IEEE PES SUBSTATIONS COMMITTEE ANNUAL MEETING MONTREAL May 17 - 20, 2010 2010 Substations Committee Status Report 1 SUBSTATIONS COMMITTEE OFFICERS (2009 2010) Chair Hermann J. Koch Siemens Vice Chair John D. Randolph Pacific


slide-1
SLIDE 1

2010 Substations Committee Status Report

1

IEEE PES SUBSTATIONS COMMITTEE ANNUAL MEETING MONTREAL May 17 - 20, 2010

slide-2
SLIDE 2

2010 Substations Committee Status Report

2

SUBSTATIONS COMMITTEE OFFICERS (2009 – 2010)

Chair

Hermann J. Koch Siemens

Vice Chair

John D. Randolph Pacific Gas and Electric

Secretary

Mike Dood Schweitzer Engineering Laboratories

These are the only persons who have to respond to IEEE regarding the L50-S annual financial report.

slide-3
SLIDE 3

2010 Substations Committee Status Report

3

NEW SUBSTATIONS COMMITTEE OFFICER in 2010 Secretary for 2011-2012

Mark Etter

ABB Inc. 3 Independence Way Suite 206 Princeton, NJ 08540 tel (732) 932-6250 fax (732) 932-6272 markus.etter@us.abb.com

slide-4
SLIDE 4

2010 Substations Committee Status Report

4

SUBSTATIONS COMMITTEE PAST CHAIRMEN

Past Chair

  • R. S. (Bob) Nowell

Georgia Power Company

Past2 Chair

Hanna E. Abdalla Power Engineers

Past3 Chair

  • A. P. (Sakis) Meliopoulos

Georgia Tech

Past4 Chair

John D. McDonald GE Energy (IEEE Division VII Director)

slide-5
SLIDE 5

2010 Substations Committee Status Report

5

POWER & ENERGY SOCIETY COMMITTEE REPRESENTATION

John McDonald Power & Energy Editorial Board

  • R. S. (Bob) Nowell

Technical Council Organization and Procedures Committee George Karady Transactions on Power Delivery Editorial Board John Randolph Technical Council Technical Sessions Committee Hubert Bilodeau Technical Council Awards Committee PES Awards Committee

slide-6
SLIDE 6

2010 Substations Committee Status Report

6

Hamid Sharifnia

Technical Council Standards Coordinating Committee

Wayne Litzenberger

Representation to Emerging Technologies

Jack Christofersen Gary Engmann Bruce Dietzman Ken White C2 National Electrical Safety Code Subcommittee 3 - Electric Supply Stations Hanna E. Abdallah US National Committee of CIGRE Study Committee B3- Substations

POWER & ENERGY SOCIETY COMMITTEE REPRESENTATION .... continued

slide-7
SLIDE 7

2010 Substations Committee Status Report

7

2010 IEEE-SA APPOINTMENTS

IEEE-SA Review Committee (Rev Com) IEEE-SA Audit Committee (Aud Com) IEEE Standards Board

Sam Sciacca

CEO CG Automation 92 Cogwheel Lane Seymour, CT 06483 203-888-3002 ext 301 203-888-7640 (fax)

samuel.sciacca@cgglobal.com

slide-8
SLIDE 8

2010 Substations Committee Status Report

8

WEB SITE http://ewh.ieee.org/cmte/substations/

Webmaster: Chuck Haahr chaahr@segainc.com

slide-9
SLIDE 9

2010 Substations Committee Status Report

9

SUBSTATIONS SUBCOMMITTEE BROCHURE

Updated Status 2010-05-06

slide-10
SLIDE 10

2010 Substations Committee Status Report

10

SUBSTATIONS COMMITTEE ORGANIZATION & PROCEDURE MANUAL

Content 1. INTRODUCTION 2. PURPOSE OF THE ORGANIZATION AND PROCEDURES MANUAL 3. SCOPE 4. ORGANIZATION 5. RESPONSIBILITIES 6. OFFICERS 7. MEMBERSHIP 8. TRANSACTIONS EDITOR 9. SUBCOMMITTEES 10. WORKING GROUPS 11. MEETINGS 12. VOTE 13. PROCEDURES 14. GENERATION OF IEEE STANDARDS 15. BALLOTING GROUP FOR A STANDARD 16. COMMUNICATIONS 17. TASK FORCE, WORKING GROUP, AND SUBCOMMITTEE PUBLICATIONS 18. INTERPRETATIONS 19. APPEAL IEEE POWER AND ENERGY SOCIETY SUBSTATIONS COMMITTEE ORGANIZATION AND PROCEDURES MANUAL Revision: April 2009

