1 FNSS Savunma Sistemleri A.S. Proprietary Information. The information contained in this document is FNSS Savunma Sistemleri A.S. proprietary information and is disclosed in confidence. It is the property of FNSS Savunma Sistemleri A.S: and shall


slide-1
SLIDE 1

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 1

Mehmet TUNÇ

PLM, Configuration Management and TDP Development Department Manager (Mech. Eng. M.Sc.)

GTC EUROPE 2017

10-12 Oct, Munich

FNSS Savunma Sistemleri A.S. Proprietary Information. The information contained in this document is FNSS

Savunma Sistemleri A.S. proprietary information and is disclosed in confidence. It is the property of FNSS Savunma Sistemleri A.S: and shall not be used, disclosed to others or reproduced without the express written consent of FNSS Savunma Sistemleri A.S.

slide-2
SLIDE 2

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 2

SUMMARY

slide-3
SLIDE 3

The 30th Integrated Process Excellence Symposium, 18-20 Sep 2017, Orlando - COMMERCIAL IN CONFIDENCE 3

My Last Holiday Days Before Conference

slide-4
SLIDE 4

My Last Holiday Days

slide-5
SLIDE 5

My Last Holiday Days

slide-6
SLIDE 6

69 Slides 40 Minutes

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 6

AGENDA

  • FNSS Company Profile
  • FNSS CAD Environment
  • Summary & Benefits
  • Current Status
  • FNSS 3D CAD Virtualization Project
  • Next Steps & Lessons Learned
slide-7
SLIDE 7

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 7

Company Profile

slide-8
SLIDE 8

8 GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE

FNSS Profile

  • Established in 1989, Gölbaşı / Ankara
  • Leading manufacturer and supplier of tracked and wheeled armored vehicles and weapon systems.

Vision Globally trusted and respected Turkish partner in defense Mission We protect and add value to our users and stakeholders by creating innovative solutions

slide-9
SLIDE 9

9 GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE

FNSS Product Evolution

PARS 6x6 Armoured Wheeled Vehicle Development CLAW Remote Controlled Turret Development SSM AACE Contract SSM AAAB Contract M113 Modernisation Contract AV-8 8x8 WAV Contract ACV-15 Contract PARS 8x8 WAV Development ACV-15 Contract SSM ACV-15 Contract

1990-94 1996-2000 2002 2004 2006 2008 2010 2012 2013

KAPLAN LAWC-T Development

Licensed Manufacturer Indigenous Product Manufacturer

2015

KAPLAN-20 NGAFV Development SABER 25 Turret Development TEBER-30 RCT Development

2016

PARS III 6x6 – 8x8 WAV Contract Modern Medium Weight Tank Development Contract SSM PARS 4X4 WCV Contract SSM KAPLAN-15 WCV Contract

2017

M113 Modernization Studies ACV-19 Development SSM AAV (ZAHA) Contract SSM ATGM Turret SSM ACV-15 AAPC Contract ACV-SW Air Defense Platform Contract TEBER-30 2-Man Turret Development

slide-10
SLIDE 10

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 10

Products 1/3

slide-11
SLIDE 11

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 11

Products 2/3

slide-12
SLIDE 12

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 12

Products 3/3

slide-13
SLIDE 13

13 GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE

FNSS VIDEO

slide-14
SLIDE 14
  • FNSS Company Profile
  • FNSS CAD Environment
  • Summary & Benefits
  • Current Status
  • FNSS 3D CAD Virtualization Project

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 14

AGENDA

  • Next Steps & Lessons Learned
slide-15
SLIDE 15

PLM, CM and TDP Development Department PLM Systems CAD Management Configuration Management Engineering and R&D

  • Managing PLM environment and CAD processes
  • Technical data package preparation and knowledge management
  • Managing configuration related operational activities

Technical Data Package Prep. IT

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 15

Department Profile

slide-16
SLIDE 16

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 16

CAx INFRASTRUCTURE

CAD CAM

  • CATIA V6
  • 3DVIA
  • SOLIDWORKS
  • Q-CHECKER
  • AUTOCAD
  • CADDS5
  • DELMIA
  • CATIA
  • 3DVIA
  • NX
  • SIGMANEST

CAE

  • ANSYS
  • LSDYNA
  • ADAMS
  • MATLAB
  • HYPERMESH
  • EAGLE
  • JACK
  • RHINO
  • VESYS
  • GRANTA
  • FRACAS
  • AUTO.STUDIO
  • MATHCAD

