Jason Paul Fair Mechanical Option Howard Comm Howard Commun unity - - PowerPoint PPT Presentation
Jason Paul Fair Mechanical Option Howard Comm Howard Commun unity - - PowerPoint PPT Presentation
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Jason Paul Fair Mechanical Option Howard Comm Howard Commun unity Co ity College llege
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Presentation Overview
- Building Summary
- Existing Mechanical System
- Depth Topic: Proposed Geothermal
- Breadth Topic: Constructability /Cost
- Summary
- Acknowledgements
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Building Summary
- Project Team
Owne Owner: r: Howard Commu Howard Community Co nity Colle llege ge C M: C M: Rip Riparius rius Const Construction, uction, Inc. Inc. Architect: Architect: Design Col Design Collective, ctive, Inc. Inc. ME MEP P Mu Mueller As r Associates ates, Inc , Inc. Structura Structural Smis Smislova, Kehn lova, Kehnemui emui & Associates & Associates Civil Civil Patton tton Harris rris Rust & Rust & Associa Associates es Geo Tech Geo Tech Froeh Froehling ing & R Robertson, bertson, Inc. Inc.
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Building Summary
- Project Team
- Overview
- 101,00
01,000 sqft 0 sqft
- Mixed Use
xed Use
- Layout
Layout
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD
- Chill
Chiller / B r / Boil iler pl er plants ants
- AHU’s
AHU’s ducted to VAV boxes ucted to VAV boxes Presentation Overview
- Building Summary
- Existing Mechanical System
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Existing Mechanical Systems
- Chilled Water
- Primary
Primary / S / Seconda condary Configuration y Configuration
- 500 ton Chiller & Coo
500 ton Chiller & Coolin ing Tower g Tower
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Existing Mechanical Systems
- Chilled Water
- Heating Water
- Primary
Primary / S / Seconda condary Configuration y Configuration
- Two 3100 MBH Dual Fue
Two 3100 MBH Dual Fuel Boilers Boilers
- 20
200oF supply F supply 160 160oF retu F return rn
- AHU Heat
AHU Heatin ing Co g Coils
- VAV Reheat Co
VAV Reheat Coil ils
- Domestic Hot Wat
Domestic Hot Water
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Existing Mechanical Systems
- Chilled Water
- Heating Water
- Air Handling Equipment
- 6 AHU’s
6 AHU’s
- 3 roof
3 roof top top
- 3 indoor
3 indoor
- Prov
Provide S ide SA to V to VAV boxes V boxes
AIR HANDLING UNITS
Total Airflow (cfm) Desig. Type Location Service Max Min AHU1 Roof Top Roof North 1st, 2nd, 3rd 36,300 13,100 6,300 AHU2 Roof Top Roof South South wing 2,3 32,300 11,300 10,300 AHU3 Roof Top Roof South South wing 4 11,000 7,100 6,500 AHU4 Indoor MER 105 North wing 1 9,000 2,800 1,900 AHU5 Indoor Basement MER South wing 1 dining 15,000 8,700 7,200 AHU6 Indoor Basement MER South wing 1 kitchen 5,700 5,700 5,700 TOTAL . 109,300 48,700 37,900 Outside Air (cfm)
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Presentation Overview
- Building Summary
- Existing Mechanical System
- Depth Topic: Proposed Geothermal
- Pl
Plenum mounted enum mounted Heat Pumps Heat Pumps
- Interconne
Interconnected run- cted run- around l
- und loop
- op
- Geotherma
Geothermal l loop
- op
con connect ection
- n
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Mechanical Depth: Geothermal
- Ground Source Heat Exchanger
- Open Loop
Open Loop Extraction & Extraction & Inject jection We ion Wells lls
- Strict EPA
Strict EPA Regul Regulations tions
- Equipment fou
Equipment foulin ing g due to mine due to mineral rals
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Mechanical Depth: Geothermal
- Ground Source Heat Exchanger
- Cl
Closed Loop
- sed Loop
Surf Surface Water ace Water
- Deep water
Deep water requ required ired
- Fluctuation in water
Fluctuation in water temp temp
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Mechanical Depth: Geothermal
- Ground Source Heat Exchanger
- Cl
Closed Loop
- sed Loop
Horizontal Horizontal
- Large Area
Large Area
- Fluctuation in
Fluctuation in su surfa rface tempe e temperature ature
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Mechanical Depth: Geothermal
- Ground Source Heat Exchanger
- Cl
Closed Loop
- sed Loop
Ve Vertica rtical
- Mi
Mini nimal ar area
- Constant l
Constant loop
- op
tempe temperatu ature
- Expensive Drilling
Expensive Drilling Costs Costs
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Mechanical Depth: Geothermal
