JSC RAO Rosneftegazstroy - an engineering holding of international level which provide services in the field of construction of oil and gas complex facilities based on experience of previous years with application of intellectual systems of


slide-1
SLIDE 1
slide-2
SLIDE 2

2

JSC «RAO Rosneftegazstroy» - an engineering holding of international level which provide services in the field of construction

  • f oil and gas complex facilities based on experience of previous

years with application of intellectual systems of project management, new technologies and resources, creating new and unique facilities, wholly meet the requirements of international standards. Effective management

  • f

total production, financial and intellectual resources which allows the company to hold intensive policy

  • n

development

  • f

new projects where “RAO Rosneftegazstroy” plays the key role is catalyst of its development and implements the work on beneficial conditions.

slide-3
SLIDE 3

RNGS – engineering holding international level

3

Main activities: (Certification ISO 9001 & ISO 14000)  complex engineering projects  IT  project management  oil and gas construction, energy  construction of oil and gas industry  industrial and civil construction  design and development of oil, gas, gas condensate  fields  industrial production  logistic  financial and investment activities

INVESTMENT ENGINEERING CONSTRUCTION

slide-4
SLIDE 4

RNGS BRANCHES

UK, Ukraine, Belarus, Latvia, Russia, Poland, Slovakia, Croatia, Hungary, Venezuela, Ghana, China, Kazakhstan, Tajikistan, Iran, Iraq, UAE, Nigeria, Libya, Colombia, Ecuador

4

Беларусь Китай Колумбия Эквадор Венесуэла Нигерия Гана Ливия ОАЭ

Великобритания

Россия Хорватия Германия Иран Ирак Польша Казахстан Таджикистан Словакия Венгрия Латвия Украина

slide-5
SLIDE 5

Equity structure

 Offices in 19 countries  600 engineers  2000 workers  870 million consolidated annual revenue  Portfolio on $ 50 billion of projects until 2025

450,000,000 shares

67% Entities

5

33% Top managers

The production, intellectual and financial resources of company The potential success of the present- future

slide-6
SLIDE 6

Structure of RAO «RNGS»

Board of Directors

General meeting

Board Chairman

Oil and gas construction Industrial and civil construction Production, oil and gas construction Machine and mechanism leasing Industrial production Service Executive body Head office - Moscow Branches and regional representative offices RUSSIA Saint-Petersburg, Kaliningrad, Novosibirsk Common Wealth Belorussia, Ukraine, Kazakhstan, Tajikistan OVEARSEAS Great Britain, Germany, Latvia, Poland, Slovakia, Croatia, Hungary, Venezuela, Ghana, China, Iran, Iraq, UAE, Nigeria, Libya, Columbia, Ecuador

Audit committee

Engineering Financial monitoring and consulting Informational services Intellectual services Legal services Social funds

6

slide-7
SLIDE 7

RNGS – INTEGRATED GROUP: KEY STRUCTURES

“RNGS International” (UK) “RNGS Clean Energy” (Великобритания) “RNGS Energy” (Latvia) “RNGS Construction” (Кипр) «RNGS – ASIA» (Tajikistan \ Kazakhstan) «Interneftegazinvest» (Hong Kong, Austria) «RNGS – AMICS» (UAE\Iran) “RNGS Curacao Trade” (Venezuela) «Interecoplant» (Belarus) RNGS - Libya RNGS - Minfepep (Colombia)

RAO «Rosneftegazstroy» RNGS – «East» (Moscow) RNGS – «Trading» (Moscow) RNGS – «Engineering» (Moscow) «Promgragdanstroy» (Moscow) «Specnefteburgaz» (Moscow) «Interneftegazspecstroy» (Moscow) «Ecorusprom» (Crimea) RNGS – «Invest» (St. Petersburg) «Interinvestservice» (Moscow\Kiev) RNGS - Energoil (Moscow) RNGS Immobilien AG (Germany)

