How to implement DECCs DSR Metering Option (a) use of the HHDA Agenda Item Timing Lead Introductions 10.00 (5 min) All Objectives, scope and 10.05 (25 min) ELEXON approach of Workshop Discussions 10.30 (1.5 hrs) All (working)


slide-1
SLIDE 1

How to implement DECC’s DSR Metering Option (a) – use of the HHDA

slide-2
SLIDE 2

1

Agenda

Item Timing Lead Introductions 10.00 (5 min) All Objectives, scope and approach of Workshop 10.05 (25 min) ELEXON Discussions 10.30 (1.5 hrs) All (working) Lunch 12.00 (30 min) All Discussions 12.30 (1.5 hrs) All Break 14.00 (15 min) All Wrap up and Next Steps 14.15 (30 min) ELEXON AOB 14.45 (15 min) All

slide-3
SLIDE 3

2

  • The Capacity Market seeks to provide a “regular retainer payment

to reliable forms of capacity (both demand and supply side), in return for such capacity being available when electricity supply is

  • squeezed. This will reduce the threat of blackouts due to

insufficient capacity on the system.”

  • Capacity Providers have four metering options to provide data to

the Settlement Agent:

a) HHDA provides SMRS registered metered data b) Bespoke (private wire) metering (policy in development) c) Additional BMUs d) STOR metering

What is the context for this metering

  • ption?
slide-4
SLIDE 4

3

  • EMR Consultation on Proposals for Implementation:

DSR metering option (a)

  • 579. The DSR capacity provider must notify the data collector (appointed by the

supplier) to pass the half hourly, non-aggregated BSC metered data for the relevant CMU component (and related meters on the same site if appropriate) to the settlement agent. This option is for either DSR, embedded generation that exports electricity to the network, or embedded generation which has a separate BSC meter.

  • Following DECC’s workshop in November 13:

“The DSR capacity provider must notify its Supplier, who will instruct its Half Hourly Data Aggregator to pass the half hourly, non-aggregated BSC metered data adjusted for Line Losses for the relevant CMU component to the settlement agent.”

DECC Policy

slide-5
SLIDE 5

4

“Consider if the ‘strawman DTC changes’ adequately deliver DECC’s policy, and if not, recommend a set of BSCP and DTC changes that do deliver DECC’s policy.” “Consider implementation approach and how best to meet DECC’s implementation timescales.”

Objectives of Workgroup

slide-6
SLIDE 6

5

  • In scope:
  • Strawman DTC changes document
  • DTC data flows
  • BSCP processes
  • BSC changes that do not impact DECC’s policy
  • Implementation considerations
  • Out of scope:
  • Policy – today is about the best way to do it
  • BSC changes that impact DECC’s policy
  • Use of the DTN to transmit data to the CM Settlement Agent
  • Strawman discussed at DECC’s November workshop

Scope

slide-7
SLIDE 7

6

Approach and Next Steps

Workgroup meeting to discuss items within scope

  • 26 March

Discussions from meetings with clear solution identified circulated to group for review

  • 2 April

Comments received from group

  • 9 April

Draft necessary document changes

  • 16 April

Document changes directed by Secretary of State.

  • Jul / Aug 2014

HHDA metering

  • ption

implemented

  • March 2015
slide-8
SLIDE 8

7

Strawman Proposal

2. Supplier(s)

  • 3. HHDA
  • 4. CM

Settlement Agent

Instruction to flag relevant MPANs Acceptance/rejection

  • f instruction

Flagged MPAN consumption data

  • 1. Capacity

Provider

Request to submit data via HHDA for CM Settlement Notification of MPANs needed for CM Settlement

EMR Entity BSC Entity Via DTN TBC Out of scope

Key

slide-9
SLIDE 9

8

  • For each entity we will consider:

3. What possible fixes are there for the possible problems? 4. What changes do we need to make to the strawman?

  • For each question we will spend 10 minutes as a group and 10

minutes as a room thinking and making notes on that question

Workshop Format

slide-10
SLIDE 10

9

  • considering purely what information is available, what are

the facts?

  • What items from the strawman are needed?
  • What information does the Supplier need to send to the HHDA?
  • When does the information need to be sent?
  • What documents are impacted?
slide-11
SLIDE 11

10

  • Black - logic applied to identifying reasons to be cautious and

conservative

  • What difficulties could the Supplier face?
  • What information is missing/ redundant from the proposed flow?

Suppliers

slide-12
SLIDE 12

11

– Alternatives, possibilities, new ideas, new concepts, improvements, options e address the items from the black hat?

  • How can we address the items from the black hat?
slide-13
SLIDE 13

12

– Thinking about thinking, next steps, summarising,

clarifying, precision, overview

  • Where are we now?
  • What changes do we need to make to the proposal?
slide-14
SLIDE 14

13

  • considering purely what information is available, what are

the facts?

  • What items from the strawman are needed?
  • What information does the HHDA need to receive?
  • What information does the HHDA need to send?
  • When is the information needed?
  • What documents are impacted?
slide-15
SLIDE 15

14

  • Black - logic applied to identifying reasons to be cautious and

conservative

  • What difficulties could the HHDA face?
  • What information is missing/ redundant from the proposed flow

HHDA

slide-16
SLIDE 16

15

– Alternatives, possibilities, new ideas, new concepts, improvements, options e address the items from the black hat?

  • How can we address the items from the black hat?
slide-17
SLIDE 17

16

– Thinking about thinking, next steps, summarising,

clarifying, precision, overview

  • Where are we now?
  • What changes do we need to make to the proposal?
slide-18
SLIDE 18

17

  • What information will Suppliers need from Capacity Providers?
  • How could this be provided?
  • When should this be provided?
  • 1. Capacity Provider
slide-19
SLIDE 19

18

  • 4. Capacity Market Settlement Agent
  • How should the Settlement Agent handle missing or unexpected

data from HHDAs?

slide-20
SLIDE 20

19

  • What happens next?

Next steps

slide-21