2010 Substations Committee Status Report
1
IEEE PES SUBSTATIONS COMMITTEE ANNUAL MEETING MONTREAL May 17 - - - PowerPoint PPT Presentation
IEEE PES SUBSTATIONS COMMITTEE ANNUAL MEETING MONTREAL May 17 - 20, 2010 2010 Substations Committee Status Report 1 SUBSTATIONS COMMITTEE OFFICERS (2009 2010) Chair Hermann J. Koch Siemens Vice Chair John D. Randolph Pacific
2010 Substations Committee Status Report
1
2010 Substations Committee Status Report
2
Chair
Vice Chair
Secretary
These are the only persons who have to respond to IEEE regarding the L50-S annual financial report.
2010 Substations Committee Status Report
3
2010 Substations Committee Status Report
4
Past Chair
Past2 Chair
Past3 Chair
Past4 Chair
2010 Substations Committee Status Report
5
2010 Substations Committee Status Report
6
Technical Council Standards Coordinating Committee
Representation to Emerging Technologies
2010 Substations Committee Status Report
7
IEEE-SA Review Committee (Rev Com) IEEE-SA Audit Committee (Aud Com) IEEE Standards Board
2010 Substations Committee Status Report
8
2010 Substations Committee Status Report
9
2010 Substations Committee Status Report
10
Content 1. INTRODUCTION 2. PURPOSE OF THE ORGANIZATION AND PROCEDURES MANUAL 3. SCOPE 4. ORGANIZATION 5. RESPONSIBILITIES 6. OFFICERS 7. MEMBERSHIP 8. TRANSACTIONS EDITOR 9. SUBCOMMITTEES 10. WORKING GROUPS 11. MEETINGS 12. VOTE 13. PROCEDURES 14. GENERATION OF IEEE STANDARDS 15. BALLOTING GROUP FOR A STANDARD 16. COMMUNICATIONS 17. TASK FORCE, WORKING GROUP, AND SUBCOMMITTEE PUBLICATIONS 18. INTERPRETATIONS 19. APPEAL IEEE POWER AND ENERGY SOCIETY SUBSTATIONS COMMITTEE ORGANIZATION AND PROCEDURES MANUAL Revision: April 2009
2010 Substations Committee Status Report
11
Transmission and Distribution Substations Design Subcommittee - D0 Transmission and Distribution Substations Operations Subcommittee - E0 Data Acquisition, Processing, and Control Systems Subcommittee - C0 High Voltage Power Electronics Stations Subcommittee - I0 Gas Insulated Substations Subcommittee - K0 Recognition & Awards Subcommittee - H0 Standards Subcommittee - S0 Working Groups Working Groups Working Groups Working Groups Working Groups Transaction Editor Secretary Vice Chair + TCPC Past Chairs Chair Substations Committee - A0 Administrative Subcommittee - B0 Meetings Subcommittee - M0 Transmission and Distribution Substations Design Subcommittee - D0 Transmission and Distribution Substations Operations Subcommittee - E0 Data Acquisition, Processing, and Control Systems Subcommittee - C0 High Voltage Power Electronics Stations Subcommittee - I0 Gas Insulated Substations Subcommittee - K0 Recognition & Awards Subcommittee - H0 Standards Subcommittee - S0 Working Groups Working Groups Working Groups Working Groups Working Groups Transaction Editor Secretary Vice Chair + TCPC Past Chairs Chair Substations Committee - A0 Administrative Subcommittee - B0 Transmission and Distribution Substations Design Subcommittee - D0 Transmission and Distribution Substations Operations Subcommittee - E0 Data Acquisition, Processing, and Control Systems Subcommittee - C0 High Voltage Power Electronics Stations Subcommittee - I0 Gas Insulated Substations Subcommittee - K0 Transmission and Distribution Substations Design Subcommittee - D0 Transmission and Distribution Substations Operations Subcommittee - E0 Data