C O R P O R A T E A L I G N M E N T L O G O C P F A B R I C A T I O N A N D T R A D I N G L T D . C O . Capacity (tons/year) Operational in 2002 as a Pipe Spool Shop Spool Works : 42,000 Now an integrated Spool, Fitting &
SLIDE 2
SLIDE 3
C P F A B R I C A T I O N A N D T R A D I N G L T D . C O .
Capacity (tons/year)
- Spool Works : 42,000
- Fitting Works: 12,000
- Pipe Works: ~ 150,000 (Line Pipes)
~ 60,000 (Process Pipes)
- Operational in 2002 as a Pipe Spool Shop
- Serving OG&C, Power, Construction,
Metals & Mining, Water Industries
- Now an integrated Spool, Fitting & LSAW Pipe Shop
SLIDE 4
C P F A B R I C A T I O N A N D T R A D I N G L T D . C O . L o c a t i o n
2 hrs./200 km from Istanbul
GEMLİK
RODA Port BORUSAN Port YILPORT | GEMPORT
Ports
2 km from 3 International Deep Sea Ports
SLIDE 5
C O R P O R A T E M V V
SLIDE 6
C I M T A S G R O U P A b o u t
- A subsidiary of ENKA
- Incorporated in 1973 in Turkey as a local steel fabricator now an EPFI group of 5 companies:
Gemlik, Turkey:
- Cimtas Steel,
- Cimtas Pipe Fabrication and Trading Ltd. Co.,
- Cimtas Precision Machining Industries and Trading Ltd. Co.
Kocaeli, Turkey:
- Cimtas Module and Shipyard,
Ningbo, China:
- Cimtas Ningbo Modular Skids Pipe Spools
- 3,500 people including 355 engineers
- With Activities in
- Engineering (structural, pressure vessels, piping, plant engineering)
- Fabrication (7 shops including pipe and fitting manufacturing shops,
6 in Turkey & 1 in China, over 320,000 tons/year total capacity)
- Modularization (Pre-assembled racks, Pre-assembled units)
- Installation - Structural & Mechanical & Electrical (domestic and overseas jobsites)
- Shipbuilding (power ships, barges, tankers / gas carriers)
www.cimtas.com www.cimtaspipe.com www.cimtasmachining.com www.cimtasshipyard.com www.cimtasnbo.com
SLIDE 7
C I M T A S G R O U P L o c a t i o n s
SLIDE 8
- Founded in 1957
- A group of companies composed of more than 50 subsidiaries operating in 7 major geographical
areas: CIS, Asia, Middle East, Europe, America, Africa & Turkey
- More than 514 projects in 45 countries, with historical value of $45 B
- Turnover $3 B (2018)
- Amongst the top 100 international construction contractors of the World since 1982
- Ranked #92 in ENR Top 250 International Contractors in 2019
- More than 20,000 people
- Traded publicly in Borsa Istanbul (BIST) with a Market Cap of more than $7.2 B
- Holds ISO 9001 & 14001, OHSAS 18001 and ASME Certificates
- Shares the vision & goals of its customers, adopts to their needs and to local conditions
BUSINESS LINES:
- Engineering & Construction, Power, Real Estate, Trade
SLIDE 9
C P I N T E G R A T E D P I P I N G S O L U T I O N S O n e s t o p s h o p p i n g
SLIDE 10
- Seamless Integrated Piping Solutions;
▪ LSAW Pipe & Fitting & Prefabricated Pipe Spool @ single location
- Integration asset;
▪ Continuous flow ▪ Expediting and transportation thru single source & location ▪ Shortest lead time from pipe to spool ▪ Largest manufacturing & fabrication capacity @ single location
- High flexibility, prioritized fabrication/manufacturing as per project requirements
- Lean production culture, team organization, continuous improvement
- High quality, critical to quality and best practices
- Proactive team and push/pull role
C P I N T E G R A T E D P I P I N G S O L U T I O N S
SLIDE 11
C P I N T E G R A T E D P I P I N G S O L U T I O N S W h y C i m t a s P i p e INDUSTRY STANDARD
LSAW Pipes Fittings Pipe Spools C o n v e n t i o n a l S o l u t i o n : T y p i c a l , 7 - 8 M o n t h s D e l i v e r y T i m e f r o m o r d e r t o F i r s t S p o o l Multiple: POs, Suppliers, Locations Single: PO, Supplier, Location Singular Fulfillment w/Separate Tasks: Seamless Fulfillment w/Integrated Task: @Multiple Suppliers PO Preparations PO Placements Contacts POs Expediting Quality Inspections Customs Works Paperwork Multiple Transportation Standard Execution @Single Supplier PO Preparation PO Placement Contact PO Expediting Quality Inspections Customs Work Integrated Paperwork No Inter-Supplier Transportation Seamless Execution (Industry Pioneer)
CIMTAS PIPE
I n t e g r a t e d S o l u t i o n : N e w E r a , S u b s t a n t i a l l y F a s t e r D e l i v e r y T i m e f r o m O r d e r t o F i r s t S p o o l
SLIDE 12
SLIDE 13
- Continuous and paperless production flow
@ 2 Bays of 200 & 230m (656 & 755 ft)
- 25,000 sqm fenced area (265,000 sq ft)
- 14,000 sqm covered area (160,000 sq ft)
- Yearly Manufacturing Capacity: ~ 150,000 tons
(Line Pipes) , ~ 60,000 tons (Process Pipes)
L S A W P I P E W O R K S A b o u t
- Advanced
technology with hi-tech machinery following Industry 4.0 era
- Flexible manufacturing capability of
Carbon, Alloy and Stainless Steel Pipes @ single location
- Operational since July, 2017
SLIDE 14
