and capacity issues to 2041.
station, improve the transportation network to better serve the surrounding area, and support area growth to 2041.
facilities.
5
ALTERNATIVE SOLUTIONS
EVALUATION CRITERIA & PUBLIC CONSULTATION
ALTERNATIVE DESIGNS
EVALUATION CRITERIA & STAKEHOLDER CONSULTATION
RECOMMENDED WAY FORWARD
PUBLIC CONSULTATION
PREFERRED ALTERNATIVE
WE ARE HERE
BACKGROUND STUDIES
6
Key Issues
Agencies
Communication Channels
7
8
9
QEW:
Southbound at/over capacity South Service Road:
the QEW Interchange
area experiencing queues and delays
Intersection of South Service Road and Casablanca Boulevard
10
Casablanca Blvd. Between South Service Road and Livingston Ave.:
Crossing
with South Service Road
Casablanca Blvd. Between Livingston Ave. and Main St. West:
delays
11
12
13
Feedback on Preliminary Design - Survey #2
Segment Support from Survey Respondents Concerns/Comments to be Addressed through Detailed Design
Ramp Signalization with Active Transportation
Good Good Good
Diverging Diamond Interchange
Limited Limited Limited
Ramp Signalization & Active Transportation Improvements – Multi-Use Path
14
RECOMMENDED DESIGN
RAMP SIGNALIZATION WITH ACTIVE TRANSPORTATION IMPROVEMENTS – MULTI-USE PATH ALONG THE WEST SIDE
15
16
Signalized Intersection
Alternative Designs Considered
17
SOUTH SERVICE ROAD – DESIGN AND TRAFFIC SIGNALS
Signalized Intersection
Alternative Designs Considered: Intersection at Casablanca Boulevard
18
SOUTH SERVICE ROAD ACCESS Alternative Designs Considered
OPENING DAY: LEFT TURN ACCESS FUTURE CONDITION: LOOP ROAD ACCESS
19
20
Feedback on Preliminary Design - Survey #2
Segment Support from Survey Respondents Concerns/Comments to be Addressed through Detailed Design
Maintain At-Grade Crossing (Medium Term)
Good Limited Good
Protect and Plan for Grade Separation (Long Term)
Improved At-Grade Crossing (2021) Improved At-Grade Crossing with 3rd SB lane (2031)
Note: Consultation with Rail corridor
during the Detailed Design process
21
2021 OPENING DAY AT-GRADE TREATMENT
22
2031 INTERIM AT-GRADE TREATMENT
23
24
Feedback on Preliminary Design - Survey #2
Segment Support from Survey Respondents Concerns/Comments to be Addressed through Detailed Design 4 Travel Lanes + Centre Turning Lane, sidewalk and cycling lanes
Widening: 5 Lanes Between South Service Road and Livingston Avenue
CASABLANCA BLVD – BETWEEN SOUTH SERVICE RD AND LIVINGSTON AVE. Alternative Designs Considered
25
Casablanca Boulevard Between South Service Road and Livingston Avenue
26
Feedback on Preliminary Design - Survey #2
Segment Support from Survey Respondents Concerns/Comments to be Addressed through Detailed Design 2 Travel Lanes + Centre Turning Lane, sidewalk and cycling lanes
Widening: 3 Lanes Between Livingston Avenue and Main Street West
CASABLANCA BLVD – BETWEEN LIVINGSTON AVE. AND MAIN STREET WEST Alternative Designs Considered
27
Casablanca Boulevard Between Livingston Avenue and Main Street West
28
29
Infrastructure to be determined
Future Site of Transit Infrastructure and future potential south GO Transit Station Parking
turning lane, with sidewalks and cycling lanes on each side
30
Feedback on Preliminary Design - Survey #2
Segment Support from Survey Respondents Concerns/Comments to be Addressed through Detailed Design 2 Travel Lanes + Centre Turning Lane, sidewalk and cycling lanes
Widening: 3 Lanes Between Casablanca Blvd. and Region-owned Lands
LIVINGSTON AVE. WEST OF EMILY STREET
Alternative Designs Considered
31
Livingston Avenue – From Casablanca Boulevard to the edge of the Region-
32
33
PUBLIC INFORMATION CENTRE #2
PREFERRED ALTERNATIVE DOCUMENTATION
WE ARE HERE
ENVIRONMENTAL STUDY REPORT FILING DETAILED DESIGN TENDERING AND CONSTRUCTION
PUBLIC INFORMATION CENTRE #3
January 2019 February 2019 Spring 2019 Summer 2019 - 2021