Москв а

7

slide-8
SLIDE 8

PARTNERSHIPS WITH LEADING INTERNATIONAL COMPANIES IN THE WORLD

– BLACK & VEATCH (USA) – PWS (USA) – HUNDAI (SOUTH KOREA) – Yenigun (TURKEY) – Group of companies "Arhirodon" (Greece) – Dongying Qihai Shiyou Gongcheng Company (China) – China Geahouba Group International Engineering (China) – Shandong Kerui Holding Group Co. (China) – NPC International Ltd (Iran) – National Iranian Oil Engineering and Construction Company (Iran) – Ministry of Petroleum (Iran) – National oil company NOC (Libya) – Grupo Viatelix S.L. (Spain)

8

slide-9
SLIDE 9

Main historical milestones of RNGS Mission: providing comprehensive world-class engineering in areas of key competence of services

2015 Successfully breaking the 15 year milestone RNGS continues to expand its sphere of competence and to improve knowledge base

Joint-stock company established on the basis of oil and gas enterprises

  • f the former Ministry of oil and gas

construction

Ministry of oil gas and construction

  • f the USSR
  • Dr. Ivan Mazur

President

2001

ISO 9001 ISO 1400 EPCM-Контрактинг Проектные инвестиции

9 Restructuring of the company structure and functions

1970 1999 2006

slide-10
SLIDE 10

RNGS offers unsurpassed historical experience

199516 padded main pipelines 563150 km of secondary and distribution pipelines 12068 km international pipelines 16 million cubic meters warehousing 1500 compressor and pumping stations

10

slide-11
SLIDE 11

11

slide-12
SLIDE 12

KEY COMPETENCE

12

Engineering Material-technical supply Finance and Investment activity Pipeline building Onshore and special facilities

  • il and gas industry

Industrial and civil building

slide-13
SLIDE 13

KEY COMPETENCE

13

Leasing of machinery Ensuring environmental safety Consulting services Development and adaptation information technologies Industrial and civil construction Property management

slide-14
SLIDE 14

HEALTH, SAFETY AND ENVIRONMENT

One of the main requirements is RNGS implementation and continuous improvement of

  • ur health systems, safety and the environment (the HSE)

A fundamental condition underlying successful achievements in this field is to create a permanent, does not stop the process, characterized by simple principles: 13

 Watch  Listen  Learn  Think  Decide  Achieved  Bring to a conclusion and checks

The priority task of the company - to ensure safe working conditions, health care personnel and people living on the territory of work, seeking to minimize the negative impact on the environment

slide-15
SLIDE 15

PIPELINE CONSTRUCTION

 Gas pipelines of high and low pressure  Pipelines  Pipelines for the transport of water  Water conduits of high and low pressure

14

slide-16
SLIDE 16

 Oil and gas refineries  Complex gas and oil  Compressor stations  Gas distribution station  Pumping stations  Tank Farms  Power plants

CONSTRUCTION LAND AND SPECIAL FEATURES OF FUEL AND ENERGY COMPLEX

15

slide-17
SLIDE 17

Industrial and civil construction

 Development of real estate projects  Engineering survey  Design  Construction and equipping  Reconstruction of Buildings  Organization of supply of construction materials

16

slide-18
SLIDE 18

Development and construction of oil and gas fields

In a "turnkey" RNGS develops and field development

17

 Industrial infrastructure construction  Exploration and production drilling  Trial operation  Project investment  Financial advisory

slide-19
SLIDE 19

RNGS-ENGINEERING

Complex engineering services for fuel and energy complex enterprises with application of leading engineer and information technologies.

