US Army Corps US Army Corps of Engineers of Engineers Contracting Contracting Vehicles Vehicles Norfolk District Norfolk District Corps of Engineers Corps of Engineers Ms. Debora Gray U.S. Army Corps of Engineers Norfolk District


slide-1
SLIDE 1

US Army Corps US Army Corps

  • f Engineers
  • f Engineers

One Corps Serving the Army and the Nation

Contracting Vehicles Norfolk District Corps of Engineers Contracting Vehicles Norfolk District Corps of Engineers

  • Ms. Debora Gray

U.S. Army Corps of Engineers – Norfolk District Contracting Officer 757-201-7551 Debora.S.Gray@usace.army.mil

slide-2
SLIDE 2

US Army Corps US Army Corps

  • f Engineers
  • f Engineers

One Corps Serving the Army and the Nation

NORFOLK DI STRI CT NORFOLK DI STRI CT NORFOLK DI STRI CT NORFOLK DI STRI CT

  • Center of Standardization (COS)

Program

  • Base Realignment and Closure (BRAC)

Program

slide-3
SLIDE 3

US Army Corps US Army Corps

  • f Engineers
  • f Engineers

One Corps Serving the Army and the Nation

NORFOLK DI STRI CT CoS NORFOLK DI STRI CT CoS FACI LI TY TYPES FACI LI TY TYPES NORFOLK DI STRI CT CoS NORFOLK DI STRI CT CoS FACI LI TY TYPES FACI LI TY TYPES

  • Dining Facilities**

Dining Facilities**

  • General Instruction Building (GIB)**

General Instruction Building (GIB)**

  • Military Entrance Processing

Military Entrance Processing Station (MEPS) Station (MEPS)

  • Army Family Housing

Army Family Housing

  • Classroom XXI

Classroom XXI

  • Troop Issue Support

Troop Issue Support

  • Information Support

Information Support (**Most active) (**Most active)

slide-4
SLIDE 4

US Army Corps US Army Corps

  • f Engineers
  • f Engineers

One Corps Serving the Army and the Nation

White Sands Missile Testing Center Fort Sill Fort Bliss Fort Hood Fort Polk Pine Bluff Ars McAlester AAP Red River AD Lone Star AAP Camp Stanley Storage Actv Louisiana AAP Fort Sam Houston Corpus Christi AD Presidio of Monterey Fort Irwin Yuma Proving Ground Fort Hauchuca Riverbank AAP Sierra Army Depot Hawthorne AD Fort Hunter Liggett (USAR)

Army Installations Army Installations

Natick R & D Ctr Devens RFTA (USAR)

Fort McPherson Fort Gordon Fort Stewart/Hunter AAF Fort Jackson Fort Buchanan Fort Benning

Fort Rucker

Fort Gillem

Mississippi AAP

Fort Bragg MOT Sunny Point

NER SWR

Detroit Ars USAG Selfridge Lima Army Tank Plt Fort McCoy (USAR) Fort Leonard Wood

Fort Riley

Fort Leavenworth Iowa AAP Kansas AAP Lake City AAP Dugway Proving Ground Pueblo Depot

Fort Carson

Tooele AD Deseret Chem Depot

Fort Lewis

Yakima Training Center Umatilla Chem Depot Rock Island Arsenal USAG Miami Moffett Field RFTA (USAR)

Fort Drum

Fort Monmouth Picatinny Arsenal Watervliet Ars

  • Ft. Hamilton

Fort Dix (USAR) West Point Fort Belvoir Aberdeen Proving Ground Fort Story Fort Lee Fort Eustis Fort Monroe

  • Ft. AP Hill

Radford AAP Letterkenny AD Carlisle Barracks Fort McNair

  • Ft. Meade

Fort Myer Walter Reed Ft Detrick Tobyhanna Army Depot Adelphi Lab Ctr Scranton AAP

SER NWR

Parks RTFA Redstone Arsenal Anniston AD

Holston AAP

Fort Campbell Fort Knox

Milan AAP

Blue Grass AD

slide-5
SLIDE 5

US Army Corps US Army Corps

  • f Engineers
  • f Engineers

One Corps Serving the Army and the Nation

Dining Facility Dining Facility Acquisition Strategy Acquisition Strategy Dining Facility Dining Facility Acquisition Strategy Acquisition Strategy

Northeast Region Northeast Region

  • Firm Fixed Price (“C”)

