Austria Showcase
Austrian Railway Technology
Bangkok 8th June 2011
- Dr. Friedrich Prinzl
Austrian Railway Technology Dr. Friedrich Prinzl Bangkok 8 th June - - PowerPoint PPT Presentation
Austria Showcase Austrian Railway Technology Dr. Friedrich Prinzl Bangkok 8 th June 2011 GEOCONSULT GE OCONS ULT An Engineering & Consultancy Group in the disciplines of civil, structural and geotechnical engineering, soil & rock
M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt
2
Geoconsult Wien ZT GmbH Vienna, Austria GC Buenos Aires S.A. Geoconsult Holding ZT GmbH Salzburg, Austria Geoconsult AS PTE LTD Geoconsult spol.sro Bratislava, Slovak Republic
M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt
3
Geoconsult ZT GmbH Salzburg, Austria Geoconsult India Pvt. Ltd. Gurgaon, India GC Buenos Aires S.A. Buenos Aires, Argentina Geoconsult AS PTE LTD Singapore GC Latinoamerica Ltda Santiago de Chile, Chile GC Deutschland Freilassing, Germany GC Sao Paulo Sao Paulo, Brazil
M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt
4
Tunnels Dernbach, Deesener Wald, Hellenberg
M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt
5
Stuttgart 21, Wendlingen – Ulm (Contract PA2.1 “Alpvorlandtunnel”)
C230, C240, C260
M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt
6
Length: 32.8 km, excavation: TBM, partly NATM Excavation area: 77 – 95 m2,
Services for Main Tunnel & Exploration Measures:
Feasibility and route selection studies
Austria
M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt
7
Preliminary design and project Environmental Impact Assessment incl.cost estimates on probabilistic data base, risk analysis, public relations procedure Hydrogeological investigation, mapping and monitoring
Preparation of tender documents & tender design Detailed design Geotechnical services on site Construction management
Entire route: approx. 41 km Section length with GC involvement: approx. 27 km;
Austria
M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt
8
Preliminary project, public inquiry, Tender design and preparation of tender documents, detailed design, geotechnical services on site, construction supervision
Brixlegg (7,420 m), Jenbach (4,793 m) and Stans/Terfens (8,500 m)
Radfeld (appr. 790 m), Brixlegg East (appr. 1,600 m), Brixlegg West (River Inn crossing – appr. 1,800 m), Münster (approx. 1,200 m)
C230: 8 tunnels, total length appr. 6 km C240: 11 tunnels, total length appr. 6 km C260: 7 tunnels, appr. 9 km; Geology: Soft rock; mined tunnels: NATM, pipe roof Services:
M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt
9
Services: C230 & C240:
BOT Tender preparation for the Client, Detailed Design for Mined Tunnels and C&C, Geological Mapping of Alignment and Portal Areas, Geotechnical Services during Construction, Design of Standard Cross-Sections, Geological and Geotechnical Training
C260:
BOT Tender preparation for the Client, Geological Mapping of Alignment and Portal Areas, CICE for Design (Contractor’s Independent Checking Engineer)
galleries and temporary invert)
soils; Line 5/9, Contract Section 2, ground treatment)
Seoul
M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt
10
NATM to Hongkong)
Singapore
Washington
M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt
11
Bangkok
Participation in Lines 2, 4, 5 in several sections of the system, either for design services (all phases) and for construction supervision or technical assistance Length: more than 60 km of running tunnels Stations: more than 25 stations with excavation cross sections from 160 – 180 m2 (partly C&C, partly mined) Examples of Geoconsult’s Services:
M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt
12
Examples of Geoconsult’s Services:
Extension of Line 2 from station Dorsal at Avenida Recoletta to Avenida Americo Vespuci Structures: Mined station (NATM) including access and platform tunnels; cross section area: 125 – 150 m2; various emergency exits and ventilation shafts, single track running tunnel: 2.7 km; cross section area: 50 – 66 m2 Services: General project, tender design and documents, detailed design, construction supervision.
North East Line, Contract 704 & 706 and Circle Line, Contract 822, 825, 854, 855, 856 Downtown Line, Contract C905, C916, C917, C918, C919, C921 Details NEL C704:
Bored tunnels (EPB shield), single track, two tubes, inner diameter: 5.8 m
M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt
13
two tubes, inner diameter: 5.8 m Length (C704): 2 x 2,5 km, 2 x 1,5 km
Geoconsult’s Services
Geotechnical assessment, evaluation of available data, assessment of design parameters as well as recommendations for construction, Detailed design, Design of bored tunnel precast concrete lining, Design of steel segments for bored tunnels at cross passage openings, Temporary support and permanent lining of cross passages and pump sumps, Assessment of surface settlements, Assessment of building damages
Metro Delhi, Line 2, Contract MC1B (Chawri Bazaar Station) Details: Metro Delhi Airport Link NATM C6 Package
2-tracked Metro Tunnel in hard and soft rock (quarzite and alluvium: sandy to clayiy silt) Velocity: 135 km/h, low overburden (~15 m),
M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt
14
NATM tunnel length: approx. 2300m, Cross section: ~85m² Cut and Cover tunnel length: appr. 300m, Cross section: ~85m², low overburden: 1,5 – 20 m 4 NATM start shafts – 2 constructed as ventilation shafts.
Geoconsult Services:
tender design, detailed design of double track running tunnel (excavation and support by NATM), ventilation shaft and building, interim NATM access shaft, cut and cover section, ramp section, preparation of geotechnical interpretative report, design coordination, advise during construction on site, geotechnical interpretation and evaluation of monitoring results
Survey, customized underground & surface monitoring programms, steering systems for TBM, tunnel scanner, installation & monitoring of instruments, collecting, surveying & analyzing measurements, data acquisition, data management
Metro de Santiago, Santiago, Chile
Extension of Lines 5 and 2, 6 km NATM tunnel excavation D-displacement monitoring, precise levelling, geotechnical instrumentation and automatic
M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt
15
monitoring, precise levelling, geotechnical instrumentation and automatic data acquisition system during river undercrossing
Taiwan High Speed Rail C240, Miaoli, Taiwan
11 tunnels, total length of 7.4 km; Optical 3D displacement measurements, geotechnical instrumentation (Extensometers with electrical displacement transducers, electrical radial pressure cells and strainmeters)
Penstock Kaprun, HPP Glockner-Kaprun, Austria
New penstock: 870 m long 45°inclined shaft and 450 m long shallow tunnel; tunnel surveying of the TBM excavation, networks measurement and azimuth determinations by using the Gyromat 2000
Design and Construction of Stations and Running Tunnels between Tiam Ruam Mit and Bang Sue. The scope of works included the detailed design for the twin bore running tunnels, cross passages and intervention shafts Project period: 1997 – 2000
M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt
16