18

 Design and development works  Scientific works  Development of price documentations  Development of new technological processes ИНЖИНИРИНГ

 Marketing  Material requirement planning  Strategy development and procurement procedures  Logistics

 Project planning  Project control  Quality control  Procurement management  Safety measures, environmental protection  Commissioning planning  Organization of adjustment works ADJUSTMENT WORKS PROCUREMENT CONSTRUCTION MANAGEMENT

slide-20
SLIDE 20

Information Technology for Development

  • f Regions

 Information analysis support systems  Preparation, editing and printing activities  Design executive systems  Management  Advertising Services

20

slide-21
SLIDE 21

Purchasing and delivery

 Supply of materials and equipment  Supply of steel, plastic and enameled pipes for oil and gas projects under construction  Deliveries to customers a full range of petrochemical and building products, including welding equipment, mobile power station, cutting tools, press- forging equipment, pipe fittings and other technical products  Warehousing, wholesale and agency services production and financial activities

20

slide-22
SLIDE 22

COMPETENCE IN LEASING SECTOR

 Marketing services in the field of project oriented leasing of oil and gas equipment, construction machines and mechanisms  Organization of leasing operations  Interaction management with leasing obtain companies in the field of oil and gas  Import outsourcing /export of industrial equipment , components and spare parts, transport and technics for oil and gas complex enterprises

21

slide-23
SLIDE 23

INVESTMENT AND FINANCIAL SECTOR ACTIVITIES

 Marketing of financial markets  Financial and investment activities on loans and investment funds  Direct investment in realization of investment projects of RNGS  Mobilization of attracted and loans for financing huge investment projects  Services in the field of consulting investment

22

slide-24
SLIDE 24

PRODUCTION OF OIL AND GAS EQUIPMENT

Group of companies «ROSNEFTEGAZSTROY-PROM»

Production and supply «EPC» of industrial and oil and gas equipment, as well as provision of financing of production areas of water participants of financial- industrial group RNGS-PROM

GC «RNGS-PROM»

СТРОЙПРОМГРУПП

23

slide-25
SLIDE 25

GROUP OF COMPANIES ROSNEFTEGAZSTROY-PROM

25

Petrochemical industry

Oil and Gas construction Resources production Trade

 Complex engineering, supply, construction of energy oil complex (EPC)  Production of industrial equipment (petrochemical, , energy industrial refining plants, steel structures) We identify an optimal technology and coordinate the constructional and installation works  selling individual equipment and technological installation. We are the sales partner and related services in Russia and abroad  Module construction We suggest solutions of assembly in accordance with requirements of Customer  RNGS-PROM provides services of industrial nature in Russia, Common Wealth, Middle East, Africa and other regions

Equipment production

slide-26
SLIDE 26

26

slide-27
SLIDE 27

WATER TREATMENT FACILITIES

  • Zelenograd. Moscow

Construction of sewage treatment plants with a complex full biological treatment technology for SYMBIO

 Performance of 140 thousand cubic meters. m.  The total cost of the project: 135 million Euro  Conditions of project realization : ВООТ  Payback: 13 years

26

Customer: Moscow water company Investor: «SHV Helter Wassertechnik» (SHW) EPC Contractor: RAO «Rosneftegazstroy»

slide-28
SLIDE 28

DEVELOPMENT OF YURBENCHENSK BLOCK OF YURBENCHENSK-TAKHOMSK OIL AND GAS CONDENSATE FIELD IN THE EASTERN SIBERIA

 Development of the field  Infrastructure facilities construction  Exploration and exploitation drilling  Industrial exploitation  Capital investment(I stage): 370 mln. USD

28

Customer: Eastern-Siberia oil and gas company, RAO «Rosneftegazstroy» EPC Contractor: RAO «Rosneftegazstroy»

Recoverable reserves НГК locations: Oil: 280 mln. tn Gas: 374 bln. cub. м3 Gas condensate: 30 mln. tn

slide-29
SLIDE 29

PROJECT WA TER SUPPL Y MELEN (T urkey)

In accordance with the agreement on cooperation between ALARKO and JSC "RSP Neftegazstroy" participated in the construction

  • f water pipe diameter 2540 mm from the tank

farm to the city of Melun Kinseli Viladis

29

The Customer- Ministry of Energy and Natural Resources

slide-30
SLIDE 30

Кропоткино Комсомольская Астраханская

CASPIAN PIPELINE CONSORTIUM

 Modernization "Astrakhan" existing pumping station  Demolition of existing production facilities, the construction