Has been revised by Bob Nowell and will be voted by B0 this meeting!

slide-11
SLIDE 11

2010 Substations Committee Status Report

11

SUBSTATIONS ORGANIZATION

Transmission and Distribution Substations Design Subcommittee - D0 Transmission and Distribution Substations Operations Subcommittee - E0 Data Acquisition, Processing, and Control Systems Subcommittee - C0 High Voltage Power Electronics Stations Subcommittee - I0 Gas Insulated Substations Subcommittee - K0 Recognition & Awards Subcommittee - H0 Standards Subcommittee - S0 Working Groups Working Groups Working Groups Working Groups Working Groups Transaction Editor Secretary Vice Chair + TCPC Past Chairs Chair Substations Committee - A0 Administrative Subcommittee - B0 Meetings Subcommittee - M0 Transmission and Distribution Substations Design Subcommittee - D0 Transmission and Distribution Substations Operations Subcommittee - E0 Data Acquisition, Processing, and Control Systems Subcommittee - C0 High Voltage Power Electronics Stations Subcommittee - I0 Gas Insulated Substations Subcommittee - K0 Recognition & Awards Subcommittee - H0 Standards Subcommittee - S0 Working Groups Working Groups Working Groups Working Groups Working Groups Transaction Editor Secretary Vice Chair + TCPC Past Chairs Chair Substations Committee - A0 Administrative Subcommittee - B0 Transmission and Distribution Substations Design Subcommittee - D0 Transmission and Distribution Substations Operations Subcommittee - E0 Data Acquisition, Processing, and Control Systems Subcommittee - C0 High Voltage Power Electronics Stations Subcommittee - I0 Gas Insulated Substations Subcommittee - K0 Transmission and Distribution Substations Design Subcommittee - D0 Transmission and Distribution Substations Operations Subcommittee - E0 Data Acquisition, Processing, and Control Systems Subcommittee - C0 High Voltage Power Electronics Stations Subcommittee - I0 Gas Insulated Substations Subcommittee - K0 Recognition & Awards Subcommittee - H0 Standards Subcommittee - S0 Working Groups Working Groups Working Groups Working Groups Working Groups Working Groups Working Groups Working Groups Working Groups Working Groups Transaction Editor Secretary Vice Chair + TCPC Past Chairs Chair Substations Committee - A0 Administrative Subcommittee - B0 Meetings Subcommittee - M0

slide-12
SLIDE 12

2010 Substations Committee Status Report

12

SUBSTATIONS ADMINISTRATIVE SUBCOMMITTEES

Chair

  • B0
  • ADMINISTRATIVE SUBCOMMITTEE

Hermann Koch

  • H0
  • RECOGNITION & AWARDS

Hubert Bilodeau SUBCOMMITTEE

  • M0 - MEETINGS SUBCOMMITTEE

Diane Watkins

  • S0
  • STANDARDS SUBCOMMITTEE

Hamid Sharifnia

slide-13
SLIDE 13

2010 Substations Committee Status Report

13

SUBSTATIONS SUBCOMMITTEES

Chair

  • C0
  • DATA ACQUISITION, PROCESSING, AND

Craig Preuss CONTROL SYSTEMS SUBCOMMITTEE

  • D0
  • TRANSMISSION AND DISTRIBUTION

Rich Keil SUBSTATIONS DESIGN SUBCOMMITTEE

  • E0
  • TRANSMISSION AND DISTRIBUTION

Randy Clelland SUBSTATIONS OPERATIONS SUBCOMMITTEe

  • I0
  • HIGH VOLTAGE POWER ELECTRONICS

Chris Horwill STATIONS SUBCOMMITTEE

  • K0
  • GAS INSULATED SUBSTATIONS

Arun Arora SUBCOMMITTEE

slide-14
SLIDE 14

2010 Substations Committee Status Report

14

ADMINISTRATIVE SUBCOMMITTEE - B0

WG B2 – LIAISON Arun Arora Report about

C0 to PSCC I0 to T&D Committee K0 to Switchgear Committee

WG B4 - FELLOW John Tengdin Promote and support nominations for Substations Engineers for IEEE Fellow Member Status

