US US 101/Br /Broadw oadway y In Inter ercha hang nge e Reconstr onstruct uction ion Project ject March 7, 2013 Program Outline Overview Stage Construction Aesthetics and Landscaping Project Update 2 1 Project


slide-1
SLIDE 1

1

US US 101/Br /Broadw

  • adway

y In Inter ercha hang nge e Reconstr

  • nstruct

uction ion Project ject

March 7, 2013

2

  • Overview
  • Stage Construction
  • Aesthetics and Landscaping
  • Project Update

Program Outline

slide-2
SLIDE 2

2

Project Description

  • Improve existing circuitous movements
  • Accommodate future traffic growth
  • Improve southbound US 101 ramps
  • Increase bicyclist and pedestrian access

3

Existing Condition 19-legged Unconventional Interchange

Hyatt Hotel Auto Dealerships San Francisco Bay Crowne Plaza Holiday Inn Express From Here To Here From Here To Here To Here From Here

4

slide-3
SLIDE 3

3

Project Features

To Here To Here From Here To Here From Here From Here

5

2011

Construction

2014 Year

Design and R/W acquisition Environmental

2012 2013 Environmental Clearance (Mar 2011) 2010 2009 2008

Project Phases and Schedule

2015 2017 2016 100% Design Submittal (we are here)

6

slide-4
SLIDE 4

4

Environmental Phase $ 3 million Design Phase $ 8 million Right of Way & Utility $ 11 million Construction $ 58 million Total $ 80 million

Project Cost Estimate

7

Need Need Upda Updated ted Plan Plan

8

Interchange Project

slide-5
SLIDE 5

5

Existing Configuration

CROWNE PLAZA HOTEL

US-101

HOLIDAY INN HOTEL HYATT REGENCY HOTEL AUDI AUTO DEALERSHIP BAYSIDE PARK

9

New Configuration

US-101

CROWNE PLAZA HOTEL

Easton Creek box culvert extension Existing PG&E transmission line towers New Broadway OC structure New SB On-ramp Bridge structure Existing POC structure

HYATT REGENCY HOTEL AUDI AUTO DEALERSHIP HOLIDAY INN HOTEL BAYSIDE PARK

10

slide-6
SLIDE 6

6

Stage Construction Concept

Stage 1: Phase 1: US-101 mainline widening; northbound on-ramp (partial) Phase 2: Broadway overcrossing structure construction, Southbound off ramp partial Stage 2: Phase 1: Broadway construction west of US-101, Rollins Rd. partial Phase 2: Rollins Rd. Overlay Stage 3: Phase 1: Broadway and Bayshore widening construction east of US-101, southbound on- ramp construction, Pedestrian overcrossing access modification west of US-101 Phase 1B: Utility Relocation in Bayshore widening area Phase 2: Overlay Bayshore and northbound ramps intersection, widen Bayshore north of intersection Stage 4: Phase 1: Bayshore Hwy/Airport Blvd construction Phase 2: Crowne Plaza driveway Stage 5: Phase 1: NB off-ramp construction, Crowne Plaza driveway Phase 2: Mainline grind and overlay Phase 3: Striping entire project area

11 12

slide-7
SLIDE 7

7

13 14

slide-8
SLIDE 8

8

15 16

slide-9
SLIDE 9

9

  • Jan. 2013: 100% Submittal (completed)

April 2013: Final Submittal to Caltrans District May 2013: District Submittal to Caltrans HQ

  • Oct. 2013: Certify Right of Way
  • Oct. 2013: Ready To List

April 2014: Bid Opening May 2014: Begin Construction Spring 2017: Construction Completion

17

Key Milestones

18

Questions?