Institute of Behavioral Science Program Plan CVEN 4830 Presentation - - PowerPoint PPT Presentation

institute of behavioral science
SMART_READER_LITE
LIVE PREVIEW

Institute of Behavioral Science Program Plan CVEN 4830 Presentation - - PowerPoint PPT Presentation

Institute of Behavioral Science Program Plan CVEN 4830 Presentation September 4, 2008 Introduction Background Goals and Objectives Existing Conditions Planned Spaces Primary Plan Components Other concerns Background


slide-1
SLIDE 1

Institute of Behavioral Science

Program Plan CVEN 4830 Presentation September 4, 2008

slide-2
SLIDE 2

Introduction

Background Goals and Objectives Existing Conditions Planned Spaces Primary Plan Components Other concerns

slide-3
SLIDE 3

Background

History

  • Five decades of research and collaboration on problems of societal

concern

  • Five programs: Population, Political and Economic Change, Environment

and Society, Problem Behavior Programs, and Health and Society Program.

  • Housed in eight sub-standard buildings in Grandview Terrace and two

floors of a leased office building in downtown Boulder

  • The initial proposal was made in 2002

10 20 30 40 50 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 Year Million dollars

slide-4
SLIDE 4

Background

Location

INSTITUTE OF BEHAVIORAL SCIENCE

slide-5
SLIDE 5

Goals and Objectives

Campus Master Plan

  • Provide high-quality facilities to meet needs
  • Preserve and enhance traditional beauty of campus
  • Acquire and use land wisely
  • Efficient, pleasing, and safe infrastructure
  • Accommodate projected enrollment growth
  • Facilitate increased graduate student enrollment
  • Retain 10 min. class change
slide-6
SLIDE 6

Goals and Objectives

IBS

Committed to cutting edge interdisciplinary collaborative

research on problems of societal concern

Dissemination of information about research to undergraduate,

and pre- and post doctoral students

Formal training to supplement students with advanced degrees

Certificate Programs in Demography and Applied Behavioral

Impart knowledge across a comprehensive range of disciplines –

CIRES, Behavioral Genetics, UCDHSC, SURF, UROP, Honors

slide-7
SLIDE 7
slide-8
SLIDE 8

Existing Conditions

Building Deficiencies

Multiple buildings most circa 1900 Inefficient and inadequate spaces, sizes, and

configuration

Inadequate heating and cooling Insufficient power, general, and task lighting Old and failing roofs, windows, doors Minimal insulation and fire protection Inadequate accessibility at entries, public

circulation, restrooms, doorways, and vertical circulation

slide-9
SLIDE 9

Planned Spaces

IBS SPACE NEEDS SUMMARY IBS PROGRAMS & CENTERS

  • A. Administration

1,140

  • B. Computing & Research Services

2,660

  • C. Environment & Society

2,730 Hazards Center 2,060 Hazards Library 1,950

  • D. Health & Society

1,380

  • E. Political & Economic Change

2,280

  • F. Population

2,930

  • G. Problem Behavior

7,640 Center for the Study &

  • Incl. in Problem Behavior

Prevention of Violence

  • H. Shared Space

6,465 Total Program ASF 31,235 Building Gross Factor 68% Efficiiency 14,695 Total Building GSF 45,930 Total ASF

slide-10
SLIDE 10

Planned Spaces

slide-11
SLIDE 11

Planned Spaces

slide-12
SLIDE 12

Planned Spaces

slide-13
SLIDE 13

Planned Spaces

slide-14
SLIDE 14

Planned Spaces

slide-15
SLIDE 15

Planned Spaces

slide-16
SLIDE 16

Planned Spaces

slide-17
SLIDE 17

Planned Spaces

slide-18
SLIDE 18

Planned Spaces

slide-19
SLIDE 19

Planned Spaces

slide-20
SLIDE 20

Planned Spaces

slide-21
SLIDE 21

Planned Spaces

slide-22
SLIDE 22

Planned Spaces

slide-23
SLIDE 23

Planned Spaces

slide-24
SLIDE 24

Planned Spaces

slide-25
SLIDE 25

Schedule

Initiate Program Plan

March, 2007

BCPC Program Plan Approval

May 10, 2007

CEC Program Plan Approval

May 19, 2007

Regents Capital Planning Committee

May 31, 2007

Board of Regents Program Plan Approval

June 28, 2007

CCHE Program Plan Approval

July 16, 2007

CDC Approval

October 17, 2007

JBC Approval

January 9, 2008

Design Start

January 15, 2008

Design Completion

December 1, 2008

Open Bids

February 15, 2009

Construction Start

March 15, 2009

Construction Completion

May 12, 2010

Occupancy

June 1, 2010

slide-26
SLIDE 26

Other Considerations

Chilled Water and Steam Parking

Long term

slide-27
SLIDE 27