EPA CLEANUP GRANT PROGRESS MEETING Sanitary Laundry and McClung - - PowerPoint PPT Presentation

epa cleanup grant progress meeting sanitary laundry and
SMART_READER_LITE
LIVE PREVIEW

EPA CLEANUP GRANT PROGRESS MEETING Sanitary Laundry and McClung - - PowerPoint PPT Presentation

EPA CLEANUP GRANT PROGRESS MEETING Sanitary Laundry and McClung Warehouse Sites Anne Wallace, City of Knoxville, Deputy Director, Office of Redevelopment Liz Porter, S&ME Inc. March 19, 2018 BACKGROUND T wo Brownfie ld Site s PA De


slide-1
SLIDE 1

EPA CLEANUP GRANT PROGRESS MEETING Sanitary Laundry and McClung Warehouse Sites

Anne Wallace, City of Knoxville, Deputy Director, Office of Redevelopment Liz Porter, S&ME Inc. March 19, 2018

slide-2
SLIDE 2

T wo Brownfie ld Site s

BACKGROUND

E PA De finition – re a l pro pe rty, the e xpa nsio n, re d e ve lo pme nt,

  • r re use o f whic h ma y b e c o mplic a te d b y the pre se nc e o r

po te ntia l pre se nc e o f a ha za rdo us sub sta nc e , po lluta nts, o r c o nta mina nt.

F

  • rme r Sa nita ry L

a undry a nd Mc Clung Wa re house s Prope rtie s

slide-3
SLIDE 3

Knoxville’s Strategy for Brownfield Redevelopment

slide-4
SLIDE 4

TWO EPA CLEANUP GRANTS AWARDED SANITARY LAUNDRY ($200,000) MCCLUNG WAREHOUSES ($150,000) Both Grants require 20% City match ($70,000 total)

slide-5
SLIDE 5

EPA Ap Approval al Dat Date

EPA PA Brownf nfield lds s Gr Grant nt Progra gram

slide-6
SLIDE 6
slide-7
SLIDE 7
slide-8
SLIDE 8

Sanitary Laundry Site 625 North Broadway

Sub-slab Gas Example of Previous Findings

Previous Assessments

slide-9
SLIDE 9

Sanitary Laundry Site 625 North Broadway ฀

Drums of dry cleaning fluids removed in 1999

Dry cleaning compounds and solvents detected

City and TDEC have negotiated a Brownfield Agreement

City contracted roof replacement

slide-10
SLIDE 10

Sanitary Laundry Site 625 North Broadway ฀

Removal and disposal of containers and debris

Asbestos Removal

slide-11
SLIDE 11

Sanitary Laundry Site 625 North Broadway ฀

Almost 22 TONS of Waste Removed

slide-12
SLIDE 12

Sanitary Laundry Site 625 North Broadway ฀

Asbestos Abatement 900 linear feet of thermal system insulation 1,700 square feet of floor tile/mastic 800 square feet of ceiling cork board 400 square feet of boiler wrap

slide-13
SLIDE 13

Next Steps

Additional Assessment to Support Vapor Intrusion System Design

slide-14
SLIDE 14

Sanitary Laundry Site 625 North Broadway

Roof loss at the Broadway Facade Roof loss on east wall

slide-15
SLIDE 15

Sanitary Laundry Site 625 North Broadway

slide-16
SLIDE 16

Sanitary Laundry Site 625 North Broadway

slide-17
SLIDE 17

Sanitary Laundry Site 625 North Broadway

Roof repair at the Broadway Façade – two clerestory window panels to be closed Roof repair on east wall

slide-18
SLIDE 18

Sanitary Laundry Site 625 North Broadway

slide-19
SLIDE 19

Jackson Avenue Streetscapes ฀

Sidewalk construction complete other than a few areas where pole removal was needed

New lighting is installed and communications duct bank is constructed

AT&T is pulling wire and this will allow for the removal of the last poles

Completing storm water improvements

slide-20
SLIDE 20

Jackson Avenue Streetscapes ฀

Mill and overlay of the street surface is planned for the week of March 19

Final landscaping will follow

Full completion is dependent on private development utility work at Broadway

slide-21
SLIDE 21

*

* Property added - now owned by the City of Knoxville

slide-22
SLIDE 22
slide-23
SLIDE 23

McClung Warehouse Sites Jackson Avenue

slide-24
SLIDE 24

McClung Warehouse Sites Jackson Avenue ฀

Phase I and Phase II ESA

฀ Sampled soil, groundwater, soil gas and suspect asbestos containing material

slide-25
SLIDE 25

McClung Warehouse Sites Jackson Avenue ฀

Elevated Metals

฀ Asbestos Containing Material (ACM) ฀ Benzene in soil gas exceeded residential screening levels

slide-26
SLIDE 26

McClung Warehouse Sites Jackson Avenue ฀ Asbestos removal ฀ Remove soils with elevated metals and replace with clean fill ฀ Since residential use may be proposed, address potential vapor intrusion

slide-27
SLIDE 27

McClung Warehouse Sites Jackson Avenue ฀ Passive Soil Vapor Survey ฀ Soil Sampling – Pesticides ฀ Soil Borings

slide-28
SLIDE 28

Next Steps

Asbestos Evaluation Address elevated metals in soil – limited, localized soil removal?

slide-29
SLIDE 29

Next Steps

Additional Assessment to Confirm Soil Gas Survey Findings

slide-30
SLIDE 30

Questions & Comments

For more information please visit our website: www.knoxvilletn.gov/cleanupgrants Contacts: Anne Wallace - awallace@knoxvilletn.gov Liz Porter - lporter@smeinc.com