Independent Independent Fire Hazard Management Fire Hazard Management Consultants Consultants Industry standards Industry standards LASTFIRE LASTFIRE Initially at Gold Command Escorted to Bronze Foam minimum requirements Foam
Independent Independent Fire Hazard Management Fire Hazard Management Consultants Consultants
Industry standards Industry standards
LASTFIRE LASTFIRE
Initially at Gold Command Escorted to Bronze Foam – minimum requirements Foam sources Foam application
LASTFIRE LASTFIRE
Large Atmospheric Storage Tank Fires Large Atmospheric Storage Tank Fires Large Atmospheric Storage Tank Fires
An industry consortium of international oil companies reviewing risks associated with storage tank fires An industry consortium of international oil An industry consortium of international oil companies reviewing risks associated with companies reviewing risks associated with storage tank fires storage tank fires
Objectives of original study Objectives of original study
- Determine current levels of risk
Determine current levels of risk
- Establish Design & Operational
Establish Design & Operational Practice & make knowledge Practice & make knowledge available throughout industry available throughout industry
- Establish techniques to
Establish techniques to determine site determine site-
- specific levels of
specific levels of risk and identify appropriate & risk and identify appropriate & cost cost-
- effective risk reduction
effective risk reduction measures measures
LASTFIRE LASTFIRE
Objectives of update study Objectives of update study
To continue To continue LASTFIRE’s LASTFIRE’s role as role as the established recognised the established recognised international oil companies forum international oil companies forum
- n best practices of
- n best practices of
Fire Hazard Management Fire Hazard Management
- f Storage Tanks
- f Storage Tanks
LASTFIRE LASTFIRE
Scope
Review of incidents
Update database on open top floaters
Extend database to fixed roof and internal floaters
Assess current practices and latest developments in risk reduction measures
Detection systems Foam systems Major incident response systems Tank / seal constructions
Practical research
Boilovers Vapour measurement in internal floating roof tanks
Become industry focal point / forum
Scope
Review of incidents
Update database on open top floaters
Extend database to fixed roof and internal floaters
Assess current practices and latest developments in risk reduction measures
Detection systems Foam systems Major incident response systems Tank / seal constructions
Practical research
Boilovers Vapour measurement in internal floating roof tanks
Become industry focal point / forum
LASTFIRE LASTFIRE
Tank Fire Foam Application Options Tank Fire Foam Application Options
Tank Fire Foam Application Options Tank Fire Foam Application Options
Do you want to put it out?
Full Surface Fire Response Full Surface Fire Response Full Surface Fire Response
Pump-out and Controlled Burndown Pump-out and Controlled Burndown
Pump-out and Controlled Burndown
Example
- Shell, New Jersey
Pump Pump-
- out and Controlled
- ut and Controlled Burndown
Burndown
Example Example
- Shell, New Jersey
Shell, New Jersey
Note: Note: Cooling monitors only Cooling monitors only
Note tank height!!! Note tank height!!!
Pump-out and Controlled Burndown
Considerations
- Smoke
Pump Pump-
- out and Controlled
- ut and Controlled Burndown
Burndown
Considerations Considerations
- Smoke
Smoke
Pump-out and Controlled Burndown
Considerations
- Smoke
Pump Pump-
- out and Controlled
- ut and Controlled Burndown
Burndown
Considerations Considerations
- Smoke
Smoke
- Public Image
- Incident Duration
- Pump out capability
- Spare tankage
- Flow rates
- Exposure Protection
- Requirements vary with time
- Boilover Potential
- Prior Acceptance by Authorities
- Public Image
Public Image
- Incident Duration
Incident Duration
- Pump out capability
Pump out capability
- Spare
Spare tankage tankage
- Flow rates
Flow rates
- Exposure Protection
Exposure Protection
- Requirements vary with time
Requirements vary with time
- Boilover Potential
Boilover Potential
- Prior Acceptance by Authorities
Prior Acceptance by Authorities
Monitors Monitors Tank Fire Foam Application Options Tank Fire Foam Application Options Systems Systems
Full Surface Foam System Full Surface Foam System
Full Surface Fire Response Full Surface Fire Response Full Surface Fire Response
Full Surface Foam System
Example
- OMV, Austria
Full Surface Foam System Full Surface Foam System
Example Example
- OMV, Austria
OMV, Austria
Full Surface Foam System
Considerations
- Manning Exposure Minimised
- Response Time Minimised
- Cost
- System Maintenance / Testing
- Reduced Flow Rates
- Foam Flow Issues if Tank > 60m
Full Surface Foam System Full Surface Foam System
Considerations Considerations
- Manning Exposure
Manning Exposure Minimised Minimised
- Response Time
Response Time Minimised Minimised
- Cost
Cost
- System Maintenance / Testing
System Maintenance / Testing
- Reduced Flow Rates
Reduced Flow Rates
- Foam Flow Issues if Tank > 60m
Foam Flow Issues if Tank > 60m
Full Surface Fire Response Full Surface Fire Response Full Surface Fire Response
Monitor Application Monitor Application
Monitor Attack Monitor Attack Monitor Attack
Small tanks (NFPA <~10m) Can use handlines
Monitor Attack Monitor Attack Monitor Attack
Examples
- Sunoco, Sarnia, Canada
- Orion, USA
Examples Examples
- Sunoco,
Sunoco, Sarnia Sarnia, Canada , Canada
- Orion, USA
Orion, USA
Monitor attack started Monitor attack started
83m diameter Gasoline with MTBE Fire 83m diameter Gasoline with MTBE Fire Norco Fire, June 2001 Norco Fire, June 2001
General industry trend: Response shifting to large capacity monitors A designed, well engineered package Not just and item of equipment!