slide-15
SLIDE 15

2010 Substations Committee Status Report

15

DATA ACQUISITION, PROCESSING, AND CONTROL SYSTEMS SUBCOMMITTEE - C0

WORKING GROUP C1 - SUBSTATION INTELLIGENT ELECTRONIC Sam Sciacca DEVICES (IED) CYBER SECURITY STANDARDS WORKING GROUP C2 - STANDARD ENVIRON & TESTING John Tengdin REQUIREMENTS FOR COMMUNICATIONS NETWORKING DEVICES IN ELECTRIC POWER SUBSTATIONS WORKING GROUP C3 - STANDARD FOR SCADA AND AUTOMATION Craig Preuss SYSTEMS WORKING GROUP C4 - TRIAL USE STANDARD FOR CYBER John Tengdin SECURITY OF SERIAL SCADA LINKS AND IEC REMOTE ACCESS WORKING GROUP C5 - STANDARD ELECTRICAL POWER SYSTEM John Tengdin DEVICE FUNCTION NUMBERS AND CONTACT DESIGNATIONS WORKING GROUP C6 - TRIAL USE STANDARD FOR A CRYPTO- Dave Whitehead GRAPHIC PROTOCOL FOR CYBER SECURITY OF SUBSTATION SERIAL LINKS WORKING GROUP C7 - PROFILE FOR PROTECTION AND Tim Tibbals AUTOMATION IEDs

slide-16
SLIDE 16

2010 Substations Committee Status Report

16

DATA ACQUISITION, PROCESSING, AND CONTROL SYSTEMS SUBCOMMITTEE - C0

WORKING GROUP C8 - RECOMMENDED PRACTICES FOR Michael Thesing NETWORK COMMUNICATIONS IN A SUBSTATION WORKING GROUP C9 - STANDARD COMMUNICATION DELIVERY John Tengdin TIME PERFORMANCE REQUIREMENTS FOR ELECTRIC POWER SUBSTATION AUTOMATION WORKING GROUP C10 - JOINT C10 AND PSRC H13 WG ON Sam Sciacca REQUIREMENT AND APPLICATION OF THE SUBSTATION CYBER SECURITY WORKING GROUP C11 - RECOMMENDED PRACTICE FOR DATA Lee Smith COMMUNICATIONS BETWEEN RTUs & IEDs IN A SUBSTATION WORKING GROUP C12 - DNP 3.0 STANDARD ENVIRONMENTAL Lee Smith AND TESTING REQUIREMENTS FOR COM-MUNI-CATION NET- WORKING DEVICES IN ELECTRIC POWER SUBSTATIONS WORKING GROUP C13 - STANDARD TEST METHOD OF USE IN THE NN EVALUATION OF MESSAGE COMMUNI-CATIONS BETWEEN INTELLIGENT ELECTRONIC DEVICES IN AN INTEGRATED SUBSTA- TION PROTECTION CONTROL, AND DATA ACQUISITION SYSTEM

