May 22, 2018 North American Growth Project Lakewood Civic Association Meeting This presentation includes forward-looking statements. Actual future conditions (including economic conditions, energy demand, and energy supply) could differ


slide-1
SLIDE 1

This presentation includes forward-looking statements. Actual future conditions (including economic conditions, energy demand, and energy supply) could differ materially due to changes in technology, the development of new supply sources, political events, demographic changes, and other factors discussed herein (and in Item 1A of ExxonMobil’s latest report on Form 10-K or information set forth under "factors affecting future results" on the "investors" page of our website at www.exxonmobil.com). This material is not to be reproduced without the permission of Exxon Mobil Corporation.

May 22, 2018

North American Growth Project

Lakewood Civic Association Meeting

slide-2
SLIDE 2
slide-3
SLIDE 3

This presentation includes forward-looking statements. Actual future conditions (including economic conditions, energy demand, and energy supply) could differ materially due to changes in technology, the development of new supply sources, political events, demographic changes, and other factors discussed herein (and in Item 1A of ExxonMobil’s latest report on Form 10-K or information set forth under "factors affecting future results" on the "investors" page of our website at www.exxonmobil.com). This material is not to be reproduced without the permission of Exxon Mobil Corporation.

May 22, 2018

Baytown Chemical Plant, Growth

Lakewood Civic Association Meeting

slide-4
SLIDE 4

Baker Rd Chemical Plant Olefins Plant Refinery →

  • Studying addition of two units
  • Baytown is a potential location
  • Construction 2019-21
  • 150 long term jobs
  • Permit application filed Nov’17
  • Considerations:
  • Minimize emissions / noise
  • Manage construction traffic
  • Community outreach
slide-5
SLIDE 5

ExxonMobil Pipeline Company

May 22, 2018

Nicolas Medina ExxonMobil Pipeline Company, Public and Government Affairs Manager

slide-6
SLIDE 6

ExxonMobil Pipeline Company in Baytown

  • Safety of our neighbors and personnel is our priority
  • Operator of crude, refined product and chemical pipelines
slide-7
SLIDE 7

Map

Bayway Dr,

slide-8
SLIDE 8
  • A risk-based approach to pipeline safety, required by federal regulation
  • Includes rigorous testing and analysis
  • Designed to identify areas that need repair or replacement

Integrity Management Program (IMP)

slide-9
SLIDE 9

Upcoming Baytown-area maintenance work

  • Early- to mid-2019: pipeline maintenance in Baytown and East Harris

County

  • Lakewood neighborhood: Replacement of about two miles of our

existing crude oil pipeline

  • Between I-10 and the northwest corner of our refinery fence
  • Identified through our Integrity Management Program for

replacement.

  • About 4-6 weeks to complete
slide-10
SLIDE 10

Timeline of maintenance activities

Early 2018

  • Surveys
  • Soil sampling

Mid-2018 – Early 2019

  • Final planning
  • Permitting
  • Temporary workspace

acquisition

  • Community outreach

Early/Mid-2019 – Fall 2019

  • Continued community
  • utreach
  • Mobilization
  • Field work, construction
  • Tie-in, testing
  • Startup

geotechnical bores safely completed at Slap Out Gully on March 23, 2018

slide-11
SLIDE 11

What to expect: Pipeline activities

slide-12
SLIDE 12
  • All of our pipelines will continue to be safely maintained and operated

in accordance with industry standards and all local, state and federal laws and regulations.

  • Through all stages of our work, ExxonMobil Pipeline Company will

make information available to the community about our work.

  • ExxonMobil Pipeline Company will consult with individual residents

regarding access to our easements on their property.

  • ExxonMobil Pipeline Company will seek to minimize disruption during
  • ur work and to limit inconvenience to community members.

Our commitment

slide-13
SLIDE 13

We value your comments …

ExxonMobil Pipeline Company values your comments and questions.

  • 1. Project representative with CLS, Brad Shillings: 806-367-1890 (cell)
  • 2. Public affairs hotline: 1 (888) 804-4788
  • 3. Email: public.awareness@exxonmobil.com
  • 4. Website coming soon
slide-14
SLIDE 14

Who do I Contact?

EMPCo Operations Control Center (24-hr Emergency line) 1-800-537-5200 EMPCo Public and Government Affairs Hotline 1-888-804-4788 public.awareness@exxonmobil.com

ALWAYS CALL 911 in an emergency.

Operations Control Center Houston, TX