PLM

  • ENOVIA

DB

Server Virtualisation Backup Operation System WS GPU Thin Client

  • ORACLE
  • MS SQL

CAx Domain  Isolated Network (10 Gb/s)

slide-17
SLIDE 17

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 17

FNSS CAD & HW HISTORY

1989 2004 2013 May

slide-18
SLIDE 18
  • FNSS Company Profile
  • FNSS CAD Environment
  • Summary & Benefits
  • Current Status
  • FNSS 3D CAD Virtualization Project

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 18

  • Next Steps & Lessons Learned

AGENDA

slide-19
SLIDE 19
  • FNSS Company Profile
  • FNSS CAD Environment
  • Summary & Benefits
  • Current Status
  • FNSS 3D CAD Virtualization Project

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 19

  • Next Steps & Lessons Learned
  • Requirement / Purpose

AGENDA

slide-20
SLIDE 20

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 20

vGPU NEED ?

  • Classically, a CAD or a CAE user needs a Workstation

Computer for doing his/her tasks

slide-21
SLIDE 21

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 21

vGPU NEED ?

  • High capacity (and Costly !) WS’s purchased for full time CAD users &

Drafters

  • WS’s renewed periodically for same group of people
slide-22
SLIDE 22

22 GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE

Heavy User Vs Light User

  • (*) British Short Hair
slide-23
SLIDE 23

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 23

vGPU NEED ?

  • Lower Cost or Older WS’s are provided to partial CAD users and light

users.

  • They have problems when they work with extra-large assemblies !
slide-24
SLIDE 24

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 24

vGPU NEED ?

  • My Dream / Requirement:
  • Centrally located powerful WS’s or Servers
  • Allocate it to the partial/light CAD users via remote desktop, whenever they need additional

power for large assemblies

  • Cut the expenses for buying high capacity

expensive WS to each & every CAD user.

slide-25
SLIDE 25

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 25

vGPU NEED ?

  • Requirement was absolutely a dream previous years…
  • GPU HW and the technology was not adequate
  • Remote access SW capabilities were not good enough
  • My different attempts failed
slide-26
SLIDE 26
  • FNSS Company Profile
  • FNSS CAD Environment
  • Summary & Benefits
  • Current Status
  • FNSS 3D CAD Virtualization Project

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 26

  • Next Steps & Lessons Learned
  • Initiation and First Part

AGENDA

slide-27
SLIDE 27

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 27

START UP of the PROJECT

  • A software solution provider come to us (2014, March) and say the magical

words...

  • ‘’Nvidia Grid Technology is a game changer’’
  • ‘’vGPU user community is increasing, there are many companies investing and using it.’’
  • ‘’We have applied it in several universities, institutions, etc..’’
  • ‘’Our software is the best; it is %10 faster to competitor and more reliable’’
  • We initiated a market search & feasibility study
slide-28
SLIDE 28

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 28

FNSS CAD & HW HISTORY

1989 2004 2013 2014 March

vGPU Feasibility Study ???

slide-29
SLIDE 29

DELL EMC FORUM, 3 Oct 2017, İstanbul - COMMERCIAL IN CONFIDENCE 29

VDI Technology

slide-30
SLIDE 30

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 30

NVDIA GRID TECHNOLOGY

slide-31
SLIDE 31

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 31

START UP of the POC

  • We asked for a POC study
  • SW company proposed another solution partner (?!)
  • Studies initiated (2014, September)
  • POC Lasted 3 months,
  • Vendor’s demo & testing server (Fujitsu R920) & 2 thin clients installed
  • IT and PLM groups were busy with other operational tasks (as most of the times !),
  • There were problems, but it is said to be solved with real server deployment and

real effort & concentration...

