() DEMCO PUBLIC COMPANY LIMITED 10 SEPTEMBER 2018 1. Factory & Sale Steel structure for transmission line and telecommunication tower 2. SERVICES (as turnkey


slide-1
SLIDE 1

บริษัท เด็มโก้ จ ำกัด (มหำชน)

DEMCO PUBLIC COMPANY LIMITED 10 SEPTEMBER 2018

slide-2
SLIDE 2
  • 1. Factory & Sale

– Steel structure for transmission line and telecommunication tower

  • 2. SERVICES (as turnkey contractor)

– Electrical system – Mechanical system – Renewable Power Plant (Wind farm, Solar farm, Waste to energy)

  • 3. Investment

– Power Plant : wind farm & Solar farm & Waste to energy – Public Utility 2

slide-3
SLIDE 3

 Telecommunication Tower

3

 High Voltage Transmission Line Annual capacity 16000 ton per year

slide-4
SLIDE 4

4

ลักษณะการประกอบธุรกิจ - งานบริการ

  • ระบบงานวิศวกรรมไฟฟ

้ าครบวงจร

Hydro/Power Plant

4

 Electrical System

500 kV - 230 kV Substation 230 kV - 115 kV Substation

115 kV - 22 kV Substation

slide-5
SLIDE 5

5

1. High Voltage Transmission Line System Construction :

To transmit electrical power from electrical generators to 69 kV – 500 kV substations  Hot dip galvanized steel tower for transmission line manufactured by DEMCO PLC as well.

slide-6
SLIDE 6

6

  • 2. High Voltage Substation Construction :

To control, monitor, and step up/down 69 kV – 500 kV power system transmitted from electrical generators through high voltage transmission line  Air Insulated or Conventional Type (Out door)  SF6 Gas Insulated Type (In door)

slide-7
SLIDE 7

7

  • 3. High Voltage Distribution Line System Construction and Underground Cable

System Construction :

 HV Distribution system – Concrete poles with accessories construction & stringing conductors or cables to 22kV or 33 kV electrical equipment  HV Underground Cable System – Conduit work and 22 kV – 115 kV underground cable extrusion

slide-8
SLIDE 8

8

Design, procure, construct, install, and maintain public utility system of electrical system, air conditioning & ventilating system, sanitary system, and high pressure piping system for gas or steam

slide-9
SLIDE 9

9

Renewable Energy :

 Design , procure, construct, and install equipment for renewable power plant of Biomass, Wind farm and Solar energy

Past Experience :

– Constructed 453 mw wind farm as balance of plant contractor , contracts amount ฿ 8,046 million – Constructed 321 mw solar farms , contracts amount ฿ 8,677 million

slide-10
SLIDE 10

10 Wind farm : 57.9 mw.  15% in 180 mw. Wind farm (operated 2012 – 2013) = 27.0 mw.  14% in 60 mw. Wind farm (operated 2016) = 8.4 mw.  3.9% in 576 mw. Wind farm (126 mw. operated) = 22.5 mw. Solar farm : 3.0 mw.  100% in 1 mw. Solar rooftop (COD operated 2014) = 1.0 mw.  45.7% in 3 mw. Solar farm (COD operated 2014) = 1.3 mw.  49-51% in 1.4 mw. Solar rooftop (COD operated 2015) = 0.7 mw. Water supply system:  90% in water supply system concession (operated 2017)

slide-11
SLIDE 11

11 Financial highlight :  Revenue increased 24% Q2’17 o Q2’18 ( 947 MB ⇨ 1,175 MB )  Revenue increased 12% 1H’17 o 1H’18 ( 2,184 MB ⇨ 2,459 MB )  Gross profit margin increased Q2’17 o Q2’18 ( 10.06% ⇨ 11.66% )  Gross profit margin increased 1H’17 o 1H’18 ( 11.00% ⇨ 11.88% )  Gross profit increased 45% Q2’17 o Q2’18 ( 94 MB ⇨ 136 MB )  Gross profit increased 22% 1H’17 o 1H’18 ( 237 MB ⇨ 289 MB )  Net profit increased 118% Q2’17 o Q2’18 ( 22 MB ⇨ 49 MB )  Net profit increased 65% 1H’17 o 1H’18 ( 76 MB ⇨ 126 MB )  Net profit margin increased Q2’17 o Q2’18 ( 2.39% ⇨ 4.20% )  Net profit margin increased 1H’17 o 1H’18 ( 3.48% ⇨ 5.13% )

slide-12
SLIDE 12

Revenues by Categories : ฿ million ,% Statement of Comprehensive Income - Revenues Structure

12

500 1,000 1,500 2,000 Q2'16 Q2'17 Q2'18

Other Sales Service total

1,175 947 1,703 24%

  • 44%

95% 4% 1% 88% 11% 1% 1% 18% 81%

500 1,000 1,500 2,000 2,500 3,000 3,500 1H'16 1H'17 1H'18

Other Sales Service total

Total revenue of Q2’18 and 1H’18 increased 24% and 12% compared to the same period of Y’17 due to the increasing of service revenue.