- Basis For Proposed Design
- Hybrid System
Hybrid System
- Heatin
Heating / Coo g / Cooling ing load ba load balance nce
- Coo
Cooling Tower ing Tower meets peak cooling meets peak cooling loads loads
- Reduced Drilling
Reduced Drilling Costs Costs
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Mechanical Depth: Geothermal
- Ground Source Heat Exchanger
- Building Modeling
Design Parameters Design Parameters
- Bal
Baltimore, MD imore, MD
- Summer Design Temp
Summer Design Temperatures eratures
- 91
91oF F DB DBT
- 77
77oF F WB WBT
- Winter Des
nter Design Temperature gn Temperature
- 13
13oF
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Mechanical Depth: Geothermal
- Ground Source Heat Exchanger
- Building Modeling
Modeling Resul Modeling Results
- Original
Original Design vs Design vs Pro Proposed Design
- sed Design
- Proposed saves 52.5
Proposed saves 52.5 million Btu per llion Btu per year year
- 19,212
,212 kWh pe kWh per year r year
- Reduced peak
Reduced peak cooling cooling load by14 to ad by14 tons ns
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Mechanical Depth: Geothermal
- Ground Source Heat Exchanger
- Building Modeling
- Well Field Sizing
Peak Coo Peak Cooling ing
- 138 boreholes
38 boreholes
- 300 ft deep
300 ft deep
- $17.00
17.00/foot /foot
- $703,8
703,800.00 00.00
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Mechanical Depth: Geothermal
- Ground Source Heat Exchanger
- Building Modeling
- Well Field Sizing
Peak Heating Peak Heating
- 40
40 borehol boreholes
- 300 ft deep
300 ft deep
- $17.00
17.00/foot /foot
- $204,0
204,000.00 00.00
- Additional
Additional 270 270 tons Coo tons Cooling ing
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Presentation Overview
- Building Summary
- Existing Mechanical System
- Depth Topic: Proposed Geothermal
- Breadth Topic: Constructability /Cost
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Breadth Topic Constructability / Cost
- Scheduling
Drilling T Drilling Time me
- 700 ft/day
00 ft/day
- 2 boreho
2 boreholes /day les /day
- 4 weeks d
4 weeks drill illing ng
- 1 week pipi
week piping ng con connect ections
- ns
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Breadth Topic Constructability / Cost
- Scheduling
2. 2.5 month S 5 month Site Schedu te Schedule w le window ndow 5 week estimated 5 week estimated install installation time tion time Extra t Extra time for me for unforeseen drillin unforeseen drilling cond condit itions ions
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Breadth Topic Constructability / Cost
- Scheduling
- Cost
Equipment & Material Initial Costs
Description Geo Thermal As Designed cost cost Heat Exchange Fluid $ 1,677.00 $ - Circulation Pumps $ 19,227.00 $ 25,462.00 Air Handling Units $ 110,000.00 $ 738,167.00 VAV boxes $ - $ 41,000.00 Water Source Heat Pumps $ 331,145.00 $ - Drilling & Grout $ 203,524.00 $ - Ground loop piping $ 24,887.00 $ - Fittings and Valves $ 16,008.00 $ - Building HVAC Piping $ 901,500.00 $ 655,500.00 Chiller $ - $ 250,000.00 Cooling tower $ 29,200.00 $ 44,700.00 Plate heat exchanger $ 47,300.00 $ - Sheet metal $ 132,755.00 $ 879,400.00 Totals $ 1,817,223.00 $ 2,634,229.00
Savings of $ 817,000.00
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Breadth Topic Constructability / Cost
- Scheduling
- Cost
20 YEAR LIFE CYCLE COST
Present worth difference $841,000.00
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Presentation Overview
- Building Summary
- Existing Mechanical System
- Depth Topic: Proposed Geothermal
- Breadth Topic: Constructability /Cost
- Summary
Greater Energy Savings over Original design Lower First Cost Lower Life Cycle Cost Geothermal “Free Energy”
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Presentation Overview
- Building Summary
- Existing Mechanical System
- Depth Topic: Proposed Geothermal
- Breadth Topic: Constructability /Cost
- Summary
- Acknowledgements
Advisor Dr. Bahnfleth Professor Moses Ling Mueller Associates Parents & Siblings My Beautiful Wife THANK YOU JESUS!
Jason Paul Fair
Mechanical Option
Howard Comm Howard Commun unity Co ity College llege Student Serv Student Services Buil ices Building ng Co Colu lumbia, MD mbia, MD Presentation Overview
- Building Summary
- Existing Mechanical System
- Depth Topic: Proposed Geothermal
- Breadth Topic: Constructability /Cost
- Summary
- Acknowledgements