AHTD Job 061275 Arkansas River Str. & Apprs. (Broadway) (LR/NLR) P.E. Public Officials Meeting February 7, 2012 Location Map Location Map South Side of River North Side of River Lane Configuration Typical Section Bridge Selection
SLIDE 2
SLIDE 3
Location Map
SLIDE 4
South Side of River
SLIDE 5
North Side of River
SLIDE 6
Lane Configuration
SLIDE 7
Typical Section
SLIDE 8
Bridge Selection Study Goal of Study– Develop bridge types that accomplish two main objectives:
- Minimize Bridge Closure Time
- Most Cost Effective Structure Type
SLIDE 9
Bridge Selection Study
SLIDE 10
Bridge Selection Study
SLIDE 11
Bridge Selection Study
SLIDE 12
Bridge Selection Study
SLIDE 13
Bridge Selection Study
SLIDE 14
Bridge Selection Study
SLIDE 15
Bridge Selection Study
SLIDE 16
Bridge Selection Study Road User Cost The financial impact of the bridge closure
- n the traveling public.
- Takes into consideration expense of
traffic delays and additional miles traveled on alternate routes
SLIDE 17
Bridge Selection Study
SLIDE 18
Bridge Selection Study
SLIDE 19
Bridge Selection Study
SLIDE 20
Bridge Aesthetics
SLIDE 21
Pedestrian Underpass at Ballpark
SLIDE 22
Concept 1A
SLIDE 23
Concept 1A – Closed Barrier
SLIDE 24
Concept 1A – Open Rail
SLIDE 25
Concept 1B
SLIDE 26
Concept 1B – Closed Barrier
SLIDE 27
Concept 1B – Open Rail
SLIDE 28
Concept 2
SLIDE 29
Concept 2 – Closed Barrier
SLIDE 30