Acquisition, Processing, and Control Systems Subcommittee - C0 High Voltage Power Electronics Stations Subcommittee - I0 Gas Insulated Substations Subcommittee - K0 Recognition & Awards Subcommittee - H0 Standards Subcommittee - S0 Working Groups Working Groups Working Groups Working Groups Working Groups Working Groups Working Groups Working Groups Working Groups Working Groups Transaction Editor Secretary Vice Chair + TCPC Past Chairs Chair Substations Committee - A0 Administrative Subcommittee - B0 Meetings Subcommittee - M0
2010 Substations Committee Status Report
12
2010 Substations Committee Status Report
13
2010 Substations Committee Status Report
14
C0 to PSCC I0 to T&D Committee K0 to Switchgear Committee
2010 Substations Committee Status Report
15
WORKING GROUP C1 - SUBSTATION INTELLIGENT ELECTRONIC Sam Sciacca DEVICES (IED) CYBER SECURITY STANDARDS WORKING GROUP C2 - STANDARD ENVIRON & TESTING John Tengdin REQUIREMENTS FOR COMMUNICATIONS NETWORKING DEVICES IN ELECTRIC POWER SUBSTATIONS WORKING GROUP C3 - STANDARD FOR SCADA AND AUTOMATION Craig Preuss SYSTEMS WORKING GROUP C4 - TRIAL USE STANDARD FOR CYBER John Tengdin SECURITY OF SERIAL SCADA LINKS AND IEC REMOTE ACCESS WORKING GROUP C5 - STANDARD ELECTRICAL POWER SYSTEM John Tengdin DEVICE FUNCTION NUMBERS AND CONTACT DESIGNATIONS WORKING GROUP C6 - TRIAL USE STANDARD FOR A CRYPTO- Dave Whitehead GRAPHIC PROTOCOL FOR CYBER SECURITY OF SUBSTATION SERIAL LINKS WORKING GROUP C7 - PROFILE FOR PROTECTION AND Tim Tibbals AUTOMATION IEDs
2010 Substations Committee Status Report
16
WORKING GROUP C8 - RECOMMENDED PRACTICES FOR Michael Thesing NETWORK COMMUNICATIONS IN A SUBSTATION WORKING GROUP C9 - STANDARD COMMUNICATION DELIVERY John Tengdin TIME PERFORMANCE REQUIREMENTS FOR ELECTRIC POWER SUBSTATION AUTOMATION WORKING GROUP C10 - JOINT C10 AND PSRC H13 WG ON Sam Sciacca REQUIREMENT AND APPLICATION OF THE SUBSTATION CYBER SECURITY WORKING GROUP C11 - RECOMMENDED PRACTICE FOR DATA Lee Smith COMMUNICATIONS BETWEEN RTUs & IEDs IN A SUBSTATION WORKING GROUP C12 - DNP 3.0 STANDARD ENVIRONMENTAL Lee Smith AND TESTING REQUIREMENTS FOR COM-MUNI-CATION NET- WORKING DEVICES IN ELECTRIC POWER SUBSTATIONS WORKING GROUP C13 - STANDARD TEST METHOD OF USE IN THE NN EVALUATION OF MESSAGE COMMUNI-CATIONS BETWEEN INTELLIGENT ELECTRONIC DEVICES IN AN INTEGRATED SUBSTA- TION PROTECTION CONTROL, AND DATA ACQUISITION SYSTEM
2010 Substations Committee Status Report
17
WORKING GROUP D1 - GUIDE FOR RECOMMENDED ELECT CLEAR- Hamid Sharifnia ANCES & INSUL LEVELS IN AIR INSULATED ELECTRIC POWER SUBSTATIONS WORKING GROUP D2 (F2) – GUIDE FOR DESIGN & INSTALLATION Debra Longtin IN CABLE SYSTEMS IN SUBSTATIONS WORKING GROUP D3 - GUIDE FOR THE DESIGN OF SUBSTATIONS Hanna Abdallah BUS STRUCTURES WORKING GROUP D4 (F1) - RECOMMENDED PRACTICES FOR Erik Fujisaki SEISMIC DESIGN OF SUBSTATIONS WORKING GROUP D5 - GUIDE FOR DIRECT LIGHTNING STROKE Bob Nowell SHIELDING OF SUBSTATIONS WORKING GROUP D6 (F0b) – RECOMMENDED PRACTICE FOR THE Jean-B. Dastous DESIGN OF FLEXIBLE BUSWORK LOCATED IN SEISMICALLY ACTIVE AREAS WORKING GROUP D7 - GUIDE FOR SAFETY IN AC SUBSTATION Richard Keil GROUNDING WORKING GROUP D8 - GUIDE FOR DEVELOPMENT OF Arun Arora SPECIFICATIONS FOR TURNKEY SUBSTATION PROJECTS WORKING GROUP D9 - AC/DC SYSTEMS Hanna Abdallah
2010 Substations Committee Status Report
18