  • Studies were found to be successful
  • GO decision given
slide-32
SLIDE 32

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 32

FNSS CAD, HW & vGPU HISTORY

1989 2004 2013 May 2014 March vGPU Feasibility Sudy 2014 Sep-Nov

slide-33
SLIDE 33

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 33

FNSS CAD, HW & vGPU HISTORY

1989 2004 2013 May 2014 March vGPU Feasibility Study 2014 Sep-Nov 2015 Feb Purchase

slide-34
SLIDE 34

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 34

Purchase of the Initial HW & SW

  • First Group HW and SW are purchased (2015, Feb.)
  • 5 Servers (Dell PowerEdge R720, Intel Xeon E-26XX v2 Processors, Intel Xeon E5-2670 2.5 GHGz 25M Cache, 8.0GT/s QPI Turbo,

HT, 10 C 1866 MHz, 24 X 16GB RDIMM 1600 MHz, 2 X NVIDIA GRID K2 GPU)

  • 35 Dell thin clients, (DELL WYSE Z90Q8 - 16GF/4GR - QUAD CORE)
  • 35 XenDesktop (Platinium)
  • Service Agreement is signed
slide-35
SLIDE 35

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 35

DEPLOYMENT OF HW & SW

  • HW and SW are installed (Feb 2015)
slide-36
SLIDE 36

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 36

First Part 1/6

  • Server deployments are completed.
  • 5 clients are provided to some key users.
  • WS’s are kept below their desk as a

failsafe mechanism.

  • After some period, performance issues and compatibility problems with

Catia V6 is observed.

  • WS are taken back to service !
slide-37
SLIDE 37

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 37

First Part 2/6

  • Server and client deployments are repeated with different setup

parameters and method (2015, Mar)

  • Admin tests are completed
  • 5 clients are provided to same key users.
  • After some period, different types of performance issues and

crash-downs observed.

  • WS’s are taken back again to service !
slide-38
SLIDE 38

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 38

First Part 3/6

  • Solution provider is recalled for solving the

problems.

  • Response was not quick, as their technical

manager quit the job !

  • Another experienced engineer provided support,

and he tried new deployment configurations.

  • Tests are reinitiated, some other issues are
  • bserved. Studies were ongoing to solve the

issues.

  • Suddenly, we got a message that this key

admin also quit the job!

slide-39
SLIDE 39

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 39

First Part 4/6

  • We had a louder complaint directly to the SW provider
  • They guarantee their concrete support (2015, June)
  • Studies reinitiated with the same solution partner with a newly hired

administrator

  • And also direct SW provider support is given
slide-40
SLIDE 40

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 40

First Part 5/6

  • System started to become faster and more accurate.
  • Test users are enlarged to 20+ numbers
  • When the load on the system starts to increase with user

quantity, stability problems re-occured and crash downs continue.

  • For different problems & errors reported by users, we had

to wait for some days/weeks to reach to a solution.

  • WS are taken back to service !
slide-41
SLIDE 41

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 41

First Part 6/6

  • After additional 3 months of trial & errors, PLM teams credibility and

user’s believe in to the system ended

  • Users don’t want to use the thin clients due

to their heavy work load & tight schedules

  • Our believe & trust to the SW and the Partner goes below zero !
slide-42
SLIDE 42
  • FNSS Company Profile
  • FNSS CAD Environment
  • Summary & Benefits
  • Current Status
  • FNSS 3D CAD Virtualization Project

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 42

  • Next Steps & Lessons Learned
  • Second Part

AGENDA

slide-43
SLIDE 43

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 43

FNSS CAD, HW & vGPU HISTORY

1989 2004 2013 May 2014 March vGPU Feasibility Study 2014 Sep-Nov 2015 Feb-Aug Deployment 2015 June

slide-44
SLIDE 44

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 44

Re-initiation with another SW Provider

  • We contact with another virtualization solution provider and ask their

guidance (2015 Sep.)

  • They offered direct involvement.
  • ‘’VmWare Horizon with the new version is very stable and fast’’
  • ‘’We have the expertise and will not let a similar failure’’
  • Decision: A new POC study initiation
slide-45
SLIDE 45

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 45

Second Part POC 1/2

  • We deployed Horizon Client and Horizon ESX and started POC tests once

more (2015 October)

  • Everything seemed to be well working
  • POC takes about 2,5 months,
  • The deployment is enlarged to 20 users during POC.
  • Again some problems observed but the response and solution providing was

very fast.

slide-46
SLIDE 46

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 46

Second Part POC 2/2

  • The systems come to a mature and reliable state
  • It is enlarged to 35 users, all thin clients became active (2016, Feb)
  • We cancelled the agreement with other SW Product and decided to

go on with this SW and solution partner.

slide-47
SLIDE 47

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 47

FNSS CAD, HW & vGPU HISTORY

1989 2004 2013 May 2014 March vGPU Market Search 2014 Sep-Nov 2015 Feb-Aug Deployment 2015 Oct-Dec 2016 Feb 2015 June Live vGPU System

slide-48
SLIDE 48
  • FNSS Company Profile
  • FNSS CAD Environment
  • Summary & Benefits
  • Current Status
  • FNSS 3D CAD Virtualization Project

