COUNTRY PRESENTATION (BHUTAN) (Status of ITS Developments and Related Challenges and Issues) Expert Group Meeting and Regional Meeting on Intelligent Transport Systems (ITS) Songdo, Republic of Korea 2-4 April 2019 Sithar Dorji Dy. Chief


slide-1
SLIDE 1

Sithar Dorji

  • Dy. Chief Planning Officer

Ministry of Information and Communications Royal Government of Bhutan

(Status of ITS Developments and Related Challenges and Issues) COUNTRY PRESENTATION (BHUTAN)

Expert Group Meeting and Regional Meeting on Intelligent Transport Systems (ITS) Songdo, Republic of Korea 2-4 April 2019

slide-2
SLIDE 2

Presentation Outline

  • Brief Country Background
  • Transport Scenario in Bhutan
  • Status of ITS Developments in Bhutan
  • Challenges and Issues
slide-3
SLIDE 3

Brief Country Background

  • Area: 38,394 sq kms
  • Population: 727,145
  • Currency: Ngultrum (Nu.)
  • Language: Dzongkha
  • Seasons: Four seasons
  • GDP at Current Price: Nu.164,6267.92 m
  • GDP Real Growth: 4.63%
  • Transport System: Land and Air Transport

Source: Bhutan at a Glance (2018), NSB

slide-4
SLIDE 4

Transport Scenario in Bhutan

Source: Annual Info-Comm and Transport Statistical Bulletin (10th edition), 2019

slide-5
SLIDE 5

Transport Scenario in Bhutan

Source: Annual Info-Comm and Transport Statistical Bulletin (10th edition), 2019

slide-6
SLIDE 6

Transport Sector in Bhutan

City bus services - Operated by Bhutan Postal Corporation

  • Ltd. and three other private operators.

The Urban Transport

Taxi - 64.73% of total taxi in Thimphu Personalized cars

slide-7
SLIDE 7

Status of ITS Developments in Bhutan

The main objectives of ITS in Bhutan (among others)

  • Reduce congestion and travel time
  • Enhance mobility
  • Improve accessibility
  • Reduce environmental impact
  • Increase efficiency of the transport

system

  • Enhance road safety
  • Effective Enforcement of Traffic

Regulation

Source: ITS Feasibility Study and Preparation of a Comprehensive ITS Action Plan For Thimphu City, 2015

slide-8
SLIDE 8

Status of ITS Developments in Bhutan

Feasibility study and Comprehensive ITS Action Plan for Thimphu City Developed in 2015

slide-9
SLIDE 9

Status of ITS Developments in Bhutan

Pilot Smart Card: Pilot smart card system on one Bus on Dechencholing route in 2016.

slide-10
SLIDE 10

Status of ITS Developments in Bhutan

CCTV inside city buses:

  • A pilot project
  • The main purpose was to

strengthen safety inside the bus.

slide-11
SLIDE 11

Status of ITS Developments in Bhutan

Pilot Bus Information System (BIS):

  • 10 buses are equipped with On-

Board Bus Equipment (OBE)

  • 2 Bus Information Terminal (BIT)

installed on one of the routes

slide-12
SLIDE 12

Status of ITS Developments in Bhutan

Online bus and taxi booking systems/Apps

Druk Ride- Online Bus ticket booking and taxi booking YANA taxi app- availing taxi services online. Oie Taxi App- availing taxi services online Mobile App - for calculating taxi fares based on routes selected.

slide-13
SLIDE 13

Status of ITS Developments in Bhutan

Safe City initiatives (RBP):

  • Installation of CCTV Cameras in

major cities

  • To regulate systematic traffic

management and address the growing traffic problems in the city

slide-14
SLIDE 14

Challenges and Issues

  • Pilot smart card: Piloting on only one and difficult to implement full-

fledged cashless system. Nu. 7.5 m secured from RGoB for upscaling the initiatives can only cover 50% the cost for implementing in the existing fleets.

  • Installed CCTV inside Buses: High data consumption as it uses 4G

(SIM Card data based transmission) and live control is very expensive. Not very effective as there is no central control unit set up.

  • Bus Information System (BIS)- The problem faced by operations

while allocating the bus on route due to the limited number buses with OBE.

  • Lack of funding to upscale the pilot ITS initiatives
slide-15
SLIDE 15