DESIGN SPARK MECHANICAL Martin Keenan RUNNING ORDER Group and - - PowerPoint PPT Presentation

▶
design spark mechanical
SMART_READER_LITE
LIVE PREVIEW

DESIGN SPARK MECHANICAL Martin Keenan RUNNING ORDER Group and - - PowerPoint PPT Presentation

DESIGN SPARK MECHANICAL Martin Keenan RUNNING ORDER Group and Applying to Introduction to Demo customer our customers DesignSpark Q&A overview Mechanical RUNNING ORDER Group and Applying to Introduction to Demo customer our


slide-1
SLIDE 1

DESIGNSPARK MECHANICAL

Martin Keenan

slide-2
SLIDE 2

RUNNING ORDER

Group and customer

  • verview

Introduction to DesignSpark Mechanical Applying to

  • ur customers

Demo Q&A

slide-3
SLIDE 3

RUNNING ORDER

Group and customer

  • verview

Introduction to DesignSpark Mechanical Applying to

  • ur customers

Demo Q&A

slide-4
SLIDE 4

GROUP OVERVIEW

ELECTROCOMPONENTS PLC ALLIED ELECTRONICS RS COMPONENTS DESIGNSPARK

  • Community of >250k engineers
  • Engineering resources & tools
  • Technical Support Forums

DESIGNSPARKPCB MODELSOURCE

  • Free, professional-standard PCB

design tool

  • Schematic capture, PCB layout &

Autorouter

  • 180,000 users globally
  • Library of >35,000 3D models in

24 formats

  • 80,000 PCB schematics &

footprints in 21 formats

  • £1.3B Revenue
  • Over 1M Customers
  • Operations in 32 countries

DESIGNSHARE

  • Launched in June 2013
  • Library of open source reference

designs & projects

  • Founded in 1928
  • Coverage across
  • N. America
  • >300 world class suppliers
  • Founded in 1937
  • 2500 suppliers
  • Coverage across

EMEA & APAC

slide-5
SLIDE 5

ELECTRONIC DESIGN ENGINEERS MACHINE DESIGNERS

  • PCB and mechanical design disciplines
  • Responsible for electronic product design
  • Driven by advancements in technology
  • Electrical & mechanical design disciplines
  • Responsible for automation & control design
  • Bespoke industrial machine development

TWO DISCIPLINES UNITED BY COMMON CHALLENGES

OUR ENGINEERING CUSTOMERS

slide-6
SLIDE 6

FEEDBACK FROM ENGINEERS

CUSTOMER SURVEY CONDUCTED BY RSM 2012

slide-7
SLIDE 7

A TRACK RECORD OF SUPPORTING ENGINEERS

1941 2008 2010 1974 1994 1998 2011 2012

  • We have been helping engineers for over 75

years, saving time & inspiring innovation

2013 2008 2008 2010 1974 1974 1994 1994 1998 1998 2012 2012 2012 2013 2013 2013

slide-8
SLIDE 8

THE APPETITE FOR 3D DESIGN

  • 3D model programme launched in 2010
  • >35,000 models in 24 formats
  • Over 500,000 downloads

FEEDBACK RECEIVED…

Each model download saves the engineer between 2 hours and 2 days of manual creation But… Only 5% of the world‟s engineers have access to powerful 3D modelling tools Engineers designing in 3D enjoy huge advantages over those still using traditional 2D methods

slide-9
SLIDE 9
  • A 3D design tool to address the needs of the non-CAD specialist
  • Complement the existing feature-based CAD software by decreasing time

to make changes

  • Highly intuitive with low learning curve
  • Free-of-charge to remove all financial barriers

TOGETHER WITH SPACECLAIM WE HAVE CREATED A SOLUTION FOR THE ENGINEERING COMMUNITY

A NEW TOOL IS NEEDED TO HELP ENGINEERS

slide-10
SLIDE 10

RUNNING ORDER

Group and customer

  • verview

Introduction to DesignSpark Mechanical Applying to

  • ur customers

Demo Q&A

slide-11
SLIDE 11

4 simple gestures putting geometry creation into the hands of the non-CAD specialist

INTRODUCING DESIGNSPARK MECHANICAL

slide-12
SLIDE 12

Based on intuitive „Direct Modelling‟ techniques

INTRODUCING DESIGNSPARK MECHANICAL

slide-13
SLIDE 13

Fear of mistakes is paralysing, don‟t punish invention

INTRODUCING DESIGNSPARK MECHANICAL

slide-14
SLIDE 14

Import IDF files from PCB design tools

INTRODUCING DESIGNSPARK MECHANICAL

ORCAD ALTIUM PADS DESIGNSPARKPCB EAGLE…

slide-15
SLIDE 15

Create rapid prototypes with a 3D printer

INTRODUCING DESIGNSPARK MECHANICAL

*.STL FILE

slide-16
SLIDE 16

We‟ve worked with Traceparts to make 100m+ industrial components available from day one

