LIFE13/ENV/ES/1513 ATRES80 Santiago de Compostela Oct. 21, 2015 - - PowerPoint PPT Presentation

life13 env es 1513 atres80 santiago de compostela oct 21
SMART_READER_LITE
LIVE PREVIEW

LIFE13/ENV/ES/1513 ATRES80 Santiago de Compostela Oct. 21, 2015 - - PowerPoint PPT Presentation

LIFE13/ENV/ES/1513 ATRES80 Santiago de Compostela Oct. 21, 2015 Project Areas & Problems targeted Cooperativa Agrcola iCaixa Agrria de Cambrils High electricity and fuel costs Affects competitiveness Stronghold for rural


slide-1
SLIDE 1

Santiago de Compostela

  • Oct. 21, 2015

LIFE13/ENV/ES/1513

ATRES80

slide-2
SLIDE 2

Project Areas & Problems targeted

Cooperativa Agrícola iCaixa Agrària de Cambrils

  • High electricity and fuel costs
  • Affects competitiveness
  • Stronghold for rural development despite

increasing land abandonment

  • Soil degradation, semiarid environment
  • Inefficient organic waste management
  • Olive pits, press olives, pruning and

mowing waste

slide-3
SLIDE 3

Environmental problems targeted

slide-4
SLIDE 4

a) Significant energy savings Generate savings in energy consumption and reduction of CO2 emissions by:

Lowering the cooperative’s environmental footprint by 10% Lowering the cooperative’s electricity bill by 20% Lowering participating farmers’ electricity bills by 50% Organic waste to produce thermal power for boilers Rural Smart Grid promoting energy efficiency Bio-energy crops for conversion to biofuel

To demonstrate the economic and environmental viability of a new business model for agricultural cooperatives, integrating energy savings and the generation of renewable energies and biomass production.

Project objectives

b) Use of renewable sources Substitution of required energy through local and renewable sources by:

slide-5
SLIDE 5

PARTNERS’ RESPONSIBILITIES

Cooperative members’ land

Econia

  • Internal project management
  • Environmental diagnosis and

assessment of waste

  • Local dissemination
  • Coop. Cambrils
  • Implementation of hybrid

wind mills (A)

  • Implementation of boiler / co-

generator / dryer (B, E)

  • Resource optimization (C)
  • Crop development (D)
  • Local dissemination
  • General management

BaiWind

  • Selection of areas for hybrid wind

power devices (A)

  • Manufacturing and development
  • f mini wind mills
  • Technical evaluation and

monitoring

Atres80

  • Analysis of energy system of

CoopCambrils

  • Implementation of saving and

energy production systems (C)

  • Optimization of energy systems:

co-generators / boilers / dryers (B, E)

  • Technical evaluations

Co-generator (B)

Bio energy crops + pruning/ dried waste /etc.

Co-generator (B)

Olive seeds

Test new energy crops (D) Cooperative headquarters (C)

Optimisation of resources: (C)

  • Efficient pumps
  • Optimisation irrigation
  • Smart metering
  • Efficient lighting,

heating, etc.

  • ….

Eolic energy production (A)

Transfer LBC

  • Support internal project

management

  • Promotion and

dissemination Production of renewable energy/sources Energy efficiency

CERTH

  • Bio energy crops and

renewable energy systems (B, D, E)

  • Promotion and local

awareness in Greece

Dryer for olive waste (E)

slide-6
SLIDE 6

Actions Timetable- COOP2020

slide-7
SLIDE 7

Preparatory Actions

Project progress so far

 A.1. Selection of areas for hybrid eolic power devices (1 at Coop. and 2 with other farmers)  A.2. Analysis of test area for energy crop production  A.3. Energy efficiency studies  A.4. Analysis for requirements of co-generator and biomass application A.5. Analysis of organic waste stream for co- generator input

Cardoon Guinea grass Sweet sorghum Triticale

slide-8
SLIDE 8

Implementation Actions

Project progress so far

 B.1. Installation of eolic power devices + connection to irrigation system  B.2. Sowing and harvest of energy crops on test land  B.3. Implementation of energy generation installations  B.4. Implementation of micro Smart grid system + energy savings measures

slide-9
SLIDE 9

Project progress so far

Dissemination Actions

 D.1. Project Website  D.2. LIFE+ Information Boards  D.4. General Dissemination  D.5. Local Awareness

slide-10
SLIDE 10

Pending tasks

 Implementation of biomass boiler / co-generation  Monitoring and evaluation of the Smart Grid  Socio-economic impact assessment  Dissemination of results, awareness-raising, networking

slide-11
SLIDE 11

Thank you for your attention!!! THANK YOU FOR YOUR ATTENTION!

For more details, please contact:

Angélica Bercetche angelica@transfer-lbc.com www.coop2020.eu www.transfer-lbc.com