  • f a new pumping "Komsomolskaya" station

 Construction of pump "Kropotkin" station  Contract Value: $ 120 million

30

The Customer Caspian Pipeline Consortium EPC contractor: RAO "Rosneftegazstroy"

Construction of 3 pump stations on export oil pipeline Tengiz - Novosibirsk

slide-31
SLIDE 31

OIL PIPELINE «Zhulin-Nadvornaya»

Ukraine Contract cost: 78 mln. $

31

The Customer: "Ukrtransnafta" (Ukraine) RNGS constructed pipeline "Zhulin-Nadvornaya" length of 80 km, with a diameter of 20 ", including water obstacles

slide-32
SLIDE 32

GAS PIPELINE DANEZH- VIDZHEAPUR (INDIA)

 Length - 193 км  Diameter – 42”  Project cost - $ 127 mln.

32

Customer- GAS AUTHORITY OF INDIA LIMITED(GAIL)

Construction of the pipeline and facilities Danezh – Vidzheapur infrastructure destination

slide-33
SLIDE 33

CONSTRUCTION OF METANOL PLANT Azerbaijan, Baku

 Engineering  Project management / Construction  Equipment supply  Capacity - 500 tn/year

33

Customer - «AZ MENKO»

slide-34
SLIDE 34

CIVIL ENGINEERING

Rosneftegazstroy as a developer, investor and developer has implemented a series of programs and projects for housing and social facilities in the regions of Russia and CIS countries. Over the past 15 years built and put into operation more than 5 million. M2.

12

slide-35
SLIDE 35

35

slide-36
SLIDE 36

Development of oil and gas licensed areas

Orenburg region (Russia)

Construction Arhangelovskogo and Sunny license areas. Industrial infrastructure construction. Exploration and production drilling. Pilot operation. The forecast of the production of hydrocarbons on Arhangelovskom and sunny plot in the period 2016-2021 years

  • Oil: 20,2 million bar
  • Gas: 430 млн. м3

The total foreign currency fund: 63 units Investment budget: $ 420 million Arhangelovsky site. Recoverable reserves.

  • Oil:. 30 million bar
  • Gas: 0.3 billion m3

Sunny plot. Recoverable reserves.

  • Oil:. 36 million bar
  • Gas: 0.9 billion m3.

36

Project participants: INTERCOM GROUP \ RAO ROSNEFTEGAZSTROY

slide-37
SLIDE 37

Development of oil and gas license areas

Construction Arhangelovskogo and Sunny license areas. Industrial building infrastructure. Exploration and production drilling. Pilot operation. The forecast of hydrocarbon production raw materials on Arhangelovskom and sunny plot in the period 2016-2021 years

  • Oil : 20,2 million barrels
  • Gas: 430 million. M3

The total foreign currency fund: 63 units Investment budget: $ 420 million

37

Arhangelovsky site

  • Recoverable reserves
  • Oil:. 30 million bar
  • Gas: 0.3 billion m3.

Sunny plot

Recoverable reserves Oil:. 36 million bar Gas: 0.9 billion m3.

Project participants: INTERCOM GROUP \ RAO ROSNEFTEGAZSTROY

slide-38
SLIDE 38

Bitumen terminal in the Leningrad region \ Russia

BUILDING AUTOMATED BITUMEN TERMINAL

T erminal is aimed for receive, store, transfer , dozing and production of vast assortment of bitumen materials of 80 ths.tn. capacity

 Polymer warehouse\containers\packing host  Tanks of bitumen storage: 30-40 ths. m  Tanks of end product: 20-40 ths. m  Production of bitumen mixtures: 10 tn\hour  Production of oxidative bitumen: 20-40 tn\hour Project investment budget: 80-90 mln. $ Conditions of project realization: BOT

38

Customer: «Gazpromneft» Investor: «CITIC Group» (China) participants: RAO «Rosneftegazstroy» \ MARCON INGENIEURGESELLSCHAFT mbH

slide-39
SLIDE 39

The investment project to build a plant for LNG production in Iran \ of Jask

RAO "Rosneftegazstroy" supported by National Iranian Gas Company (NIGC) the investor - developer to build a plant for the production of LNG capacity of 600 thousand tons per year and logistic

  • distribution

infrastructure for the export of LNG and gas supply in remote areas. LNG complex 600 ths. tn. capacity a year, consits of two lines of 300 ths.