INTRODUCING DESIGNSPARK MECHANICAL

slide-17
SLIDE 17

Bill-of-Materials display Connected with the RS & Allied quote system to keep track of project costs. Quick ordering capability

INTRODUCING DESIGNSPARK MECHANICAL

slide-18
SLIDE 18

INTRODUCING DESIGNSPARK MECHANICAL

slide-19
SLIDE 19

RUNNING ORDER

Group and customer

  • verview

Introduction to DesignSpark Mechanical Applying to

  • ur customers

Demo Q&A

slide-20
SLIDE 20

DESIGN FLOW BOTTLENECKS

BRIEF BID PROPOSAL PROTOTYPE CUSTOMER REVIEW PRODUCTION FINAL DESIGN CONCEPT ELECTRONIC DESIGN MECHANICAL DESIGN PROTOTYPE PRODUCTION FINAL DESIGN ELECTRONIC DESIGN ENGINEERS MACHINE DESIGNERS

slide-21
SLIDE 21

ELECTRONIC ENGINEERS TELL US… “ECAD & MCAD WORLDS ARE MERGING” WHAT DOES THAT REALLY MEAN??!! An RS Customer told us… 15 YEARS AGO The thermostat here was designed much like every

  • ther electronic product at the time

1ST CIRCUIT DESIGN 2ND CASE DESIGN

Electronic engineer passes circuit design to mechanical engineer to build case, buttons, dials around

WHY IS 3D DESIGN IMPORTANT

slide-22
SLIDE 22

TODAY The thermostat here was designed much like every

  • ther electronic product today

CIRCUIT DESIGN CASE DESIGN

Product design is far more aesthetically focussed meaning circuit and mechanical design are done in parallel

FINAL PRODUCT

ELECTRONIC ENGINEERS TELL US… “ECAD & MCAD WORLDS ARE MERGING” WHAT DOES THAT REALLY MEAN??!! An RS Customer told us…

WHY IS 3D DESIGN IMPORTANT

slide-23
SLIDE 23

Many PCB design tools have integrated 3D viewers

Example 3D viewers in Altium Designer & DesignSpark PCB

Many PCB design tools have IDF

  • utputs for use in

MCAD tools

Example of an IDF import into SolidWorks

HOW IS THE MARKET ADAPTING?

BUT THESE DO NOT FULLY ADDRESS THE CHALLENGES

slide-24
SLIDE 24

Mechanical design stage increasingly coupled with PCB design It typically takes a week for the CAD guys to make even small changes I want to be able to model as quickly as my brain’s creating There’s a real need for some common ground between us and the mechanical engineers

Customer quotes

FEEDBACK FROM ELECTRONIC ENGINEERS

slide-25
SLIDE 25

MACHINE DESIGNER CHALLENGES

BRIEF BID PROPOSAL PROTOTYPE CUSTOMER REVIEW PRODUCTION FINAL DESIGN

Often completed on paper or

  • ut-of-date, not suitable 2D

software* Changes to design is largest source of bottlenecks*

* CUSTOMER SURVEY CONDUCTED BY RSM 2012

slide-26
SLIDE 26

We tend not to deviate from previous designs, we don’t have the time to create concepts from scratch We’re losing business to companies able to invest in modern mechanical design software Our ability to innovate is limited due to the lack of time we have available The mechanical design process is a major bottleneck and can add weeks to a build

FEEDBACK FROM MACHINE DESIGNERS

slide-27
SLIDE 27

THE OUTPUT IS A HIGHLY ACCURATE SET OF BLUEPRINTS ESSENTIAL FOR THE MANUFACTURING PROCESS

LIMITATIONS OF FEATURE-BASED CAD

Feature-based CAD constructs designs from smaller, interdependent parts Parent-Child relationships created to enable multiple engineers working on same design

slide-28
SLIDE 28

However the limitation is when an engineer needs to make changes A change to one feature leads to a change to the connecting features and there is soon a ripple effect across the whole design FEATURE-BASED CAD IS NOT SUITABLE FOR EVERY TASK

LIMITATIONS OF FEATURE-BASED CAD

slide-29
SLIDE 29

RUNNING ORDER

Group and customer

  • verview

Introduction to DesignSpark Mechanical Applying to

  • ur customers

Demo Q&A

slide-30
SLIDE 30
  • Direct manipulation of models
  • IDF import from PCB design tools
  • STEP, STL, OBJ, SKP (Sketchup) import
  • AutoCAD (DXF), OBJ, STL, 3D pdf, XAML, jpg, png outputs
  • 3D printer compatible
  • Access to 100M+ 3D models from Traceparts

DESIGNSPARK MECHANICAL…

SUMMARY

slide-31
SLIDE 31
  • Extensive support and video tutorial documentation
  • Technical support forums at Designspark.com
  • Free to access for all engineers
  • Share & collaborate on projects with Designshare

DESIGNSPARK MECHANICAL…

SUMMARY

slide-32
SLIDE 32

Questions

?

QUESTIONS