AE MC r e vie w of the DWGM APA pre limina ry c o mme nts 14 No - - PowerPoint PPT Presentation

ae mc r e vie w of the dwgm
SMART_READER_LITE
LIVE PREVIEW

AE MC r e vie w of the DWGM APA pre limina ry c o mme nts 14 No - - PowerPoint PPT Presentation

AE MC r e vie w of the DWGM APA pre limina ry c o mme nts 14 No v 2016 the c ar r ot is mightie r than the stic k thr oughout our c onsultation with the AE MC, we have tr ie d to maintain a pr inc iple d appr oac h: 1.


slide-1
SLIDE 1

AE MC r e vie w of the DWGM

14 No v 2016

APA pre limina ry c o mme nts

slide-2
SLIDE 2

2

the c ar r

  • t is mightie r

than the stic k

  • thr
  • ughout our

c onsultation with the AE MC, we have tr ie d to maintain a pr inc iple d appr

  • ac h:

1. Artic ula te the po lic y o b je c tive s; 2. I de ntify the b e ha vio urs so ug ht b y the pipe line r tha t will de live r tho se po lic y o utc o me s; 3. Cre a te inc e ntive s fo r the pipe line r to e xhib it tho se b e ha vio urs.

  • the dr

aft Re por t appe ar s to be long on r e quir e me nts and shor t on inc e ntive s

  • T

he mo re we try to a ntic ipa te future c irc umsta nc e s in a n a tte mpt to c o dify b e ha vio ur, the mo re like ly we a re to g e t it wro ng a nd de live r uninte nde d c o nse q ue nc e s.

  • I

f we de sig n a syste m with inc e ntive s fo r the pipe line o wne r to de live r the de sire d o utc o me s, we c a n a vo id hundre ds o f pa g e s o f Rule s ma nda ting b e ha vio ur

  • the r

e is no ne e d for the National Gas Rule s to blow out like the National E le c tr ic ity Rule s.

slide-3
SLIDE 3

3

the de vil is in the de tail

muc h of the de ta il ha s be e n de fe rre d to the Ga s Ma rke t Re form Group

  • “ho w the le ve l o f b a se line a nd a b o ve o f c a pa c ity wo uld b e d e te rmine d ;
  • “the c a pa c ity pro d uc ts to b e ma d e a va ila b le fo r sa le a t e a c h e ntry a nd e xit po int;
  • “ho w b a se line a nd a b o ve b a se line c a pa c ity wo uld b e a llo c a te d a mo ng st ma rke t

pa rtic ipa nts a nd ho w se c o nd a ry tra d ing wo uld b e e nc o ura g e d ;

  • “ho w inve stme nt in ne w b a se line c a pa c ity wo uld b e sig na lle d a nd a llo c a te d ; a nd
  • “wha t, if a ny c ha ng e s, ne e d to b e ma d e to the e c o no mic re g ula to ry fra me wo rk to

a c c o mmo d a te the c ha ng e ”

  • the GMRG ma y not be c onstitute d be fore the F

ina l re port is issue d

  • this de ta il will a ffe c t the e c onomic inte re sts of both pipe line r a nd

shippe rs

  • virtua l hub c o ntinuo us b a la nc ing vs time la g to d e live r g a s fro m L
  • ng fo rd
  • le ve l o f “Ba se line Ca pa c ity” a nd re mo va l o f “c o ng e stio n uplift”
  • we a re a lwa ys c onc e rne d a bout lifting mode ls from othe r pla c e s
  • the re ha s b e e n ve ry little priva te inve stme nt in the E

uro pe a n g a s pipe line ne two rk sinc e the e ntry-e xit mo d e l wa s intro d uc e d

  • we c anno t be sur

e if we suppo r t the pr

  • po se d mo de l
slide-4
SLIDE 4

4

alloc ation of institutional r

  • le s

AE MC pro po sa l – AE MO a s Syste m Ope ra to r: APA pro po sa l – AE MO a s Ma rke t Ope ra to r:

slide-5
SLIDE 5

5

have we ac c omplishe d what we se t out to ac c omplish?

a “c le an” pric e of gas

  • the propose d mode l doe s not appe ar to de live r this
  • the virtua l Hub with c o ntinuo us b a la nc ing d o e s no t c o pe with

d ispa tc h o f L NG to ma inta in syste m se c urity

  • “surprise uplift” re ma ins a fe a ture o f the virtua l hub
  • Q: ho w “d irty” is the c urre nt g a s pric e ? Will it b e a ny “c le a ne r”

und e r the ne w mo d e l?

de e p and liquid marke t

  • the propose d mode l doe s not appe ar to de live r this
  • the upstre a m se c to r ha s la rg e ly b e e n le ft o ut o f this d isc ussio n

inc e ntive s for inve stme nt

  • the propose d mode l doe s not appe ar to de live r this
  • the “fre e rid e r” pro b le m still e xists fo r d e e p a ug me nta tio n
  • this will still ne e d to b e d o ne thro ug h a re g ula to ry a ppro va l pro c e ss
  • a ll shippe rs will b e a b le to a c c e ss ne w c a pa c ity
  • inte ra c tio n with a uc tio n fo r e ntry a nd e xit rig hts?
slide-6
SLIDE 6

6

ar e as that ne e d mo r e de ve lo pme nt:

  • Alloc a tion of institutiona l role s
  • Pa rtic ula rly Syste m Ope ra to r
  • How the AE

R will de te rmine the le ve ls of ba se line e ntry a nd e xit c a pa c ity

  • Me c ha nic s of the e ntry- e xit c a pa c ity

a uc tion

  • How APA c a n be a ssure d of re c e iving

suffic ie nt re ve nue

ar e as in whic h APA is c o nc e r ne d:

  • Propose d hig h le ve l of re g ula tory

intrusion

  • Re turn to be c urta ile d to

re g ula te d le ve ls

  • L

a c k of sc ope for out- pe rforma nc e

  • And c o nside ra b le sc o pe fo r unde r-

pe rfo rma nc e

  • Sig na ls for a nd c e rta inty of inve stme nt

in summar y: the e ntr y- e xit mode l c ould wor k, but ne e ds mor e de ve lopme nt

APA do e s no t o ppo se the e ntry-e xit mo de l, b ut is c o nc e rne d ab o ut so me o f the ke y de sig n fe ature s mo o te d

It is c le ar that the AE MC will no t have se ttle d the se issue s be fo r e de live r ing its F inal r e po r t to Co AG and the Vic to r ian Go ve r nme nt.

slide-7
SLIDE 7

7

F

  • r furthe r info rma tio n c o nta c t:

Sc ott Young Re g ula tory Ma na g e r (02) 9275 0031 sc ott.young @a pa .c om.a u Or visit the APA we bsite a t: www.a pa .c om.a u