L S A W P I P E W O R K S P r o d u c t i o n R a n g e
Pipe Diameter : 16” – 64” (406 - 1,626 mm) Pipe Length : 6 - 12.2 m (20’ - 40’) Thickness : 8 - 70 mm (0.32” – 2.75”) Multiple production solutions for manfacturing different diameter & thickness combinations:
- JCO Bending + Post Bending + Calibration & Straightening
- JCO Bending + Post Bending + Mechanical Expander
- Edge Crimping + JCO Bending + Calibration & Straightening
- Edge Crimping + JCO Bending + Mechanical Expander
Multiple metallurgies capability:
- Carbon Steel
▪
API 5L Grades
▪
ASTM A671, A672.. Grades
- Stainless Steel
▪
ASTM A358
- High Yield Carbon Steel
▪
API 5L X Grades
- Alloy Steels
SLIDE 15
D I F F E R E N T I A T O R S
S A F E T Y & E N V I R O M E N T
- Zero Accident (Corporate HSE) Programme
- OHSAS regulation
- Risk Analysis & Lessons Learned
- 5S Programme
- LEED Gold Certified, Globally First
- Effective use of Energy
R E L I A B I L I T Y
- Preferred Partner
- Proprietary Privilege & Code of Conduct
- Sustainability
- On Time Delivery
- Least Total Installed Cost
- Effective use of Advanced Technology
E F F I C I E N C Y
- Integrated Piping Solutions (IPS)
- State-of–the–art facility
- Lean Programme & Kaizen Workshops
- Continous & Paperless Flow
- Multiple Award Winner with Proven Flexibility
- Advanced Technology & Information Systems
W O R L D C L A S S Q UA L I T Y
- High-tech Machinery
- Multi-Metallurgy Manufacturing
- Excellence in Services
- Proven Quality Assurance Systems
- Wide International Experience
- Skilled & Dynamic Personnel
SLIDE 16
Welding Expertise
- 11 EWE – European Welding Engineers
- To date;
- 2,500 WPQR/WPAR and 5,950 WPS Prepared
- +15,000 Welders Qualified
Mechanical & Metallographic Test Laboratory (ISO 17025 Certified)
- Tensile Test (including elevated temperatures)
- Bend Test
- Charpy Impact Test
- Fully Automated Micro &
Macro Hardness Test ▪ HRB-HRC-HBW-HV
- Metallographic Analysis
(Macro and Micro)
- Spectrometric Chemical Analysis
- Intergranular Corrosion Test
C E N T E R O F E X C E L L E N C E W e l d i n g , L a b o r a t o r y & T e s t i n g
SLIDE 17
SLIDE 18
L S A W P I P E W O R K S P r o d u c t i o n F l o w
SLIDE 19
- Prime supplier; unique design, engineering and production
- Globally proven industry leading technology
- 52,000 kN high capacity bending press
- Deflection compensation eliminating lower tool change
J C O F O R M I N G K e y M a c h i n e s
SLIDE 20
- Prime supplier; unique design, engineering and production
- Post bending utilizing press technology instead of rollers
- 15,000 kN capacity for bending straight edges up to wall thickness: 45 mm
- Minimized Lower Tool change
P O S T B E N D I N G K e y M a c h i n e s
SLIDE 21
- Heat Treatment possibility by two different methods:
▪ Batch Type Furnace
- Maximum temperature: 1,200˚
C
- 80 ton capacity with 2 doors & 2 cars
▪ Induction Technology
- Annealing & Normalizing by custom made (designed, engineered & produced)
high-tech induction equipment (Max. Temp.: 1,200˚ C )
H E A T T R E A T M E N T K e y M a c h i n e s
PWHT & Normalizing in Batch Type Furnace Induction Technology
SLIDE 22
- Unique design, multi-purpose forming press
- 35,000 kN high capacity
- Multi-purpose functionality for:
▪ Calibration (for roundness) ▪ Straightening (for banana form) ▪ Crimping (for pre-bending)
C A L I B R A T I O N A N D C R I M P I N G K e y M a c h i n e s
Calibration Function Crimping Function Straightening Function
SLIDE 23
F U L L B O D Y M E C H A N I C A L E X P A N D E R K e y M a c h i n e s
- Globally proven, prime supplier
- Full body length up to 12 m
- Including pre-wash and post-wash systems
- Main cylinder of maximum 1,500 tf
- Fully automatic controlled
- Quick changing tool system
SLIDE 24
- Globally proven industry leading technology
- Latest phased array technology
- Meeting the demanding industry requirements
U L T R A S O N I C T E S T I N G Ke y M a c h i n e s
- Laser Seam Tracking
- Sector scan to optimize the angle of
incidence and focus length
- Multiple probes based on wall thickness for
weld zone
SLIDE 25
- Digital Radiography allowing real time inspection
- YXLON MG 450/4.5 technology
- 450 kVA power to cover complete thickness range
R A D I O G R A P H I C T E S T I N G K e y M a c h i n e s
SLIDE 26
- 350 bar maximum testing pressure
- 30,000 kN maximum pressing force
- Moving head and custom engineered air exhausting system
H Y D R O S T A T I C T E S T I N G Ke y M a c h i n e s
SLIDE 27
- Unique design with multi-measurement
purpose
- In-line and Autonomous Pipe
Measurement System
- Measurement of;
- Real time & on-line data
integrated with Plant ERP System
- High-end Laser Technology
- Data Analysis, Quality Conformance and 3D
Monitoring Software pursuing the International Standards (API, ASTM, etc.)
