July 18, 2018 Colleen West Business Development Asphalt is Made of 95% Rock & 5% Liquid Asphalt RAP & RAS Used in many States Liquid Asphalt From Suppliers (Conoco, Exon) isnt what it used to be Federal


slide-1
SLIDE 1

July 18, 2018 Colleen West – Business Development

slide-2
SLIDE 2
slide-3
SLIDE 3
  • Asphalt is Made of 95% Rock

& 5% Liquid Asphalt

  • RAP & RAS Used in many

States

  • Liquid Asphalt From Suppliers

(Conoco, Exon) isn’t what it used to be

  • Federal Highway

Administration Standards

slide-4
SLIDE 4

◻ Oxidation

⬜ The drying out of the

pavement

◻ Water/Weathering

⬜ Water sits on the

pavement surface starting the deterioration process from the surface down.

slide-5
SLIDE 5

THIS IS REACTIVE NOT PREVENTATIVE

slide-6
SLIDE 6
slide-7
SLIDE 7

Long-Term Cost Savings Avon 12:37-

13:37

Proper maintenance of pavements results in longer lasting

  • pavements. Life extension of 5 – 7 years.
slide-8
SLIDE 8

ASPHALT CONSISTS OF TWO MAIN FRACTIONS: Asphaltenes: They are the bodying agent in asphalt and when an asphalt ages their content increases causing the asphalt to become brittle. Maltenes: They are the oil fractions of the asphalt. The four fractions each have a function in defining the reactivity or aging characteristics of the asphalt.

slide-9
SLIDE 9

Replace the Lost Maltene Fractions

slide-10
SLIDE 10

In-depth Seal, seals pavement surface. Becomes Part of the pavement. Not A Topical Treatment Helps Asphalt Retain Aggregate Seals the surface of the pavement Keeps surface flexible Slows the aging process Enhances Future Treatment Programs

slide-11
SLIDE 11

Application 3 Minutes 7 Minutes 10 Minutes 15 Minutes Sanded at 15 Minutes

slide-12
SLIDE 12
slide-13
SLIDE 13
slide-14
SLIDE 14
slide-15
SLIDE 15

Untreated Older Pavement Untreated Treated

After Rain Event

slide-16
SLIDE 16

Reclamite Test Section After Rain Event (3 Years)

untreated treated

slide-17
SLIDE 17

UNTREATED TREATED UNTREATED TREATED UNTREATED TREATED

TREATED UNTREATED

Untreated Treated

slide-18
SLIDE 18

Reclamite– Jackson, MO (6 Years Post Treatment)

  • Paved 2010
  • Reclamite Applied 2011
  • Picture Taken September 2017
  • Treated

Untreated

slide-19
SLIDE 19

Village of Lombard – paved in 2008, treated in 2009

Photo taken in 2015 Photo taken in 2015 Photo taken in 2017 Photo taken in 2017

Reclamite– Lombard, IL ( 6 years vs 8 Years Post Treatment)

slide-20
SLIDE 20

Village of Yorkville, IL

Treated Untreated

slide-21
SLIDE 21

UNTREATED TREATED UNTREATED TREATED UNTREATED TREATED TREATED UNTREATED TREATED UNTREATED TREATED

TREATED UNTREATED

Treated Untreated

Village of Yorkville, IL 18 Year Old Pavement

slide-22
SLIDE 22

Email: colleen@cammidwest.com Colleen Cell: 314.267.9313 www.cammidwest.com