Losinger Marazzi Vision and deployment of BIM Damien Chevarin Head - PowerPoint PPT Presentation
Losinger Marazzi Vision and deployment of BIM Damien Chevarin Head of BIM Management Summary 1. BIM by Losinger Marazzi 2. Use cases 3. BIM at the new Limmattal hospital 4. Conclusion Losinger Marazzi - d.chevarin buildingSMART at
Losinger Marazzi – Vision and deployment of BIM Damien Chevarin – Head of BIM Management
Summary 1. BIM by Losinger Marazzi 2. Use cases 3. BIM at the new Limmattal hospital 4. Conclusion Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 2
BIM by Losinger Marazzi Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 3
Why deploy BIM? Anticipation Quality Complexity of Customer projects Requirements Multiple Increasing Collaboration Efficiency partners digitalisation Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 4
Our BIM development priorities Customer relationship Project Management Site management Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 5
Our BIM development priorities Customer relationship Project Management Site management Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 6
Dataorganisation: agility Geometer Customer Architect Room by room 3D Model Architect Gen. Contractor + Engineers MEP engineers All Partners STR engineer Gen. Contractor Gen. Contractor Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 7
Workflow Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 8
Data is our priority detailled definition 3D model (from our partners) of each element Centralized and collaborative database Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 9
2 Use cases Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 10
Urban regeneration projects and Smart Cities Sustainable neighborhood Les Vernets – Geneva (GE) Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 11
Visualization and validation with VR Decision supports / Digital mock-up Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 12
Digital mock-up Clinic CIC Riviera – Clarens (VD) Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 13
Business presentation with on site augmented reality Logistics building and offices – Plan-les-Ouates (GE) Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 14
Design Management Hotel – Grand-Saconnex (GE) BIM coordination by Losinger Marazzi (with external partner for few projects) Use of IFC for 3D-model and BCF for the issues Software: Solibri Model Checker Coordination meeting BIM COORDINATOR PROJECT MANAGEMENT ARCHITECTS MEP ENGINEERS STRUCTURE ENGINEER Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 15
End-of-design documentation Neuroscience Laboratories – Prilly (VD) Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 16
BIM on site Neuroscience Laboratories – Prilly (VD) Proof of concept of multiple solutions in progress Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 17
Delivery & logistics on site Sustainable neighborhood Eikenøtt Building A2 – Gland (VD) Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 18
Prefabrication and construction methods Student housing – Zurich Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 19
3 BIM at the new Limmattal hospital Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 20
A pilot project The first hospital project in Switzerland in design-to-cost One of the first projects with BIM Voluntary approach from multiple partners to implement a BIM-process Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 21
Workflow and organisation Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 22
1 st Use case: data management Why? - To support customer relations management - To integrate the right information into the documentation How? - at the beginning: an Excel-sheet (XX Mo with Macro) - during the optimization: dRofus (with connection to 3D-Models) Which use cases? - View of all the rooms for execution - Quantities check (Project vs Roombook) Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 23
2 nd Use Case: Coordinated Model Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 24
3rd Use Case: Quantities Check the quantities and the costs of the project in the design phase Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 25
4th use case: Manage the time schedule Manage the time schedule with: • - An efficient production of the “ room by room ” drawing (6 views) - A quality control with 3D-Model main entrance Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 26
All Users 3D Model 3D Merged Control Learn 2D Plan Database «Revit Model model model Model «Allplan» «dRofus» Server» «Nova» «Glue» «Field» «HTC» Customers X X Architects X X Civil engineers X MEP engineers X X BIM Management X X X X X Design Manager X X X X Construction X X X workers Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 27
Use of file formats Design Execution FM Comments IFC Yes Yes ? Models exchange BCF No No No Technology not compatible Test between 3dmodel+database COBie No Test ? and Maximo RVT Yes Yes ? NWD Yes Yes ? Used also for the “BIM2Field” FBX No Yes ? Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 28
4 Conclusion Losinger Marazzi - d.chevarin ¦ buildingSMART at the new Limmattal hospital ¦ 23.06.2017 29