  • tn. LNG each a year

( I and II stages) Systems of storage of 30 ths. м3 Gas pipelines: GTS – LNG plant 700 мм diameter Logistics and marketing infrastructure Resource: natural gas from united system of Iran’s gas supply Project investment budget: 750 mln. $

39 Customer: National Iranian Gas Company Project participants: RAO "Rosneftegazstroy» \ "Black & Veatch" (USA)

slide-40
SLIDE 40

REFINERY PLANT «Refinery Kirishi-2»

With the support of the Ministry of Energy (DOE order number 33-P on the entry in the register of projected plants in the Russian Federation), RAO "Rosneftegazstroy" takes part in the implementation of the project on construction of a fuel and energy complex in Kirishi  Power refinery (Phase I) - 3 million tons / year  (II stage) – up to 12 mln. tn./year  Processing Depth: 85-95%  Square build on land: 130 hectares  Investment project budget (Phase 1): 3,6 billion USD  Project stage: Feasibility Study

40

Customer-Contractor: «ZAO NPZ KIRISHI-2» (51% stocks - RNGS) Co-investor / Project participants: RAO «Rosneftegazstroy»

Leningrad region, Kirishi

slide-41
SLIDE 41

STEAM GAS STATION «PERECHUGA»

CROATIA

Within the Agreement with the Government energy company HEP GROUP (Croatia) realization of the project of ebergy center in Osiek city with construction of 2 new energy blocks in Perucha city.  The construction land area: 6,9 hectares  Capacity of 2 blocks: 450 mGW  Heat capacity : 160 mGW  Efficiency: 59,3%  Fuel: natural gas GTS Project investment budget: 540 mln. €

41

Customer: HEP GROUP (Croatia) Project participants: RAO «Rosneftegazstroy»\ “ANSALDO ENERGIA” (italy)

slide-42
SLIDE 42

MODULAR INSTALLATION OF OIL REFINING OF UPN-20B

IRAN

Construction of low tonnage equipment for minimum volume of oil refining and construction works for support of consumers by required resources in hardly accessible provinces of the Islamic Republic of Iran. Equipment capacity: 500 ths. tn. A year Stucture: modular eqiopment with possibility of container transportation Construction: 100% over ground equipment with minimum fundamental works Launch date after contract signing: 2 years Investment budget: 17 mln. $

42

Customer-Contractor: JV with participation of RAO «Rosneftegazstroy»

slide-43
SLIDE 43

HIGH-TECH BITUMEN MATERIAL PRODUCTION COMPLEX

ORENBURG PROVINCE

Project of heavy oil and fuel oil refining enterprise establishment in polymer- bitumen-viscous (PBV), WFLH (wide fraction of light hydrocarbon), vessel engine fuel Location: Perevolotskiy village, Orenburg province Land: 22 hectare Project capacity on starting material: Oil/Crude oil: I Stage of the complex: 50 thousand tn. per year Project stage: Construction Project total cost: 85 mln. USD Cost of I stage : 50 mln. USD Period of construction of I stage: 2 years Period of return (not taking construction into account): 3,9 years

Participants: LLC «Bitumen Eurasian company\ RAO «Rosneftegazstroy»

43

slide-44
SLIDE 44

COMPRESSOR STATION

TURKMENISTAN

Integrated design and construction of a compressor station (CS) on the Turkmenistan-Afghanistan-Pakistan-India "turnkey"  Performance for sales gas: 33 billion cubic meters per year  Compression of gas: 100 kg \ cm2  Pipe diameter pipeline: 1,420 mm Gas compressor units: supplier of "General Electric Energy Cost of Contract: $ 180 million

