Construction Engineering & Inspection Services Transit Bus Stop - - PowerPoint PPT Presentation
1 Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT) Presented By: Calvin, Giordano & Associates, Inc. RFP No. V2114585P1 Firm
PresentedBy:Calvin,Giordano&Associates,Inc.
RFPNo.V2114585P1
PresentedBy:Calvin,Giordano&Associates,Inc.
RFPNo.V2114585P1
Florida for 80 years.
350 employees, providing over 25+ Municipal Services.
BrowardCounty FDOT(District1,4,6&7) FDEP SeminoleTribeofFlorida PalmBeachCounty MiamiDadeCounty WestPalmBeach LakeWorth Lantana RivieraBeach DelrayBeach BocaRaton PompanoBeach OaklandPark PembrokePines CoralSprings DaniaBeach Hollywood MiamiGardens Tamarac WestPark Weston NorthLauderdale Lauderhill SunnyIsles Surfside Parkland Weston
PresentedBy:Calvin,Giordano&Associates,Inc.
RFPNo.V2114585P1
Construction Engineering and Inspection professional services (CEI) and technical support services related to Improvements / construction of Countywide Transit Bus Stop Infrastructure. The project is Federal Transit Administration Funded. Also, part of the contract includes:
Compliancewith:
ProjectSchedule(TimeforPerformance): The work to be performed under this scope and underlying Agreement for CEI services shall be completed within 730 calendar days with an optional 365 calendar days from the issuance of the Notice to Proceed.
PresentedBy:Calvin,Giordano&Associates,Inc.
RFPNo.V2114585P1
PresentedBy:Calvin,Giordano&Associates,Inc.
RFPNo.V2114585P1
ADAupgradestosidewalks NewBusShelters SiteFurnishings BikeRacks Signage ElectricalUnderground
Wiring&Components
SolarPowerSupplies Remove/Replace
DamagedConcreteSlabs
RelocationofExisting
Landscaping
RelocationofExisting
Irrigation
PresentedBy:Calvin,Giordano&Associates,Inc.
RFPNo.V2114585P1
ProjectsthatincludedBusShelter/Stopupgrades:
(LAP Funded $ 2,855,802): Improvements include roadway widening, updated bus stops, sidewalk installation, drainage improvements, milling and resurfacing, Bus shelter/Pads, lighting, median installation, signage, landscaping, irrigation and pavement markings.
15801 (LAP Funded $628,755.50):The project scope includes the installation of a sidewalk along the west side of SW 36th Avenue commencing on the south end of Canal “A” north to Palm Aire Drive, a pedestrian flashing beacon crosswalk at the intersection of SW 36th Avenue and Gateway Drive, Bus Pads, storm drainage construction, demolition, utility work, and permanent signage & striping.
improvements included but were not limited to clearing and grubbing, bus stop concrete pad improvements, pedestrian sidewalk improvements, pavement markings and signage, Bus shelter/Pads, site lighting, irrigation, signing and pavement markings, landscaping and other miscellaneous improvements.
Street project included pedestrian and landscape enhancements such as construction of a landscaped median and installation of additional landscaping, tree grates, benches, bike racks, trash receptacles, sidewalk, milling and resurfacing, striping, signing and irrigation system from Sapodilla Avenue to Tamarind Avenue.
PresentedBy:Calvin,Giordano&Associates,Inc.
RFPNo.V2114585P1
PresentedBy:Calvin,Giordano&Associates,Inc.
RFPNo.V2114585P1
the pad thickness and shelter type in advance, check the reinforced mat for the bus pad to verify clearances, verify buy America certifications, ensure materials used are from approved sources including the concrete mixes, & check the base prior to pad placement.
chair maneuvers, and drop off protection.
access, and maintaining bus service during construction.
face meetings, ensure proper access is maintained, respond to complaints within 24 hours to avoid issue escalation.
PresentedBy:Calvin,Giordano&Associates,Inc.
RFPNo.V2114585P1
PresentedBy:Calvin,Giordano&Associates,Inc.
RFPNo.V2114585P1
PresentedBy:Calvin,Giordano&Associates,Inc.
RFPNo.V2114585P1
PresentedBy:Calvin,Giordano&Associates,Inc.
RFPNo.V2114585P1