LIBRA Extended Well Test: Getting Ready for First Oil Francisco Costa Joint Venture Operator Slide 2 EXTENDED WELL TEST IN LIBRA Several Industry Firsts: First FPSO dedicated for EWT with gas injection First use of 8 production


slide-1
SLIDE 1

LIBRA Extended Well Test:

Getting Ready for First Oil

Francisco Costa

Joint Venture Operator

slide-2
SLIDE 2

EXTENDED WELL TEST IN LIBRA

  • First FPSO dedicated for EWT with gas

injection

  • First use of 8” production flexible line
  • First Production line pre-laying with buoys
  • Largest External Turret in Ultra Deep Waters
  • Swivel operation with the highest gas

injection pressure

Slide 2

Several Industry Firsts:

slide-3
SLIDE 3

EXTENDED WELL TEST IN LIBRA

EWTs: Reduction of uncertainty by understanding dynamic behavior is crucial to optimize final production systems.

Wells Production Well Production Unit Oil Capacity: 50 mil bbl/d Gas Compression: 4.0 MM m3/d Wells Gas Injection Well

NW-2 NW-3

slide-4
SLIDE 4

NW REGION DEVELOPMENT PLAN CONSIDERS FOUR PRODUCTION UNITS (PILOT + 3 MODULES)

2017 2018 2019 2020 2021 2022 2023 EWT / EPS PROGRAM LIBRA 1 LIBRA 2 LIBRA 3 LIBRA 4

FPSO LOI OPERATION DP WELLS CAMPAIGN FPSO GTD FPSO LOI DP WELLS CAMPAIGN FPSO GTD FPSO LOI FPSO GTD FPSO LOI OPERATION OPERATION 1ST OIL

Ref: Forecast Apr/17, Petrobras Business Plan 17-21 and Libra Business Plan 2017

1ST OIL DP WELLS CAMPAIGN 1ST OIL DP WELLS CAMPAIGN 1ST OIL

Injection Line Drilled Wells Completed Wells

Libra 2 Libra 3 Libra 1 Libra 4

NW1 NW5 NW2 NW3 NW4

Production Line

EWT SPA 1 SPA 2

1ST OIL JUL/17

slide-5
SLIDE 5

EWT MAIN IMPACTS MAIN UNCERTAINTIES X INFORMATION ACQUIRED

  • Long term dynamic performance of wells and reservoir.
  • Minimum “connected” oil in place, reservoir boundaries and

detection of sealing faults

  • Detection of conductive fractures and/or super-K layers.
  • Flow assurance issues and efficiency of mitigating actions
  • Drainage plan - optimal number and location of wells &

subsea design.

  • Production and injection strategy.
  • More reliability in the production forecasts.

.

slide-6
SLIDE 6

WELLS

Slide 6

Duration (days)

slide-7
SLIDE 7

source: Halliburton

INTELLIGENT COMPLETION

Source: Halliburton

Flexibility for different tests during EWT Pressure & Temperature for each interval Flow / Static control Intervals can be closed and monitored downhole Remote control from FPU

Source: Petrobras

slide-8
SLIDE 8

3-RJS-742A COMPLETION WITH WEST CARINA

Slide 8

Opened ICV Packer Feed Through

..................................

slide-9
SLIDE 9

SUBSEA

Slide 9

slide-10
SLIDE 10

Acquisition of Key Components

Slide 10

Torpedo Flexible Lines Mooring Chains Triplate Xmas Tree

.................................. ..................................

slide-11
SLIDE 11

EWT Mooring Instalation

slide-12
SLIDE 12

Torpedo #3 installed

slide-13
SLIDE 13

Slide 13

.................................. Libras´ ´ ´ ´s First ANM stackup installed

slide-14
SLIDE 14

EWT: 8” PRODUCTION FLEXIBLE LINES

slide-15
SLIDE 15

EWT: 8” PRODUCTION FLEXIBLE LINES

Slide 15

..................................

slide-16
SLIDE 16

TYPICAL RISER INTERMEDIATE BUOYS INSTALLATION

Slide 16

..................................

slide-17
SLIDE 17

FIRST PRODUCTION LINE PRE-LAYING & ABANDONMENT WITH BUOYS

PO SV SV PO SV UEH UEH PO UEH

Scenario 1

without pre-laying

Scenario 2

Pre-laying without buoyancy modules

Scenario 3

Pre-laying with buoyancy modules

22 39 51 12 17

Base Case Optimization 17 days in advance

675 M

..............................