2,459 2,184 3,125 12%

  • 30%

95% 4% 1% 81% 18% 1% 1% 21% 78%

slide-13
SLIDE 13

100 200 300

Q2'16 Q2'17 Q2'18 Electrical equipments Steel Structure total

Statement of Comprehensive Income - Revenues Structure Revenues from Sale : ฿ million ,%

63 100 209

13

107% 75% 25% 9% 91% 56% 44% 58%

Revenues from sale of Q2’18 and 1H’18 increased 107% and 31% compared to the same period of Y’17 due to the growth from both trading Electrical equipments business and steel structure business.

100 200 300 400 500 600

1H'16 1H'17 1H'18

Electrical equipments Steel Structure total

131 389 512 31% 195% 84% 16% 47% 53% 45% 55%

slide-14
SLIDE 14

500 1,000 1,500 2,000

Q2'16 Q2'17 Q2'18 Other Electrical work Renewable Total

Revenues from services of Q2’18 and 1H’18 increased 15% and 8% compared to the same period of Y’17. The major increasing is from the Electrical work.

Revenues from Services : ฿ million ,% Statement of Comprehensive Income - Revenues Structure

14

1,624 833 960 15%

  • 48%

43%48% 9% 13% 3% 51% 36% 93% 4%

500 1,000 1,500 2,000 2,500 3,000 3,500

1H'16 1H'17 1H'18 Other Electrical work Renewable Total

2,973 1,770 1,922 8%

  • 40%

42% 52% 6% 10% 4% 58%32% 92% 4%

slide-15
SLIDE 15

For Q2’18 and 1H’18 , the percentage of works from Government Sector increased due to the increasing in EGAT’S

  • investment. For private sector, it was decreased due to decreasing in renewable energy projects. The investment in renewable

energy changing from solar farm & wind farm to biomass power plant.

500 1,000 1,500 2,000

Q2'16 Q2'17 Q2'18 Government Private Total

Revenues by Customers : ฿ million ,%

960 833 1,624

Statement of Comprehensive Income - Revenues Structure

15%

15

  • 48%

60% 40% 61% 39% 53% 47%

500 1,000 1,500 2,000 2,500 3,000 3,500

1H'16 1H'17 1H'18 Government Private Total

1,922 1,770 2,973 64% 36% 61% 39% 52% 48%

  • 40%

8%

slide-16
SLIDE 16

50 100 150 Q2'16 Q2'17 Q2'18 Gross Profit - sales Gross profit - service Total

Gross Profit : ฿ million ,% Statement of Comprehensive Income Earning from operation

Gross profit of Q2’18 and 1H’18 increased 45% and 22% compared to the same period of Y’17 due to the change in service revenue, major portion, from large renewable power plant projects to the construction of substations and transmission line which gained better margin.

16

102 136

  • 8%

45% 94 95% 5% 81% 19% 91% 9%

100 200 300

1H'16 1H'17 1H'18

Gross Profit - sales Gross profit - service Total

189 289 25% 22% 237 91% 9% 74% 26% 88% 12%

slide-17
SLIDE 17

Statement of Comprehensive Income Earning from operation

11.66% 10.06% 6.05%

0% 5% 10% 15%

Q2'16 Q2'17 Q2'18

Gross profit margin

Average Gross Profit margin : %

17

Average gross profit margin of Q2’18 and 1H’18 increased when compared to the same period of Y’17 increased due to the increasing of construction projects that caused higher gross profit margin.

11.88% 11.00% 6.12% 0% 5% 10% 15%

1H'16 1H'17 1H'18

Gross profit margin

slide-18
SLIDE 18

49% 44%

  • 483%

583% 51% 56%

  • 30
  • 20
  • 10

10 20 30 40 50

Q2'16 Q2'17 Q2'18

Profit exclude share profit (loss) associates Share profit(loss) associates

Net Profit : ฿ million ,% Statement of Comprehensive Income Earning from operation

18

4.61 49.42 22.61

Net profit of Q2’18 and 1H’18 increased when compared to the same period of Y’17 due to the increasing of gross margin and share profit from associate.