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 48

  • Next Steps & Lessons Learned
  • Results & Enlargement

AGENDA

slide-49
SLIDE 49

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 49

Results of 2nd Part of the Project

  • Users are happy with system
  • We were planning to use the system for light users.
  • But the performance is high, even better than our new WS’s
  • Thin clients are also provided to full time CAD users
slide-50
SLIDE 50

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 50

Results of 2nd Part of the Project

  • I am also using thin client at the moment
  • I am a rare CAD user,
  • Happy with the overall performance, free office space, less heat and

noise.

slide-51
SLIDE 51

51 GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE

Enlargement

  • 2nd Group of HW and SW are purchased (2016, June)
  • 2 Servers (Dell PowerEdge R730, Intel Xeon E5-2650 v3 2.3GHz,25M Cache,9.60GT/s QPI,Turbo,HT,10C/20T (105W) Max Mem

2133MHz, 16 x 32GB RDIMM, 2 X NVIDIA GRID K2 GPU)

  • 59 thin clients (HP t420 Smart Zero), 11 thin clients (DELL WYSE Z90Q8 - 16GF/4GR - QUAD CORE)
  • Additional Rams for 1st Group HW Servers
  • 105 Vmware Horizon Client (Enterprise)
  • Vmware ESX (Enterprise)
  • Service Agreement is signed
slide-52
SLIDE 52
  • FNSS Company Profile
  • FNSS CAD Environment
  • Summary & Benefits
  • Current Status
  • FNSS 3D CAD Virtualization Project

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 52

  • Next Steps & Lessons Learned

AGENDA

slide-53
SLIDE 53

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 53

Enlargement

  • 3rd Group of HW and SW are purchased (2016, December)
  • 5 Servers (Dell PowerEdge R730, Intel Xeon E5-2650 v3 2.3GHz,25M Cache,9.60GT/s QPI,Turbo,HT,10C/20T (105W) Max Mem

2133MHz, 16 x 32GB RDIMM, 2 X NVIDIA GRID K2 GPU)

  • 70 thin clients (DELL WYSE Z90Q8 - 16GF/4GR - QUAD CORE)
  • Vmware Horizon Client (Enterprise)
  • Vmware ESX (Enterprise)
slide-54
SLIDE 54

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 54

Current Status 1/2

Had been a long project with various blockages 2014 Sep – 2016 Feb Project is completed with a happy ending, with so many lessons learned. Currently 175 users on the system,  Will be enlarged to 360(+) in 2.5 years  We are not investing on physical WS’s WS virtualization is our strategic direction and choice for CAD-HW.

slide-55
SLIDE 55

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 55

Current Status 2/2

  • Design & engineering outsourcing infrastructure
  • Our design partners are connecting to our systems
slide-56
SLIDE 56
  • FNSS Company Profile
  • FNSS CAD Environment
  • Summary & Benefits
  • Current Status
  • FNSS 3D CAD Virtualization Project

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 56

  • Next Steps & Lessons Learned

AGENDA

slide-57
SLIDE 57

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 57

Summary for vGPU – VIRTUAL WORKSTATIONS

  • Powerful mainframe servers
  • Users remotely connect to CAD Virtualisation servers
  • ‘’Company Enterprise Cloud’’
slide-58
SLIDE 58

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 58

Benefits 1/4

  • Investment savings on initial HW & SW procurement:
  • Calculated as: % 37
  • Decrease in electricity consumption,
  • Decrease in noise and heat generation
  • Personnel office space gain
slide-59
SLIDE 59

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 59

Benefits 2/4

  • 7/24 system availability, redundancy and reliability
  • Easier and efficient system administration
  • Currently very small group
  • f Administrators can handle

the system operations and administration activities.

  • Same SW configuration on all users
  • Possibility to upgrade a CAD/CAE SW version on all clients easily in one shot
  • It was traditionally taking some pre-planned and arranged days of work.
  • Today, we can just prepare the image and extend it to the related users.
slide-60
SLIDE 60

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 60

Benefits 3/4

  • Adjustable and customized HW/resource share for additional performance

needs / for different user profiles

  • Performance for CAD operations seem to be faster than WS’s
slide-61
SLIDE 61

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 61

Benefits 4/4

  • Increased Security: We are generating expensive knowledge. Today

they are not in any client’s hard disk but they are on the enterprise cloud.