slide-17
SLIDE 17

2010 Substations Committee Status Report

17

TRANSMISSION AND DISTRIBUTION SUB- STATIONS DESIGN SUBCOMMITTEE - D0

WORKING GROUP D1 - GUIDE FOR RECOMMENDED ELECT CLEAR- Hamid Sharifnia ANCES & INSUL LEVELS IN AIR INSULATED ELECTRIC POWER SUBSTATIONS WORKING GROUP D2 (F2) – GUIDE FOR DESIGN & INSTALLATION Debra Longtin IN CABLE SYSTEMS IN SUBSTATIONS WORKING GROUP D3 - GUIDE FOR THE DESIGN OF SUBSTATIONS Hanna Abdallah BUS STRUCTURES WORKING GROUP D4 (F1) - RECOMMENDED PRACTICES FOR Erik Fujisaki SEISMIC DESIGN OF SUBSTATIONS WORKING GROUP D5 - GUIDE FOR DIRECT LIGHTNING STROKE Bob Nowell SHIELDING OF SUBSTATIONS WORKING GROUP D6 (F0b) – RECOMMENDED PRACTICE FOR THE Jean-B. Dastous DESIGN OF FLEXIBLE BUSWORK LOCATED IN SEISMICALLY ACTIVE AREAS WORKING GROUP D7 - GUIDE FOR SAFETY IN AC SUBSTATION Richard Keil GROUNDING WORKING GROUP D8 - GUIDE FOR DEVELOPMENT OF Arun Arora SPECIFICATIONS FOR TURNKEY SUBSTATION PROJECTS WORKING GROUP D9 - AC/DC SYSTEMS Hanna Abdallah

slide-18
SLIDE 18

2010 Substations Committee Status Report

18

TRANSMISSION AND DISTRIBUTION SUBSTA- TIONS OPERATIONS SUBCOMMITTEE - E0

WORKING GROUP E1 (G2) - GUIDE FOR THE DESIGN, Diane Watkins CONSTRUCTION & OPERATION OF ELECTRIC POWER SUBSTATIONS FOR COMMUNITY ACCEPTANCE AND ENVIRONMENTAL COMPATIBILITY WORKING GROUP E2 (G2) – GUIDE FOR CONTAINMENT James Sosinski AND CONTROL OF OIL SPILLS IN SUBSTATIONS WORKING GROUP E3 (F3) - GUIDE FOR SUBSTATION FIRE Don Delcourt PROTECTION WORKING GROUP E4 (D4) - GUIDE FOR TEMPORARY PROTECTIVE Lane Garrett GROUNDING SYSTEMS USED IN SUBSTATIONS WORKING GROUP E4 - GUIDE FOR THE SAFE INSTALLATION OF Lane Garrett MOBILE SUBSTATION EQUIPMENT

slide-19
SLIDE 19

2010 Substations Committee Status Report

19

TRANSMISSION AND DISTRIBUTION SUBSTA- TIONS OPERATIONS SUBCOMMITTEE - E0

WORKING GROUP E5 (G3) - GUIDE FOR ANIMAL DETERRENTS Mike Bio FOR ELECTRIC POWE SUPPLY STATIONS WORKING GROUP E6 (D6) - GUIDE FOR MEASURING EARTH Dennis DeCosta RESISTIVITY, GROUND IMPEDANCE, AND EARTH SURFACE POTENTIALS OF A GROUNDING SYSTEM WORKING GROUP E7 (G3) - GUIDE FOR ELECTRIC POWER Hassein Bashirian SUBSTATION PHYSICAL AND ELECTRONIC SECURITY WORKING GROUP E9 (D9) - STD FOR QUALIFYING PERMANENT David Kelley CONNECTIONS USED IN ELECTRICAL POWER SUBSTATION GROUNDING

slide-20
SLIDE 20

2010 Substations Committee Status Report

20

HIGH VOLTAGE POWER ELECTRONICS STATIONS SUBCOMMITTEE - I0

WORKING GROUP I1 - RECOMMENDED PRACTICE TO TEST George Karady PROCEDURE FOR HVDC THYRISTOR VALVES WORKING GROUP I2 - RECOMMENDED PRACTICE FOR George Karady SPECIFYING THYRISTOR CONTROLLED SERIES CAPS WORKING GROUP I4 - GUIDE FOR THE FUNCTIONAL SPECIFICATION Heinz Tyll OF TRANSMISSION STATIC VAR COMPEN-SATORS WORKING GROUP I5 - GUIDE FOR THE EVALUATION OF THE Ben Mehraban RELIABILITY OF HVDC CONVERTER STATIONS WORKING GROUP I8 - GUIDE FOR CONTROL ARCHITECTURE FOR Nari Hingorani HIGH POWER EECTRONIC USED IN ELEC-TRICAL POWER TRANS. &

