SLIDE 7 7
Determining the Number of Kanbans Needed
13
N = DT(1+X) C
N = Total number of kanbans D = Planned usage rate of using work center T = Average waiting time for replenishment of parts plus average production time for a container of parts X = Policy variable set by management – possible inefficiency in the system C = Capacity of a standard container
Conclusion
Lean Production is suitable for assemble to stock, high
volume and low variety production.
The goal is to achieve a balanced, smooth flow of production. Key elements include quality at the source, elimination of
waste, continuous improvement, setup time reduction, workload leveling, kanban control.
There is more to a successful operational turnaround than
the application of a set of tools. 是信仰,不是技術
Mindsets of employees must be involved in the process.
14