Firm Fixed Price (“C”) – – (FY08/ Fort Drum, NY) (FY08/ Fort Drum, NY) – – $7.4M $7.4M -Service Disable Veteran Set Aside Service Disable Veteran Set Aside

slide-6
SLIDE 6

US Army Corps US Army Corps

  • f Engineers
  • f Engineers

One Corps Serving the Army and the Nation

Dining Facility Dining Facility Acquisition Strategy Acquisition Strategy Dining Facility Dining Facility Acquisition Strategy Acquisition Strategy

Northwest Region Northwest Region

SATOC SATOC – – Base (FY08) + 4 Option Periods Base (FY08) + 4 Option Periods -

  • $40M

$40M -

  • SDV Set Aside (Primarily at Fort

SDV Set Aside (Primarily at Fort Lewis) Lewis)

  • MATOC

MATOC – – Base (FY08) + 4 Option Periods Base (FY08) + 4 Option Periods

  • $75M

$75M – – SDV Set Aside (Primarily at Fort SDV Set Aside (Primarily at Fort Leonardwood, Riley and Carson) Leonardwood, Riley and Carson)

slide-7
SLIDE 7

US Army Corps US Army Corps

  • f Engineers
  • f Engineers

One Corps Serving the Army and the Nation

Dining Facility Dining Facility Acquisition Strategy Acquisition Strategy Dining Facility Dining Facility Acquisition Strategy Acquisition Strategy

Southeast Region Southeast Region

  • Firm Fixed Price Contracts

Firm Fixed Price Contracts – – Ft Bragg; Ft Stewart and Ft Bragg; Ft Stewart and Ft Campbell Ft Campbell

slide-8
SLIDE 8

US Army Corps US Army Corps

  • f Engineers
  • f Engineers

One Corps Serving the Army and the Nation

Dining Facility Dining Facility Acquisition Strategy Acquisition Strategy Dining Facility Dining Facility Acquisition Strategy Acquisition Strategy

Southwest Region Southwest Region

  • SATOC

SATOC – – Base (FY 08) + 2 option periods Base (FY 08) + 2 option periods -

  • $40M

$40M – Service Disable Set Service Disable Set-

  • Aside (Primarily Fort Sill)

Aside (Primarily Fort Sill)

  • MATOC

MATOC – – Base (FY 08) + 4 option periods Base (FY 08) + 4 option periods -

  • $75M

$75M – Hubzone (Primarily Fort Hood, Huachuca, White Hubzone (Primarily Fort Hood, Huachuca, White Sands, Irwin and Bliss) Sands, Irwin and Bliss)

  • Firm Fixed Price (“C”)

Firm Fixed Price (“C”) – – (FY08/ Fort Sam Houston, (FY08/ Fort Sam Houston, TX) TX) – – $37M $37M -

  • Unrestricted

Unrestricted

slide-9
SLIDE 9

US Army Corps US Army Corps

  • f Engineers
  • f Engineers

One Corps Serving the Army and the Nation

General I nstruction Building General I nstruction Building (GI B) (GI B) Acquisition Strategy Acquisition Strategy General I nstruction Building General I nstruction Building (GI B) (GI B) Acquisition Strategy Acquisition Strategy

Northeast Region Northeast Region

Firm Fixed Price (“C”) Firm Fixed Price (“C”) – – (FY11/ Fort Meade) (FY11/ Fort Meade) – – $10M $10M -

  • SDV

SDV

slide-10
SLIDE 10

US Army Corps US Army Corps

  • f Engineers
  • f Engineers

One Corps Serving the Army and the Nation

General I nstruction Building General I nstruction Building (GI B) (GI B) Acquisition Strategy Acquisition Strategy General I nstruction Building General I nstruction Building (GI B) (GI B) Acquisition Strategy Acquisition Strategy

Northwest Region Northwest Region

  • SATOC (FY09)

SATOC (FY09) – – Base Plus 4 Option Periods Base Plus 4 Option Periods -

  • $30M (Primarily Ft Leonardwood)

$30M (Primarily Ft Leonardwood) – – Hubzone Hubzone

  • Firm Fixed Price (“C”)

Firm Fixed Price (“C”) – – (FY10/ Fort Lewis, WA) (FY10/ Fort Lewis, WA) – – $6M $6M -

  • SDV Sole Source

SDV Sole Source

  • Firm Fixed Price (“C”)

Firm Fixed Price (“C”) – – FY10/ Fort Carson) FY10/ Fort Carson) -

  • $19M

$19M – – Hubzone Hubzone

slide-11
SLIDE 11

US Army Corps US Army Corps

  • f Engineers
  • f Engineers

One Corps Serving the Army and the Nation

General I nstruction Building General I nstruction Building (GI B) (GI B) Acquisition Strategy Acquisition Strategy General I nstruction Building General I nstruction Building (GI B) (GI B) Acquisition Strategy Acquisition Strategy

