SLIDE 1
Codes & Standards By: Kim Caron Director of Business - - PDF document
Codes & Standards By: Kim Caron Director of Business - - PDF document
Central Station Interface with Fire Alarm and the Relevant Codes & Standards By: Kim Caron Director of Business Development Communication Paths History Panel Testing Requirements ULC Listed Station requirements ULC S561
SLIDE 2
SLIDE 3
POTS: Plain old telephone line GSM: cellular IP: Internet Protocol
SLIDE 4
Panel connection from the fire alarm panel Contact ID and SIA are standard
transmission protocol
Mediums : POTS, IP and GSM Dual path required
SLIDE 5
History
POTS have been used for monitoring with the majority monitored fire alarm systems across Canada.
Dual path POTS. Was designed to have a back up should one line fail.
GSM - Cellular Network
Advancement of technology allows signal transmission via cellular network. Most manufactures use the Rogers Network. Coverage throughout Canada is increasing. Can be weak in areas. VERY Important to ensure a strong signal strength at time of installation to eliminate future problems.
SLIDE 6
IP – Internet Protocol Needs to be used in combination with
another medium. Not reliable to be used as
- nly communication path.
Internet connection not always stable and
does drop from time to time, depending on the carrier.
Back up power supply required to assist
during power fails.
SLIDE 7
ULC accepts any of the following
combinations:
POTS (dual path, grandfathered) POTS / IP POTS / GSM IP / GSM GSM Supervised (polled every 90
seconds by station received and 180 seconds by Fire Panel)
Above may vary depending on panel
manufacture
SLIDE 8
Codes
Fire Alarm, Fire Trouble, Supervisory, AC
Fail, Low Battery
Alarm transmission codes are
programmed in the Fire Panel by the installing company.
Panel sends the codes directly to the
dialer which transmits to the Central Station.
Exception one communicator has 4
codes preprogrammed.
At time of Installation the installing
company MUST test all programmed codes and provide descriptions to the central station.
SLIDE 9
Each panel manufacture does things a little
different and the installing company should be trained by the manufacture prior to installing.
SLIDE 10
Process may vary slightly from station
to station.
Installer calls station prior to install Gives account number, along with
pertain information such as panel type, medium, and time line to have account in “Test”.
Installer needs to ensure the test all
codes that will be set to the station on each path of communication.
Once completed all signals need to be
verified with the station and full descriptions are required for all code.
SLIDE 11
Communication to the station is very
important.
We are very good at the service we
provide
However we are not mind readers Never assume we know what each
supervisory or trouble indicates.
Nothing worse than telling a customer or
Dealer a trouble reported without an explanation to back it up.
SLIDE 12
Ensure the Cellular communicator is
showing a “Strong” signal strength
Ensure the zone tripped is sending the
correct code identifier
Ensure IP supplier offers a good service.
Otherwise it can cause customer and installing company frustration on high volume signal transmissions from communication and AC failures.
SLIDE 13
All ULC Fire listed Central Stations are
inspected annually. At a high level ULC listed stations are required to have the following: Complete redundancy Signal Receivers Servers Operator Terminals Mantrap 2 hour rated Fire protection Outdoor/indoor cameras Voice recordings Disaster Recovery Data storage Complete Power back up UPS / Generator
SLIDE 14
Canadian Building code has adhere to
ULC S561
Stations must:
Fire Alarms: must complete fire dispatch
within 30 seconds of station receiving the signal.
Notify customer within 5 minutes of
receiving a Trouble signal
Fire Alarms are required to be reset within 8 hours. Fire Trouble/ Supervisor signals must be restored within 12 hours from receipt of
- signal. If a restore is not received from
station another notification will be made. If no reset received by station another notification needs to occur. Important for dealer to train on site staff
- n how to reset panel.
SLIDE 15
Since 97% of the worlds population
has a cellular phone
Of that 97%...98% of these people
never have their phone more than two feet away from them at all times.
Naturally is made sense to create an
app to assist the dealer.
SLIDE 16
SLIDE 17
SLIDE 18
When entering Data into the
Account Search, the system will search
Account Number field Address Field Account Name Field
So, if you put in “main” for example, it would produce all your accounts in a list, that have “main” in the name, like Main District Office, and it would produce all accounts on “Main” Street as
- well. Then you can easily scroll and
pick the one you want to work with.
SLIDE 19
SLIDE 20
SLIDE 21
SLIDE 22
SLIDE 23
SLIDE 24
SLIDE 25
SLIDE 26
SLIDE 27
SLIDE 28
SLIDE 29
SLIDE 30
SLIDE 31
SLIDE 32
SLIDE 33
SLIDE 34
SLIDE 35
SLIDE 36
Questions? Thank you.
Kim Caron Director Business Development Armstrong’s National Alarm Monitoring 1-866-201-0551 kim@armcom.ca www.armcom.ca
SLIDE 37