  • Accessibility: In addition to our supply chain, we have external offices

and had to do business remotely. This technology provides us easy collaboration with our extended enterprise.

slide-62
SLIDE 62
  • FNSS Company Profile
  • FNSS CAD Environment
  • Summary & Benefits
  • Current Status
  • FNSS 3D CAD Virtualization Project

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 62

  • Next Steps & Lessons Learned

AGENDA

slide-63
SLIDE 63

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 63

NEXT STEPS 1/4

  • ‘’For Industry 4.0, companies will have to invest heavily for building capabilities in four dimensions’’.

McKinsey

  • ‘’The intensive use of IT in production will require more IT-competencies in the companies’’,

Acxessio GmbH

slide-64
SLIDE 64

DELL EMC FORUM, 3 Oct 2017, İstanbul - COMMERCIAL IN CONFIDENCE 64

NEXT STEPS 2/4

  • 2017-2021 FNSS Strategic Plan
  • (Finilized in Capadocia Camp)
  • 4th of the 4 THEMES: ’’CAPABILITY ENHANCEMENT’’
  • Objective: ’’Define and invest in next generation capabilities for FNSS’’
  • Initiative: ’’Digitalization of FNSS’, with Industry 4.0 trends & advancing technologies
  • Integrations and Process Improvements,
  • SW,
  • Data & Analytics,
  • Data Security,
  • Hardware & Infrastructure,
slide-65
SLIDE 65

DELL EMC FORUM, 3 Oct 2017, İstanbul - COMMERCIAL IN CONFIDENCE 65

NEXT STEPS 3/4

  • Integrations:
  • Seamless enterprise data connection and end to end traceability (Digital Thread), digitization and

automation of knowledge work for collaboration.

  • Horizontal & vertical
  • EBOM to MBOM, SBOM
  • PLM & ERP, Software Integrations,
  • Process Improvements:
  • Manual workarounds automations,
  • Data from papers or excel sheets should be handled on enterprise applications.
  • ’’To tap the power of the Digital Thread, all

facets of the organization and all lifecycle phases are reliant upon the Enterprise Configuration Management (ECM) process.’’

IPX: Institute for Process Excellence

slide-66
SLIDE 66

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 66

NEXT STEPS 4/4

  • vGPU and CAD Virtualization will be our strategic future

direction for our CAD Hardware assets.

  • We will continue to invest on this technology to cover all

WS hardware inventory step by step in 2.5 years.

  • In addition: All PC’s to be replaced by thin clients in the

following years

slide-67
SLIDE 67

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 67

LESSONS LEARNED 1/3

  • Solution partner’s maturity, background and

experience level is very important.

  • Never underestimate the POC studies !
  • Give importance and spend adequate man-hours !
  • Perform close to real life tests & scenarios
  • Visit the reference customers at least call them for

checking the truth of the success stories

  • HW selection, configuration and compatibility is very critical
slide-68
SLIDE 68

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 68

LESSONS LEARNED 2/3

  • Capable, trained and experienced IT team is a must
  • Executive level sponsorship is required
  • Communicating with the users is critical
  • Getting the support from ‘’key staff’’ is critical
slide-69
SLIDE 69

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 69

LESSONS LEARNED 3/3

slide-70
SLIDE 70

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 70

Mehmet TUNÇ mehmet.tunc@fnss.com.tr

slide-71
SLIDE 71

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 71

Current Inventory

  • 12 Servers (Dell PowerEdge R730, Intel Xeon E5-2650 v3 2.3GHz,25M Cache,9.60GT/s QPI,Turbo,HT,10C/20T (105W) Max

Mem 2133MHz, 16 x 32GB RDIMM, 2 X NVIDIA GRID K2 GPU) (2CPUx12Core – 512 Gbyte RAM – 2 K2 GRID)

  • 175 thin clients (116 DELL WYSE Z90Q8 - 16GF/4GR - QUAD CORE, 59 HP t420 Smart Zero )
  • Vmware Horizon Client (Enterprise)
  • Vmware ESX (Enterprise)
slide-72
SLIDE 72

GTC EUROPE 2017, 10-12 Oct, Munich - COMMERCIAL IN CONFIDENCE 72

Servers