LIBRA Extended Well Test:
Getting Ready for First Oil
Francisco Costa
Joint Venture Operator
Getting Ready for First Oil Francisco Costa Joint Venture Operator - - PowerPoint PPT Presentation
LIBRA Extended Well Test: Getting Ready for First Oil Francisco Costa Joint Venture Operator Slide 2 EXTENDED WELL TEST IN LIBRA Several Industry Firsts: First FPSO dedicated for EWT with gas injection First use of 8 production
Joint Venture Operator
Slide 2
EWTs: Reduction of uncertainty by understanding dynamic behavior is crucial to optimize final production systems.
Wells Production Well Production Unit Oil Capacity: 50 mil bbl/d Gas Compression: 4.0 MM m3/d Wells Gas Injection Well
NW-2 NW-3
2017 2018 2019 2020 2021 2022 2023 EWT / EPS PROGRAM LIBRA 1 LIBRA 2 LIBRA 3 LIBRA 4
FPSO LOI OPERATION DP WELLS CAMPAIGN FPSO GTD FPSO LOI DP WELLS CAMPAIGN FPSO GTD FPSO LOI FPSO GTD FPSO LOI OPERATION OPERATION 1ST OIL
Ref: Forecast Apr/17, Petrobras Business Plan 17-21 and Libra Business Plan 2017
1ST OIL DP WELLS CAMPAIGN 1ST OIL DP WELLS CAMPAIGN 1ST OIL
Injection Line Drilled Wells Completed Wells
Libra 2 Libra 3 Libra 1 Libra 4
NW1 NW5 NW2 NW3 NW4
Production Line
EWT SPA 1 SPA 2
1ST OIL JUL/17
detection of sealing faults
subsea design.
.
Slide 6
Duration (days)
source: Halliburton
Source: Halliburton
Flexibility for different tests during EWT Pressure & Temperature for each interval Flow / Static control Intervals can be closed and monitored downhole Remote control from FPU
Source: Petrobras
Slide 8
Opened ICV Packer Feed Through
..................................
Slide 9
Slide 10
Torpedo Flexible Lines Mooring Chains Triplate Xmas Tree
.................................. ..................................
Slide 13
.................................. Libras´ ´ ´ ´s First ANM stackup installed
Slide 15
..................................
Slide 16
..................................
PO SV SV PO SV UEH UEH PO UEH
Scenario 1
without pre-laying
Scenario 2
Pre-laying without buoyancy modules
Scenario 3
Pre-laying with buoyancy modules
22 39 51 12 17
Base Case Optimization 17 days in advance
..............................
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
Slide 36 TURRET Production slot 1 Production slot (spare) 1 Gas injection slot 1 PROCESSING CAPACITY Oil 50 kbpd Liquid 50 kbpd Produced water (up to 50% BSW) 25 kbpd Gas 4 MMsm3/d Storage 756.000 bbl CONTAMINANTS H2S – gas phase 170 ppmv CO2 – gas phase ≤ 60 %
....................................................... .......................................................
Slide 37
.................................. ........................................
Slide 38 Swivel Test: Operating pressure= 550 barg; Design pressure = 605 barg. Swivel Stack-Terminated Cables (Feb 2017) Swivel Integration Spool
.................................. ..................................
Slide 41
FPSO Sail Away (03.28.2017)