erica.utsi@utsielectronics.co.uk ATU: The Objectives Work Stream 3 - - PowerPoint PPT Presentation

erica utsi utsielectronics co uk atu the objectives
SMART_READER_LITE
LIVE PREVIEW

erica.utsi@utsielectronics.co.uk ATU: The Objectives Work Stream 3 - - PowerPoint PPT Presentation

Erica Utsi Utsi Electronics Ltd erica.utsi@utsielectronics.co.uk ATU: The Objectives Work Stream 3 assess the condition of the infrastructure using GPR deployed in different manners. What exactly are we looking for? Target size (cf


slide-1
SLIDE 1

Erica Utsi Utsi Electronics Ltd erica.utsi@utsielectronics.co.uk

slide-2
SLIDE 2

ATU: The Objectives

Work Stream 3 –“assess the condition of the infrastructure using GPR deployed in different manners.”

slide-3
SLIDE 3

What exactly are we looking for?

 Target size (cf reduction from service to

deterioration)?

 Target Depth?  Type of Target e.g. water, fibre optic cables?  Type of Cover – build materials?  Instrumentation - A Camera?  Limitations of the GPR or……….?

slide-4
SLIDE 4

Target Resolution

400MHz Measurement in fractions/unit of λ. Moving on to problems in the Infrastructure.

slide-5
SLIDE 5

 Overcrowding in the Subsurface  Cast Iron pipes – detection of pipe & differentiation of

condition.

 What’s leaking & how big is the fracture?  Tree roots?  Λ varies with water content.  Corrosion – inside or outside?  Faint targets (e.g. fibre optic cables)

Target Resolution

We need to know what we are measuring.

slide-6
SLIDE 6

 No one size radar fits all situations.

 Frequency/Wavelength critical for detection.  So is Survey Medium.  So is Depth (20 λ)

 800MHz (compromise between 400/500MHz and 1 to

1.5GHz.)

 Magnetic Losses?

 Dual e.g. 400MHz & 1.5GHz.

 Cost implication in terms of antennas/ multi-channel

controller.

Target Resolution

slide-7
SLIDE 7

Target Resolution

1 2 3 1GHz 4GHz – tendon duct 400MHz & 1GHz

slide-8
SLIDE 8

 Duos

 extracted, not added, frequency range  Implication for smaller targets.

 Swept Frequency

 near surface problematical

(overloading of Rx from continual transmission)

 speed implications.

 Pre-Filtering

 Processes must be appropriate

Target Resolution

slide-9
SLIDE 9

The Blue Planet

An Efficient Excavator

slide-10
SLIDE 10

Water

Slower Transmission speed Leakage ≠ Water 1.5GHz (In Bore) 50MHz

slide-11
SLIDE 11

Water

Ionised material a major problem when combined with water (mobility). But that doesn’t necessarily mean That all wet clay is unsuitable.

slide-12
SLIDE 12

Voids

400 MHz 4GHz 6GHz

slide-13
SLIDE 13

Build Materials

Beware of recycled materials Blast Furnace Slag Blue Engineering Bricks Some membranes

slide-14
SLIDE 14

Combined Technology

slide-15
SLIDE 15

Training

 Current role of GPR in utility detection training

 GPR/EML split?  1 radar system?  Implications for Condition Assessment.

slide-16
SLIDE 16

Training

 Pejuta – Malaysian Land Surveyors - MTU Initiative  EuroGPR – on-line competency assessment.

slide-17
SLIDE 17

Over to you…………………….