44

Customer: SC "Turkmengaz" Participants: International EPC consortium with the participation of RAO "Rosneftegazstroy

slide-45
SLIDE 45

GAS-CHEMICAL COMPLEX IN THE REPUBLIC OF SAKHA

Sakha

Investment project for the production of synthetic liquid products from natural gas using GTL technology  Location: Aldan  Production volume 1150 tons per year  500 thousand tons of synthetic liquid fuels  450 thousand tons of methanol  200 thousand tons of ammonia  Electricity generation 200 MW  Natural gas conversion technology . Method HOLDOR TOPSOE  Raw materials: natural gas Chayandinskoye CC m \ p 1.2-1.5 billion m3  The investment budget for the project: 990 million USD

45

The base of the project: Agreement with the Republic of Sakha Yakutia RAO "Rosneftegazstroy" for the organization of processing industries in the region

slide-46
SLIDE 46

GAS PIPELINE "T AJIKISTAN-CHINA"

(LINE D)

RAO "Rosneftegazstroy" within the framework created by the company "Enigyun" (Turkey), the International Consortium "TADZHIKGAZPROEKT" and republican companies taking part (on EPC) in the construction of the gas pipeline China-Tajikistan in the territory of the Republic of Tajikistan. Length: 410 kilometers, pipe diameter 1219 mm The project includes: driving of 73 km of tunnels, 17 km of river crossings, construction of three compressor stations with a pressure of 12 MPa Project cost: 3,2

  • bln. $

46

Customer:JV "Trans-Tajik Gas Pipeline Company Ltd Ltd

slide-47
SLIDE 47

REFINERY «RDF» Pacific Eloy Alfado (Ecuador)

Construction, technical maintanance,terminal exploitation and regasification in Monteverde for provision the plant by gas on produc tion pf urea in Ecuador . Project stage

  • Feasibility study

System capacity

  • 30 MMSCFD / 850 ths.м3/day

Cost

  • 280 mln. $

Payback

  • 6.3 years

Profitability

  • 14.44%

Financing

  • 100% attracted/

loan funds

47

Project participants: MINISTRY OF HYDROCARBONS (Ecuador) JVA RNGS MINFEFE SA / ROSNEFTEGAZSTROY

slide-48
SLIDE 48

LPG TERMINAL (Ecuador)

Operation and maintenance of the terminal and storage of LPG in Monteverde –Ecuador in

  • rder to meet requirements in the southern region of the country

Facility operation :

  • Coastal terminal of LPG

Platform Tank park of Propane/Butane/LPG Pump Pipeline LPG L-124 km  Production - 6 tn./year

  • Storage terminal

Tank park Bunkering insfrastructure Investment

  • 700 $

Operation period - 25 years Project payback – 6-12 years Profitability

  • 20%

48

Project participants: Ministry of hydrocarbon materials (Ecuador) JVA RNGS MINFEFER SA / Rosneftegazstroy

slide-49
SLIDE 49

REFINERY «RDF» Pacific Eloy Alfado (Ecuador) (Ecuador)

Construction, management, maintenance and operation of refinery «RDF» of capacity 18 mln. t/year Project stage: Feasibility study Location: Monta Montekristo Project structure: Refinery – 300 ths. bbl a day Oil terminal / tanks Oil pipeline Products pipeline

49

Refinery Project cost - $ 14.4 billion.  Building time - 4 years  Payback period - 8.5 years  Profitability - 16.7%  Useful life - 31 year Terminal Project cost - 600-800 billion $  Building time - 4 years  Payback period - 9,9 years  Profitability - 12,9%  Useful life - 31 year Financing of the project - 100% borrowed / loan funds of the investor