slide-18
SLIDE 18

CONFIDENTIAL

Subsea Activities

LIBRA | Comitê de Gestão | EWT Update| April 27th 2017

slide-19
SLIDE 19

CONFIDENTIAL

Subsea Activities

LIBRA | Comitê de Gestão | EWT Update| April 27th 2017

slide-20
SLIDE 20

CONFIDENTIAL

Subsea Activities

LIBRA | Comitê de Gestão | EWT Update| April 27th 2017

slide-21
SLIDE 21

CONFIDENTIAL

Subsea Activities

LIBRA | Comitê de Gestão | EWT Update| April 27th 2017

slide-22
SLIDE 22

CONFIDENTIAL

Subsea Activities

LIBRA | Comitê de Gestão | EWT Update| April 27th 2017

slide-23
SLIDE 23

CONFIDENTIAL

Subsea Activities

LIBRA | Comitê de Gestão | EWT Update| April 27th 2017

slide-24
SLIDE 24

CONFIDENTIAL

Subsea Activities

LIBRA | Comitê de Gestão | EWT Update| April 27th 2017

slide-25
SLIDE 25

CONFIDENTIAL

Subsea Activities

LIBRA | Comitê de Gestão | EWT Update| April 27th 2017

slide-26
SLIDE 26

CONFIDENTIAL

Subsea Activities

LIBRA | Comitê de Gestão | EWT Update| April 27th 2017

slide-27
SLIDE 27

CONFIDENTIAL

Subsea Activities

LIBRA | Comitê de Gestão | EWT Update| April 27th 2017

slide-28
SLIDE 28

CONFIDENTIAL

Subsea Activities

LIBRA | Comitê de Gestão | EWT Update| April 27th 2017

slide-29
SLIDE 29

CONFIDENTIAL

Subsea Activities

LIBRA | Comitê de Gestão | EWT Update| April 27th 2017

slide-30
SLIDE 30

CONFIDENTIAL

Subsea Activities

LIBRA | Comitê de Gestão | EWT Update| April 27th 2017

slide-31
SLIDE 31

CONFIDENTIAL

Subsea Activities

LIBRA | Comitê de Gestão | EWT Update| April 27th 2017

slide-32
SLIDE 32

CONFIDENTIAL

Subsea Activities

LIBRA | Comitê de Gestão | EWT Update| April 27th 2017

slide-33
SLIDE 33

CONFIDENTIAL

Subsea Activities

LIBRA | Comitê de Gestão | EWT Update| April 27th 2017

slide-34
SLIDE 34

CONFIDENTIAL

Subsea Activities

LIBRA | Comitê de Gestão | EWT Update| April 27th 2017

slide-35
SLIDE 35

CONFIDENTIAL

Subsea Activities

LIBRA | Comitê de Gestão | EWT Update| April 27th 2017

slide-36
SLIDE 36

FPSO PIONEIRO DE LIBRA

Slide 36 TURRET Production slot 1 Production slot (spare) 1 Gas injection slot 1 PROCESSING CAPACITY Oil 50 kbpd Liquid 50 kbpd Produced water (up to 50% BSW) 25 kbpd Gas 4 MMsm3/d Storage 756.000 bbl CONTAMINANTS H2S – gas phase 170 ppmv CO2 – gas phase ≤ 60 %

....................................................... .......................................................

slide-37
SLIDE 37

TURRET

Slide 37

One of the heaviest external cantilever Turret The largest (approximately 47m x 16m) external cantilever Turret in ultra deepwater (up to 2.400m) Pull in capacity: 700 ton

.................................. ........................................

slide-38
SLIDE 38

SWIVEL

Slide 38 Swivel Test: Operating pressure= 550 barg; Design pressure = 605 barg. Swivel Stack-Terminated Cables (Feb 2017) Swivel Integration Spool

.................................. ..................................

slide-39
SLIDE 39

FPSO PIONEIRO DE LIBRA

slide-40
SLIDE 40

FPSO PIONEIRO DE LIBRA

slide-41
SLIDE 41

Slide 41

Thank You

FPSO Sail Away (03.28.2017)