Iowa Nutrient R Reduction Strategy 2016 Annual Report 19 July 2016 Contact: Laurie Wissler 515-294-5027 lwissler@iastate.edu Measuring Change CRP: Additional $225 million $122,670,000 Total Reported 2015 Outreach Efforts Number of


slide-1
SLIDE 1

Iowa Nutrient R Reduction Strategy 2016 Annual Report

19 July 2016

Contact: Laurie Wissler 515-294-5027 lwissler@iastate.edu

slide-2
SLIDE 2

Measuring Change

slide-3
SLIDE 3

CRP: Additional $225 million

slide-4
SLIDE 4

$122,670,000

slide-5
SLIDE 5

2015 Outreach Efforts

Number of Events Average Attendance Total Reported Attendance Outreach— Fairs, Tours, and Community Education 98 140 14,375 Field Days 57 41 4,159 Workshops 19 34 1,172 Conferences 4 291 1,281 Total 178 20,987

slide-6
SLIDE 6

Farmer Awareness of the NRS

slide-7
SLIDE 7

1 2 3 4 5

2011 2012 2013 2014 2015 Acres (Millions)

Alternative Land Use in Iowa

Alternative Field Crops and Pasture CRP

slide-8
SLIDE 8

100 200 300 400 2011 2012 2013 2014 2015 Acres (Thousands) In-Field Nutrient Management in Iowa through State and Federal Funding

Cover Crops Nutrient Management - 590 Standard Conservation Tillage

slide-9
SLIDE 9

2014 2015 Wetlands, Conservation Reserve Enhancement Program (acres treated) 99,309 Bioreactors (acres installed) ................ 676 838 Terraces (feet) ..................................... 16,076,690 19,821,659 Water and Sediment Control (number) .............................................. 18,609 19,321 Selected Edge-of-Field Practices in Iowa through state/federal funding, installed since 2011

slide-10
SLIDE 10
slide-11
SLIDE 11

Nutrient Load Reduction from Select Conservation Practices

(Pounds)

2014 2015 Nitrogen - Total 3,830,000 Cover Crops 23,560,000 CREP wetlands 1,474,000 Bioreactors 6000 Phosphorus - Total 134,947 217,884 Cover Crops 112,518 196967 No-till 10,622 14,229 Reduced till 345 7 Extended rotation 1463 6,680 Phosphorus—annual CRP fluctuations†

  • 104,134

+56,311 2,356,000 196,967