Community Solar Rate Rider: Schedule No. 500
February 13, 2018
1
Community Solar Rate Rider: Schedule No. 500 February 13, 2018 1 - - PowerPoint PPT Presentation
Community Solar Rate Rider: Schedule No. 500 February 13, 2018 1 Community Solar Agenda Design Principles Program Highlights Pricing Methodology Example Customer Impact Conclusion Next Steps 2 Design Principles
1
2
3
4
– When combined with OPPD’s existing and planned wind resources, the program would allow participating customers the ability to achieve approximately a ‘100% renewable’ portfolio on an annual basis by 2021
annual kWh generation from renewable resources
portfolio
5
6
– Full retail rate: consistent with net metering, but results in significant subsidization by non participants – Embedded cost of generation: simple approach, but gives solar equal capacity credit compared to baseload units – “Value of Solar”: diverse interpretations that lack a uniform calculation methodology
7
8
– Energy
– Accredited Capacity
– D: SPP day ahead hourly market prices from previous year – S: Hourly production shape for community solar – V: Annual levelized value of next marginal generation – C: SPP accredited capacity value
$0.000 $0.005 $0.010 $0.015 $0.020 $0.025 $0.030 0.000 0.100 0.200 0.300 0.400 0.500 0.600 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hourly Market Price kW output Hours of the Day
9 *Average NREL Production shape for OPPD service territory **2016 SPP Day Ahead Annual Hourly Pricing
500 1,000 1,500 2,000 2,500 0% 10% 20% 30% 40% 50% 60% 70% 80% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
System Load in MW Capacity Factor of Solar Hours of the Day
Expected output of 1 kW AC solar system on 2016 Peak Day* System Load in MW on 2016 Peak Day** 10
Solar production during system peak
*NREL Production shape for OPPD service territory on 8-11-16 **2016 OPPD system load on Peak Day 8-11-16
11 100% 100% 100% 20% 15% 0% 20% 40% 60% 80% 100% Coal Gas Nuclear Solar Wind*
Dispatchable Intermittent
* Highest current accreditation value for existing OPPD wind facilities in accordance with standing Southwest Power Pool accreditation policies. Wind & solar accreditation policies require three years of production generation.
– Final cost of community solar project from competing developers, including interconnection
– The market based credit value that will be updated annually – Valuation changes are affected by SPP accreditation policies, energy prices and asset performance
– Customers annual usage – How much of their annual usage the customer wants to
12
– PPA expected to be executed in Q2 of 2018
13
Ranges are representative. In aggregation, the above assumptions would result in a 3% bill increase
14
3% 7% 10% 13% 17% 0% 5% 10% 15% 20% 10% 20% 30% 40% 50%
Expected Percentage Bill Increase Tiers of Program Participation
% Bill Increase Based on % of Energy Offset by The Average Customer*
* Figures are estimates based on representative PPA costs. Actual PPA costs will change outcome of analysis.
– Consistent with Strategic Directives (SD):
– Lower than some other programs – Meets OPPD requirement of a fair, reasonable and non- discriminatory standard
15
16