Typical Russian equipment
Tank Fire Exercise and Demonstration Tank Fire Exercise and Demonstration
First involvement? First involvement? What did I think about the plan to ignite a 40m diameter tank in the middle of an
- perating refinery and adjacent to other
“live” tanks? What did I think about the plan to ignite a 40m diameter tank in the middle of an
- perating refinery and adjacent to other
“live” tanks? “I don’t know whether you are brave or crazy” “I don’t know whether you are brave or crazy”
Test Parameters Test Parameters Tank Diameter 42 m Surface Area 1385 m2 Total application rate ~10,000 lpm Solution rate 7.2 lpm/m2 EN* rate for tank fire 10 lpm/m2 EN* Run time 60 mins
*Draft and dependent on foam quality
Tank Diameter 42 m Surface Area 1385 m2 Total application rate ~10,000 lpm Solution rate 7.2 lpm/m2 EN* rate for tank fire 10 lpm/m2 EN* Run time 60 mins
*Draft and dependent on foam quality
Comparison with real incident Comparison with real incident Test Test Incident Incident Preburn Preburn Fuel Depth Fuel Depth Response Time Response Time 2-3mins 2-3mins ~hours ~hours ~metres ~metres Distortion Distortion ~30mm ~30mm Immediate Immediate ~hours ~hours Fuel Fuel Diesel Diesel Crude? Crude? Care required with drawing too many direct conclusions Care required with drawing too many direct conclusions
However… Valuable lessons to learn!! However… Valuable lessons to learn!! Deployment logistics Large water flow requirement Foam flow (100 lpm if 1% ) Radiant heat Deployment logistics Large water flow requirement Foam flow (100 lpm if 1% ) Radiant heat
Test Incident 2004
However… Valuable lessons to learn!! However… Valuable lessons to learn!! Deployment logistics Large water flow requirement Foam flow (100 lpm if 1% ) Radiant heat Deployment logistics Large water flow requirement Foam flow (100 lpm if 1% ) Radiant heat
It is possible!!! It is possible!!!
Good planning Good equipment Good training Competent personnel Crude? Good planning Good equipment Good training Competent personnel Crude?
Monitor throw/height Smoke plume Monitor throw/height Smoke plume
Maybe time dependent Maybe time dependent
Monitor Attack Monitor Attack Monitor Attack
Scenes from commissioning trials Scenes Scenes from from commissioning trials commissioning trials
Monitor Application Monitor Application
Beware of range claims! Beware of range claims!
Height is important Height is important
Monitor Application - Considerations Monitor Application - Considerations
- Tank Size
- NFPA Standards suggest 20m max (EN will
go to 60m+)
- Much more possible in practice
- Manning Levels
- Large tank incidents involve >100 people
- Stream Range / Height
- Bund access may be required
- Wind direction / strength
- Tank Size
Tank Size
- NFPA
NFPA Standards suggest 20m max Standards suggest 20m max (EN will (EN will go to 60m+) go to 60m+)
- Much more possible in practice
Much more possible in practice
- Manning Levels
Manning Levels
- Large tank incidents involve >100 people
Large tank incidents involve >100 people
- Stream Range / Height
Stream Range / Height
- Bund access may be required
Bund access may be required
- Wind direction / strength
Wind direction / strength
Slide 1 of 2
Monitor Application - Considerations Monitor Application - Considerations
Slide 1 of 2
Monitor Application - Considerations Monitor Application - Considerations
- Tank Size
- NFPA Standards suggest 20m max (EN will
go to 60m+)
- Much more possible in practice
- Manning Levels
- Large tank incidents involve >100 people
- Stream Range / Height
- Bund access may be required
- Wind direction / strength
- Tank Size
Tank Size
- NFPA
NFPA Standards suggest 20m max Standards suggest 20m max (EN will (EN will go to 60m+) go to 60m+)
- Much more possible in practice
Much more possible in practice
- Manning Levels
Manning Levels
- Large tank incidents involve >100 people
Large tank incidents involve >100 people
- Stream Range / Height
Stream Range / Height
- Bund access may be required
Bund access may be required
- Wind direction / strength
Wind direction / strength
Slide 1 of 2
- Logistics
- Foam supply (1800 lpm for 60000 monitor)
- Water supply
- Logistics
Logistics
- Foam supply
Foam supply (1800 lpm for 60000 monitor)
(1800 lpm for 60000 monitor)
- Water supply
Water supply
Monitor Application - Considerations Monitor Application - Considerations
Monitor Application - Considerations Monitor Application - Considerations
Monitor Application - Considerations Monitor Application - Considerations
Monitor Application - Considerations Monitor Application - Considerations
Monitor Application - Considerations Monitor Application - Considerations
Monitor Application - Considerations Monitor Application - Considerations
- Foam Losses
- Up to 60%
- Foam Losses
Foam Losses
- Up to 60%
Up to 60%