019 and is making her journey to our Acton Storm Tanks site:

  • Various planned stoppages in June/July/August to install temporary logistics railway and

full tunnelling set up (e.g. conveyor belt system)

  • Distance tunnelled in a full productive week typically varies 130m-200m
  • Total tunnel length = 6.9km, currently at 2.9km

Tunnelling – Carnwath Road to Acton

Updated information regarding tunnelling via email is being sent to residents every month since October 2019, and will continue throughout the project

TBM Location Approximate Dates

Currently halfway between Putney Bridge and Hammersmith Bridge Today Passes beneath Hammersmith Bridge End-March Cuts inland northwards towards Acton Mid-May Passes to west of Stamford Brook tube station End-June Arrives at Acton August

slide-29
SLIDE 29

Where are the Tunnel Boring Machines?

The Tideway TBM tracker https://www.tideway.london/tbm-tracker/

slide-30
SLIDE 30

Building the Super Sewer

slide-31
SLIDE 31

31

Time-lapse video

Click the following link for our latest progress video:

https://www.youtube.com/watch?v=mRRJTvSra3A

slide-32
SLIDE 32

32

Questions