Project participants: MINISTRY OF HYDROCARBONS (Ecuador) JVA RNGS MINFEFE SA / ROSNEFTEGAZSTROY

slide-50
SLIDE 50

Gas-chemical complex on production of urea (Ecuador)

Construction, management, maintenance and operation of a gas-chemical complex for the production of urea in Ecuador  Location: Monteverde  Capacity of the plant: 500 thousand tons / year  Technology: Holder Topsae / Linde / KBR  Need 30 MMSFD / 400 th. M3 / day  natural gas Project cost

  • 1.1 billion $

Construction time - 3 years Payback period

  • 7.4 years

Profitability

  • 11%

Useful life - 30 year Financing

  • 100% borrowed / loans investor means

50

Project participants: MINISTRY OF HYDROCARBONS (Ecuador) JVA RNGS MINFEFER SA / ROSNEFTEGAZSTROY

slide-51
SLIDE 51

TECHNOLOGY TRANSFER (Key products)

Mini LNG plant

Russian regions for pilot realization :

 S. Petersburg  Ekaterinburg  Murmansk  Kaliningrad  Yakutia  Irkutsk  Far East  Siberia

51

Plant’s production

from 50,000 to 1,500,000 tn. a year

slide-52
SLIDE 52

OIL LOADING TERMINAL – JASK \ ISLAMIC REPUBLIC OF IRAN

Construction of oil loading terminal of 30 mln. bbl of global standards

  • n the shore of Oman Gulf

Tank farm: up to 30 millions of crude oil storage (3 stages by 10 million bbls.) Tank loading units TLU systems CALM Coastal\Sea pipelines and facilities Energy equipment Tanker deadweight: 150 - 300 ths. tn. Investment budget: 0,9 bln. $ Conditions of project realization: Financial scheme: ВООТ Complex rent by NIOC for transshipment of oil\oil products Project stage: Engineering Customer: National Iranian Oil Company (NIOC)

52

Project participants: RAO «Rosneftegazstroy»/Marcon/ Pension fund

  • f the Islamic Republic of Iran as an international consortium
slide-53
SLIDE 53

OIL TERMINAL – JASK \ IRAN Participants of the investment project

53

National Iranian Oil Company (NIOC) Agreement ВОТ \ leasing contract for complex rent RAO «Rosneftegazstroy» (Russia) \ “Marcon” (Germany) Complex engineering \ organization of financing \ project management \ supply of m\k RVS and equipment of Russia \ project co-investors Pension fund of Iran, «Zalvand» company (Iran) Private-government partnership\ Project co-investors Zalvand company (Iran) Project co-investor \ construction and special works Archirodon group of companies (Greece) Construction of coastal and sea facilities (port, terminal, pipeline) Sberbank (Russia) Project financial consultant Sberbank \ Vnesheconombank (Russia) International and Asian banks Potential creditors of the project based on the matrix of supply \ services

slide-54
SLIDE 54

Trade terminal complex Moscow province, Solnechnogorskiy area 650000 m2

Construction of international free economic zone consists of 2 sections: Trade-exhibition center Center of sail and receive of goods The land area – 17 hectares Project cost – 0,9 bln. $

54

Customer: «RTEC Free Custom Zone» Co-investor / Contractor: RAO «Rosneftegazstroy»

slide-55
SLIDE 55

55

«RAO Rosneftegazstroy» is open for cooperation with representatives

  • f Russia and International business based on mutual respect and

economic efficiency and in this regard is solely attractive strategic partner in Russia, Common Wealth and Far Abroad markets

Russia, 119049, Moscow city, str. Donskaya 15 Tel/Fax: +7 (499) 213-34-08 E-mail: rngs@rngs.ru Great Britain, London 38 Park Street, Mayfair London W1K 2JF, UK Tel.: +44 (207) 297-43-56, Fax: +44 (207) 297-43-50 E-mail: rngs@rngs.ru Russia, 199106, Saint- Petersburg, В.О., 23 Line, д. 2 «А» Tel/Fax: +7 (812) 677-31-89 E-mail: mao@rngs- invest.ru