  • DISTR. SYSTEMS
slide-21
SLIDE 21

2010 Substations Committee Status Report

21

GAS INSULATED SUBSTATIONS SUBCOMMITTEE - K0

WORKING GROUP K1 - STANDARD FOR HIGH VOLTAGE John Brunke GAS-INSULATED SUBSTATIONS, RATED ABOVE 52 KV WORKING GROUP K2- TUTORIALS AND PANEL SESSIONS Hermann Koch GIS/GIL/SF6 WORKING GROUP K3 – GUIDE FOR APPLICATION OF George Becker GAS-INSULATED SUBSTATIONS (GIS) 1 KV UP TO 52 KV WORKING GROUP K4 – GUIDE FOR SULPHUR HEXAFLUORIDE (SF6) Luke van der Zel GAS HANDLING FOR HIGH VOLTAGE EQUIPMENT WORKING GROUP K5 – GIL APPLICA-TION GUIDE Darin Penner WORKING GROUP K6 – GIS USER GROUP Venkatesh Minisandram

slide-22
SLIDE 22

2010 Substations Committee Status Report

22

GAS INSULATED SUBSTATIONS SUBCOMMITTEE - K0

WORKING GROUP K7 - REVISION OF STANDARD FOR BUSHING Devki Sharma FOR HIGH VOLTAGE (OVER 1000 V AC) CIRCUIT BREAKERS AND GAS INSULATD SWITCHGEAR WORKING GROUP K8 - GUIDE FOR MOISTURE MEASUREMENT David Giegel AND CONTROL IN SF6 GAS INSULATED EQUIPMENT WORKING GROUP K9 – RECOMMENDED PRACTICE FOR THE Arnaud Ficheux INTERFACE OF NEW GIS EQUIPMENT IN EXISTING GIS’S WORKING GROUP K11 – GUIDE FOR GIS Dave Solhtalab WORKING GROUP K 12 –GUIDE TO SPECIFICATION FOR GIS George Becker ELECTRIC POWER SUBSTATION EQUIPMENT

slide-23
SLIDE 23

2010 Substations Committee Status Report

23

MEMBERSHIP TYPE COMPOSITION Status 2010 (2009)

COMMITTEE MEMBER:

80 (76)

LIFE COMMITTEE MEMBER:

7 (5)

COMMITTEE MEMBER-CORRESPONDING: 8

(8)

ACTIVE PARTICIPANT:

334 (358)

INTERESTED INDIVIDUAL:

439 (381)

TOTALS:

871 (828)

slide-24
SLIDE 24

2010 Substations Committee Status Report

24

WHO WE ARE IN SUBSTATIONS?

50 100 150 200 250 300 350 400 450 500 2008 2009 2010 COMMITTEE MEMBER LIFE COMMITTEE MEMBER COMMITTEE MEMBER- CORRESP. ACTIVE PARTICIPANT INTERESTED INDIVIDUAL

slide-25
SLIDE 25

2010 Substations Committee Status Report

25

TOTAL MEMBERSHIP DEVELOPMENT

100 200 300 400 500 600 700 800 900 1000 2008 2009 2010 TOTAL

slide-26
SLIDE 26

2010 Substations Committee Status Report

26

NEXT SUBSTATIONS MEETING 2011 CHICAGO

Joint meeting of

  • IEEE Substations Committee

and

  • CIGRE B3 Substations Study Committee
  • 15. - 19. May 2011

Chicago, IL, USA

Local organization committee:

Radoslav Barac

GE Infra, Energy radoslav.barac@ge.com

slide-27
SLIDE 27

2010 Substations Committee Status Report

27

WHAT EACH OF US EXPECT FROM SUBSTATIONS COMMITTEE To be involved in Substation Engineering! To meet colleagues and exchange knowledge! To contribute to standards, guides, tutorials, panels and discussions! To volunteer to leading positions!

Substations Committee Welcomes You! Have a nice week in Montreal!