WORKING GROUP E1 (G2) - GUIDE FOR THE DESIGN, Diane Watkins CONSTRUCTION & OPERATION OF ELECTRIC POWER SUBSTATIONS FOR COMMUNITY ACCEPTANCE AND ENVIRONMENTAL COMPATIBILITY WORKING GROUP E2 (G2) – GUIDE FOR CONTAINMENT James Sosinski AND CONTROL OF OIL SPILLS IN SUBSTATIONS WORKING GROUP E3 (F3) - GUIDE FOR SUBSTATION FIRE Don Delcourt PROTECTION WORKING GROUP E4 (D4) - GUIDE FOR TEMPORARY PROTECTIVE Lane Garrett GROUNDING SYSTEMS USED IN SUBSTATIONS WORKING GROUP E4 - GUIDE FOR THE SAFE INSTALLATION OF Lane Garrett MOBILE SUBSTATION EQUIPMENT
2010 Substations Committee Status Report
19
WORKING GROUP E5 (G3) - GUIDE FOR ANIMAL DETERRENTS Mike Bio FOR ELECTRIC POWE SUPPLY STATIONS WORKING GROUP E6 (D6) - GUIDE FOR MEASURING EARTH Dennis DeCosta RESISTIVITY, GROUND IMPEDANCE, AND EARTH SURFACE POTENTIALS OF A GROUNDING SYSTEM WORKING GROUP E7 (G3) - GUIDE FOR ELECTRIC POWER Hassein Bashirian SUBSTATION PHYSICAL AND ELECTRONIC SECURITY WORKING GROUP E9 (D9) - STD FOR QUALIFYING PERMANENT David Kelley CONNECTIONS USED IN ELECTRICAL POWER SUBSTATION GROUNDING
2010 Substations Committee Status Report
20
WORKING GROUP I1 - RECOMMENDED PRACTICE TO TEST George Karady PROCEDURE FOR HVDC THYRISTOR VALVES WORKING GROUP I2 - RECOMMENDED PRACTICE FOR George Karady SPECIFYING THYRISTOR CONTROLLED SERIES CAPS WORKING GROUP I4 - GUIDE FOR THE FUNCTIONAL SPECIFICATION Heinz Tyll OF TRANSMISSION STATIC VAR COMPEN-SATORS WORKING GROUP I5 - GUIDE FOR THE EVALUATION OF THE Ben Mehraban RELIABILITY OF HVDC CONVERTER STATIONS WORKING GROUP I8 - GUIDE FOR CONTROL ARCHITECTURE FOR Nari Hingorani HIGH POWER EECTRONIC USED IN ELEC-TRICAL POWER TRANS. &
2010 Substations Committee Status Report
21
WORKING GROUP K1 - STANDARD FOR HIGH VOLTAGE John Brunke GAS-INSULATED SUBSTATIONS, RATED ABOVE 52 KV WORKING GROUP K2- TUTORIALS AND PANEL SESSIONS Hermann Koch GIS/GIL/SF6 WORKING GROUP K3 – GUIDE FOR APPLICATION OF George Becker GAS-INSULATED SUBSTATIONS (GIS) 1 KV UP TO 52 KV WORKING GROUP K4 – GUIDE FOR SULPHUR HEXAFLUORIDE (SF6) Luke van der Zel GAS HANDLING FOR HIGH VOLTAGE EQUIPMENT WORKING GROUP K5 – GIL APPLICA-TION GUIDE Darin Penner WORKING GROUP K6 – GIS USER GROUP Venkatesh Minisandram
2010 Substations Committee Status Report
22
WORKING GROUP K7 - REVISION OF STANDARD FOR BUSHING Devki Sharma FOR HIGH VOLTAGE (OVER 1000 V AC) CIRCUIT BREAKERS AND GAS INSULATD SWITCHGEAR WORKING GROUP K8 - GUIDE FOR MOISTURE MEASUREMENT David Giegel AND CONTROL IN SF6 GAS INSULATED EQUIPMENT WORKING GROUP K9 – RECOMMENDED PRACTICE FOR THE Arnaud Ficheux INTERFACE OF NEW GIS EQUIPMENT IN EXISTING GIS’S WORKING GROUP K11 – GUIDE FOR GIS Dave Solhtalab WORKING GROUP K 12 –GUIDE TO SPECIFICATION FOR GIS George Becker ELECTRIC POWER SUBSTATION EQUIPMENT
2010 Substations Committee Status Report
23
COMMITTEE MEMBER:
LIFE COMMITTEE MEMBER:
COMMITTEE MEMBER-CORRESPONDING: 8
ACTIVE PARTICIPANT:
INTERESTED INDIVIDUAL:
TOTALS:
2010 Substations Committee Status Report
24
50 100 150 200 250 300 350 400 450 500 2008 2009 2010 COMMITTEE MEMBER LIFE COMMITTEE MEMBER COMMITTEE MEMBER- CORRESP. ACTIVE PARTICIPANT INTERESTED INDIVIDUAL
2010 Substations Committee Status Report
25
100 200 300 400 500 600 700 800 900 1000 2008 2009 2010 TOTAL
2010 Substations Committee Status Report
26
Local organization committee:
GE Infra, Energy radoslav.barac@ge.com
2010 Substations Committee Status Report
27