3 D M e a s u r i n g S y s t e m K e y M a c h i n e s
▪ Diameter ▪ Shape ▪ Length ▪ Straightness and Weld Bead
SLIDE 28
SLIDE 29
I n - H o u s e B l a s t i n g & C o a t i n g L S A W P I P E W O R K S
In House Capabilities
- Multi-Layer Epoxy Lining & Coating
- Polyurethane Lining & Coating
- 3 humidity & temperature controlled coating
bays with total 4,860 sqm closed area
- Automated
internal & external blasting machines
- 7 manual blasting cabinets
- Coating capacity of 20,000 sqm per month
SLIDE 30
S u b - C o n t r a c t i n g C o a t i n g & L i n i n g L S A W P I P E W O R K S
Partnering with BORUSAN Group;
- Over 25 years business relationship & partnering
- Partnering Outlooks with:
- Borusan Port – Loading & Unloading & Storage
- Borusan Logistics – Freight Forwarding & Logistics
- Borusan Mannesmann – Coating & Lining
Single & Easy Route (2 km); Cimtas > Borusan Mannesmann > Borusan Port
SLIDE 31
S u b - C o n t r a c t i n g C o a t i n g & L i n i n g Borusan Mannesmann Boru Capabilities
- Range
▪ Length: 6 – 24 m (20’ – 80’) ▪ Diameter: 20" – 120" (508 – 3,048 mm) ▪ Capacity: 3,000 sqm/shift
L S A W P I P E W O R K S
- Quality; Certification & Standards
▪ Dual Layer Abrasion Resistant FBE OD Coating: API 5L7, CSA Z 245-20, NACE RP 0394, AWWA C213 ▪ FBE (Fusion Bonded Epoxy) OD Coating: API 5L7, CSA Z 245-20, NACE RP 0394, AWWA C213 ▪ Polyethylene OD Coating: DIN 30670, TS 5139, NF A 49-710, UNI 9099, EN ISO 21809-1 ▪ Polypropylene OD Coating: DIN 30678, NF A 49-711, EN ISO 21809-1 ▪ Flow Coat Epoxy ID Coating: API RP 5L2, EN 10301 ▪ Epoxy ID Coating: AWWA C 210 Type OD ID
Fusion Bonded Epoxy (FBE) Dual Layer FBE (ARO) Epoxy 3 Layer Polyetyhlene (3LPE) 3 Layer Polypropylene (3LPP) Cement
- Coating & Lining Scope
SLIDE 32
L S A W P I P E W O R K S S u b - C o n t r a c t i n g C o a t i n g & L i n i n g Other Coating & Lining Sub-Contractors
- 4 sub-contractors located in Turkey
- Proven experience
- Coating & Lining Scope
Type OD ID
Epoxy Polyurethane (PU) Concrete Weight Coating (CWC) Insulating Foam Fusion Bonded Epoxy (FBE) Dual Layer FBE (ARO) 3 Layer Polyetyhlene (3LPE) 3 Layer Polypropylene (3LPP) Cement
- Logistics & Proximity
SLIDE 33
L S A W P I P E R E F E R E N C E S
SLIDE 34
C I M T A S P I P E G R O U P B U S I N E S S R E F E R E N C E S
SLIDE 35
C P F A B R I C A T I O N A N D T R A D I N G L T D . C O . C e r t i f i c a t e s
SLIDE 36
C P F A B R I C A T I O N A N D T R A D I N G L T D . C O . A w a r d s
SLIDE 37