June 2018 July 2018 July 2018 July 2018 July 2018 August 2018 - - PowerPoint PPT Presentation
June 2018 July 2018 July 2018 July 2018 July 2018 August 2018 - - PowerPoint PPT Presentation
June 2018 July 2018 July 2018 July 2018 July 2018 August 2018 August 2018 September 2018 Electr ectric V c Vehicle C Chargi ging g Stati tations We currently have 4 duel ChargePoint CT4000 charging stations with ports to charge 8
June 2018 July 2018
July 2018
July 2018
July 2018
August 2018
August 2018
September 2018
Electr ectric V c Vehicle C Chargi ging g Stati tations
- We currently have 4 duel ChargePoint CT4000
charging stations with ports to charge 8 Electric Vehicles at one time.
- Each station has a color LCD display with an
instructional video on how to use the station.
- Multi-language: English, Spanish and French
- Touch button interface works in rain, snow and
with gloves.
Elect Electric ic V Vehicl ehicle Cha Chargin ing Stations s
- Each station has two standard Level
2 charging ports with locking holsters.
- Each port provides that can
charge any Electric Vehicle.
- Each port is equipped with a 23ft
charging cord to increase the usability of our charging spots.
- Charging stations are available
24/7.
7.2 kW
November 2018
DPUC/PUC LEAD BY EXAMPLE
- October 2
2012 – New ew en ener ergy-effic icie ient nt HVAC S System i installe lled
- May 2
y 2013 – Purcha hased 2 2013 T Toyo yota Camry a y and nd T Toyo yota H Hig ighland nder ( (hyb hybrid ve vehic hicles)
- December 2
2015 – En Energy-effic icie ient nt L LED lighting ing
- Nove
vember 2 2016 – 2 dual l Ele lectric V Vehic hicle Cha harging ng S Stations ns
- December 2
2016 – Purcha hased 2 2016 C Che hevy V vy Volt lt ( (Ele lectric Vehic hicle)
- October 2
2018 – Installed e ed energy gy-effic icie ient nt w water h heater
- Nove
vember 2 2018 – Solar Carpo port a and d an addi dditional 2 2 du duel E Electric V Vehicle C Chargi ging g St Station
- ns
s (T (Total of
- f 4
4 duel El Electri ric V Vehicle Ch Charging St Stations)
- Janu
nuary 2 y 2019 – Will ill be adding ing ano nothe her 2019 C Che hevy B vy Bolt lt t to o
- ur f
fle leet (Ele lectric V Vehic hicle)
50000 100000 150000 200000 250000 300000
Decl cline ne i in n ene nergy co cons nsumption f from Mar March ch 2003 2003 – Mar March ch 2019 ( 2019 (pr projected)
89 Jefferso rson B Boulevard rd War arwick, R RI
Special Thanks!
Divis isio ion o
- f Publi
lic U Utilit ilitie ies & & Carrie iers
Kevin Lynch, Deputy Administrator Al Contente, Engineer (Project Manager) Becky Harwood, Information Technology
Office o e of Energy R y Resou
- urces
es
George Sfinarolakis – Solar Canopy Ryan Cote – Electric Vehicle Charging Stations
Divisi sion o
- f Capi
pita tal A Asse set M t Manag ageme ment t & Mainte tenan ance
Simidele Mabray – Solar Canopy John Couture – Electric Vehicle Charging Stations
Newpo port R rt Renewab ables s
Stuart Flanagan – Co-Founder Michael Cabral – Co-Founder