Affordable * Accessible * Energy-Efficient * Healthy * Safe * - - PowerPoint PPT Presentation

affordable accessible energy efficient healthy safe well
SMART_READER_LITE
LIVE PREVIEW

Affordable * Accessible * Energy-Efficient * Healthy * Safe * - - PowerPoint PPT Presentation

CHA Boar ard of Commi miss ssioner ners Genie e Roger ers Chair Affordable * Accessible * Energy-Efficient * Healthy * Safe * Well-Maintained Mary Anne e McCol Collum Vice e Chair Bob ob Hutton on Max Lewis Ed Robins nson Phil


slide-1
SLIDE 1

Affordable * Accessible * Energy-Efficient * Healthy * Safe * Well-Maintained

CHA Boar ard of Commi miss ssioner ners Genie e Roger ers Chair Mary Anne e McCol Collum Vice e Chair Bob

  • b Hutton
  • n

Max Lewis Ed Robins nson Phil Stein einha haus, s, CEO

slide-2
SLIDE 2

Public Housing –719 Units

  • Downtown Family Site – 294 Units
  • Bear Creek Family Site – 78 Units
  • Oak Towers – 147 Units (Elderly)
  • Paquin Tower – 200 Units (Disabled & Elderly)

2

CHA PUBLIC HOUSING PROPERTIES

Downtown Family Site Oak Towers Bear Creek Family Site Paquin Tower

slide-3
SLIDE 3

The CHA plans to renovate all 719 of our Public Housing units in five (5) phases from: 2014 – 2017. Rental Assistance Demonstration Program (RAD) – Convert to long-term contract rents – Project-Based Vouchers. Low-Income Housing Tax Credits (LIHTC) from MHDC – Combination of 4% & 9% credits.

3

PUBLIC HOUSING RENOVATION

slide-4
SLIDE 4

RAD - A new HUD Pilot Program

  • Designed to encourage housing authorities to transition from

the public housing financial model to the more stable Project- Based Section 8 model.

Conversion to Long-Term Contract Rents

  • The RAD Program allows housing authorities to convert their

unpredictable Public Housing subsidies to a long-term contract rent under the Project-Based Voucher Program (Section 8).

Substantial Renovation of Public Housing

  • The RAD conversion is based on the CHA renovating current Public

Housing stock to a level that may be sustained for 15 to 20 years.

4

RENTAL ASSISTANCE DEMONSTRATION (RAD) PROGRAM

slide-5
SLIDE 5

Public Housing RAD Renovation Phases

Phase Public Housing Sites Type & # of Units Rehab Level LIHTC Submission Date(s) 1 Stuart Parker 84 Townhomes Major 4% 5-2014 5-2014 Paquin Tower 200 High Rise Units Minor 2 Bear Creek 78 Townhomes Modest 4% 9-2014 3 Bryant Walkway 70 Townhomes Major 9% 9-2015 4 Oak Towers 147 High Rise Units Modest 4% 9-2015 5 Providence Walkway 70 Townhomes Major 9% 9-2016 6 East Park Avenue 70 Townhomes Major 9% 9-2017

5

slide-6
SLIDE 6

6

CHA Public Housing Properties in the “Heart of Columbia”

Stuart Parker Apartments Phase 1 - 84 Units * Also includes 200 Units At Paquin Tower (not shown) Bryant Walkway Apartments Phase 2 - 70 Units Providence Walkway Apartments Phase 4 - 70 Units East Park Avenue Apartments Phase 5 - 70 Units Oak Towers Phase 3 - 147 Units

slide-7
SLIDE 7

 No Re-screening of Tenants upon Conversion.

  • Pursuant to the RAD statute, at conversion, current households are not

subject to rescreening, income eligibility, or income targeting provisions.

 Right to Return.

  • Any residents that may need to be temporarily relocated to facilitate

rehabilitation or construction will have a right to return to the development

  • nce rehabilitation or construction is completed.

 Renewal of Lease.

  • Under RAD, the PHA must renew all leases upon lease expiration, unless

cause exists.

 Phase-in of Tenant Rent Increases.

  • If a tenant’s monthly rent increases by more than the greater of 10 percent
  • r $25 purely as a result of conversion, the rent increase will be phased in
  • ver 3 years, which a PHA may extend to 5 years.

7

slide-8
SLIDE 8

 Public Housing Family Self Sufficiency (PH FSS) and Resident Opportunities and Self Sufficiency Service Coordinator (ROSS- SC) programs.

  • Current PH FSS participants will continue to be eligible for FSS once

their housing is converted under RAD. Current ROSS-SC grantees will be able to finish out their current ROSS-SC grants once their housing is converted under RAD.