Southeast Region Southeast Region

  • MATOC

MATOC – – Base (FY08) + 4 Option periods Base (FY08) + 4 Option periods

  • $120M

$120M – – Unrestricted (primarily Fort Unrestricted (primarily Fort Benning, Gordon) Benning, Gordon)

slide-12
SLIDE 12

US Army Corps US Army Corps

  • f Engineers
  • f Engineers

One Corps Serving the Army and the Nation

General I nstruction Building General I nstruction Building (GI B) (GI B) Acquisition Strategy Acquisition Strategy General I nstruction Building General I nstruction Building (GI B) (GI B) Acquisition Strategy Acquisition Strategy

Southwest Region Southwest Region

  • MATOC

MATOC – – Base (FY08) + 4 Option periods Base (FY08) + 4 Option periods – – $75M $75M -

  • Hubzone (Primarily at Presidio of

Hubzone (Primarily at Presidio of Monterey, Fort Huachuca) Monterey, Fort Huachuca)

  • MATOC

MATOC – – Base (FY09) + 4 Option periods Base (FY09) + 4 Option periods – – $45M $45M -

  • Hubzone (Primarily at Fort Sam

Hubzone (Primarily at Fort Sam Houston, Bliss and Sill) Houston, Bliss and Sill)

slide-13
SLIDE 13

US Army Corps US Army Corps

  • f Engineers
  • f Engineers

One Corps Serving the Army and the Nation

Military Entrance Processing Military Entrance Processing Station (MEPS) Station (MEPS) Acquisition Strategy Acquisition Strategy Military Entrance Processing Military Entrance Processing Station (MEPS) Station (MEPS) Acquisition Strategy Acquisition Strategy

Northwest Region Northwest Region

  • Firm Fixed Price (“C”)

Firm Fixed Price (“C”) -

  • (FY08/ Selfridge, MI)

(FY08/ Selfridge, MI) – – $6,720,000.00 $6,720,000.00 – – 8A 8A No MEPS Facility located in any other region. No MEPS Facility located in any other region.

slide-14
SLIDE 14

US Army Corps US Army Corps

  • f Engineers
  • f Engineers

One Corps Serving the Army and the Nation

Army Family Housing Army Family Housing Acquisition Strategy Acquisition Strategy Army Family Housing Army Family Housing Acquisition Strategy Acquisition Strategy

Southeast Region Southeast Region

  • Firm Fixed Price (“C”)

Firm Fixed Price (“C”) – – (FY08/ Anniston, AL) (FY08/ Anniston, AL) – – $252,000.00 $252,000.00 – – Sole Source 8A Sole Source 8A

  • Firm Fixed Price (“C”)

Firm Fixed Price (“C”) -

  • FY10/ Ft Bragg)

FY10/ Ft Bragg) -

  • $5.4M

$5.4M – – 8A 8A

slide-15
SLIDE 15

US Army Corps US Army Corps

  • f Engineers
  • f Engineers

One Corps Serving the Army and the Nation

Army Family Housing Army Family Housing Acquisition Strategy Acquisition Strategy Army Family Housing Army Family Housing Acquisition Strategy Acquisition Strategy

Northeast Region Firm Fixed Price (“C”) – FY11/Ft Eustis - $5M – 8A

slide-16
SLIDE 16

US Army Corps US Army Corps

  • f Engineers
  • f Engineers

One Corps Serving the Army and the Nation

Norfolk District CoS Norfolk District CoS Total SB Set Total SB Set-

  • Aside

Aside Norfolk District CoS Norfolk District CoS Total SB Set Total SB Set-

  • Aside

Aside

Type of Contract Approx #

  • f Actions

Percentage Unrestricted 2 25% 8A 6 6% HUB-Zone 7 37% Service–Disabled Vet 7 29% Total 100%

slide-17
SLIDE 17

US Army Corps US Army Corps

  • f Engineers
  • f Engineers

One Corps Serving the Army and the Nation

BRAC BRAC BRAC BRAC

Current Contracting Vehicles MATOC for Hubzone Set-Aside - $50M for Base + Four Option Periods MATOC for Unrestricted - $200M for Base + Four Option Periods

slide-18
SLIDE 18

US Army Corps US Army Corps

  • f Engineers
  • f Engineers

One Corps Serving the Army and the Nation

BRAC BRAC BRAC BRAC

FUTURE CONTRACTING VEHICLES

  • MATOC for Service Disable Veterans (SDV)

for $50M for a Base Period plus Four Option Periods = Anticipated First Quarter FY08

  • MATOC for 8A for $50M for a Base Period

plus Four Option Periods = Anticipated First/Second Quarter FY08

slide-19