52% 15%

  • 134%

34% 48% 85%

  • 300
  • 200
  • 100

100 200

1H'16 1H'17 1H'18

Profit exclude share profit (loss) associates Share profit(loss) associates

  • 216

126 76

slide-19
SLIDE 19

Statement of Comprehensive Income Earning from operation

2.70% 2.39% 4.20% 0% 2% 4% 6% Q2'16 Q2'17 Q2'18 Net profit margin

Net Profit margin : %

19

Net margin of Q2’18 and 1H’18 showed profit 4.20% and 5.13% due to the increasing in gross profit margin and share profit from associate.

  • 6.92%

3.48% 5.13%

  • 8%
  • 6%
  • 4%
  • 2%

0% 2% 4% 6% 1H'16 1H'17 1H'18

Net profit margin

slide-20
SLIDE 20

Statement of Financial Position

20

3,606 3,941 3,879 4,127 3,176 3,155 2016 2017 2018

Current assets Non-current assets

7,733 7,117 7,034 ASSET

KEY RATIO Debt to Equity Interest Bearing Debt to Equity ROE ROA 2016 1.64 2016 0.91 2016

  • 5.33

2016

  • 2.13

2017 1.33 2017 0.77 2017 2.10 2017 0.89 2018 1.23 2018 0.64 2018 F 7.98 2018 F 3.58

LIABILITIES & EQUITY

2,924 3,057 3,160 342 503 475 4,467 3,557 3,399 2016 2017 2018

Current liabilites Non-Current liabilites Shareholders'equity

7,034 7,117 7,733 53% 47% 45% 55% 45% 55% 58% 38% 50% 43% 48% 45% 4% 7% 7%

slide-21
SLIDE 21

Projects Backlog(Separate financial statements)

  • Until 6 September 2018 of amount 3,131.51MB

21

REMARK : This report has been prepared follows the regulation of SEC

Project Type Month 1-7 2018 Project value Amount Project value (MTHB) (Project) (MTHB)

Electrical Engineering Work

2,065.39 59 2,730.52

M&E System

  • Signaling work

73.26 3 226.36

Steel structure work

  • Hardware sale

307.03

  • Subtotal

2,445.68 62 2,956.88

Renewable Energy

85.19 3 142.63

Subtotal

85.19 3 142.63

Contract being signed

  • 1

32.00

Grand total

2,530.87 66 3,131.51

BACKLOG PROJECT Ongoing Projects

slide-22
SLIDE 22
  • 1. Renewable and Alternative Energies Development Plan during the year 2016 -

2036 – Private PPA

  • 2. EGAT's Investment Budget during the year 2015 - 2022 MTHB 123,200

2.1 Constructing new Transmission Lines, Substations, Switching Stations MTHB 60,000. 2.2 Renovation and Improvement existing Transmission Lines in Western and Southern region MTHB 63,200.

3. MEA's Investment Budget during the year 2016 - 2026 MTHB 48,717

  • Constructing Underground Cable System in Metropolitan City.
  • 4. PEA’s Investment Budget during the year 2016 - 2021 MTHB 62,678
  • Constructing Transmission and Distribution Line system as development project

stage 1.

  • 5. PEA's Investment Budget during the year 2017 - 2020 MTHB 11,000
  • Constructing Underground Cable System in Provincial Countries

22

slide-23
SLIDE 23

Wind turbine foundation remedy budget

Estimated Estimated Estimate Estimated Estimate Estimated Aggregate Estimated total total and cost for total and cost for total actual cost Improvement improvement improvement accounting improvement accounting improvement Ended at cost (For cost cost recorded cost recorded cost remaining Works) year 2015 year 2016 in year 2017 (until 2017) in 1H'18 (until Q2'18) (until Q2'18) At Jun 30,2018 Improvement cost 410.51 197.92 36.92 645.35

  • 645.35

520.36 124.99 Re-design cost,advisor cost, insurance,etc 93.72

  • 93.72
  • 93.72

73.55 20.17 Sub-total cost 504.23 197.92 36.92 739.07

  • 739.07

593.91 145.16 Compensation for Loss of production cost* 398.74 297.83 59.75 756.32 16.38 772.70 772.70

  • Total cost

902.97 495.75 96.67 1,495.39 16.38 1,511.77 1,366.61 145.16 Deduct owner's compensation (30.00)

  • (30.00)
  • (30.00)

(30.00)

  • Net cost

872.97 495.75 96.67 1,465.39 16.38 1,481.77 1,336.61 145.16 Description