 Resident Participation and Funding.

  • Residents of covered projects converting assistance to PBVs will have

the right to establish and operate a resident organization for the purpose of addressing issues related to their living environment and be eligible for resident participation funding.

8

slide-9
SLIDE 9

 Resident Choice and Mobility.

  • One of the major benefits of the RAD program is that the program

greatly enhances the choice and mobility of Residents living in the converted Public Housing units.

  • The units will be converted to Project-Based Vouchers (PBV), in which

residents may move out of the converted Public Housing development with housing assistance after living there for one year.

  • Once this residency requirement has been met, the Resident may be

issued a Section 8 Housing Choice Voucher if they choose not to renew their lease. The Resident can use their voucher anywhere in Columbia and Boone County and may also “port-out” to another PHA with their voucher and continue to receive housing assistance through the new PHA.

9

slide-10
SLIDE 10

Lincoln Dr. Unity Dr.

  • W. Worley St.

Oak St. Hicks Dr. & Paquin Tower

10

OUR FIRST PROJECT: STUART PARKER APARTMENTS WITH PAQUIN TOWER

slide-11
SLIDE 11

 Relocation Begins August, 2015  Construction Begins September, 2015

  • Starting With Relocation of all 2nd Floor Residents
  • 2nd Floor Completely Renovated
  • 3rd Floor Residents Will Move Down to the 2nd Floor.
  • 3rd Floor Completely Renovated, etc.

 Construction Ends April, 2017

11

TENTATIVE CONSTRUCTION SCHEDULE PAQUIN TOWER

slide-12
SLIDE 12

Exterior Improvements Parking lot repairs - Asphalt Replacement, Replace parking lot concrete and snow melt system. Lighting- Install New LED light fixtures around the exterior of the building. Painting – Power wash the exterior of the building, replace all caulking and paint the exterior.

12

PLANNED RENOVATIONS PAQUIN TOWER

slide-13
SLIDE 13

Common Areas Elevator upgrades – New cabs, doors, door

  • perators, machines, drives & call buttons.

Trash Chute – Clean chute, new doors, sprinkler heads and add chemical cleaning. Boiler Room Backflow Preventers Drop Ceilings – Replace ceiling grids and ceiling tile.

13

PLANNED RENOVATIONS PAQUIN TOWER

slide-14
SLIDE 14

Common Areas Exit & Emergency Lights – Remove and replace. Floor Tile – Replace existing floor tile and cove base with new laminated flooring. Painting – Paint hallways, door jams and door

  • frames. (New Colors)

14

PLANNED RENOVATIONS PAQUIN TOWER

slide-15
SLIDE 15

Apartment Interiors Bathrooms – Remove the existing shower wall panels and refinish the terrazzo floors in the bathroom and shower area. Includes epoxy finish on the walls of the shower. Install new grab bars in the shower and at the toilet. Plumbing – Remove and replace the drain line piping in the walls for the kitchen and bathroom sinks. Jet Clean all sewer stacks

15

PLANNED RENOVATIONS PAQUIN TOWER

slide-16
SLIDE 16

Apartment Interiors Kitchen – Replace the kitchen cabinets, sink, faucet, range and refrigerator. Doors – Replace the apartment door, locks, hardware and signage. Lighting – Replace all of the existing light

  • fixtures. (Kitchen fixture will remain).

16

PLANNED RENOVATIONS PAQUIN TOWER

slide-17
SLIDE 17

Apartment Interiors Smoke Detectors – Install new detectors and add additional detectors. Flooring - Remove and replace floor tile and cove base. (New Colors) Painting – Paint all apartments (New Colors)

17

PLANNED RENOVATIONS PAQUIN TOWER

slide-18
SLIDE 18

All Residents will get a 30 Day Notice Before Moving. No Need to Prepare for Move Until Contacted by Relocation Coordinator Relocation Coordinator: Katie Howard Phone: 573-443-2556 Ext. 1110 Email: khoward@columbiaha.com

18

RELOCATION OPTIONS “STUART PARKER” (UNITY/ LINCOLN /HICKS)

slide-19
SLIDE 19

 Rent will continue to be based on income.

  • Residents will not experience any change in rent.

 All moving costs & related expenses paid by the CHA.  Most Residents will only move one time.  All Residents may move with a Section 8 voucher after 1 year or anytime after at the time of their lease renewal.

19

SUMMARY OF KEY POINTS PAQUIN TOWER

slide-20
SLIDE 20

Thank you! Questions?

20

“STUART PARKER” (UNITY/ LINCOLN /HICKS)