Forecasting opex productivity growth factors
Presentation to the AER
Forecasting opex productivity growth factors Presentation to the - - PowerPoint PPT Presentation
Forecasting opex productivity growth factors Presentation to the AER 30 November 2018 ISSUE DEFINITION TASK FOR THE AER To establish a reasonable forecast of the likely opex needs of the business. The forecast should not give rise
Presentation to the AER
2
3
4
base year (as far back at 2012-13) was accepted as efficient in most recent determination.
frontier should be consistent in setting both the base and trend.
schemes, reversal of jurisdictional licence conditions.
6
7
0% 10% 20% 30% 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Opex MPFP % Change
Citipower Powercor SA Power Tas Networks United Energy
analysis provided but we assume it refers to jurisdictional licence conditions and VBRC
2006-12 period given:
finalised in July 2012.
8
1.00 1.10 1.20 1.30 1.40 1.50 2006 2007 2008 2009 2010 2011 2012
Opex Growth 2006-12
NSW & Qld. DNSPs Other DNSPs
9
LISTEN......RESPECT......DELIVER
10
11
12
rate than otherwise.
many DNSPs.
13
14
LISTEN......RESPECT......DELIVER