1 Genesee & Wyoming Inc.
NRC Annual Conference
Hotel del Coronado, San Diego, CA
Genesee & Wyoming Railroad Services Inc.
January 7, 2020 Prepared by: Kristine Storm
NRC Annual Conference Hotel del Coronado, San Diego, CA Genesee - - PowerPoint PPT Presentation
NRC Annual Conference Hotel del Coronado, San Diego, CA Genesee & Wyoming Railroad Services Inc. January 7, 2020 Prepared by: Kristine Storm Genesee & Wyoming Inc. 1 Agenda 1. Overview 2. Operations & Infrastructure 3. Sale
1 Genesee & Wyoming Inc.
Hotel del Coronado, San Diego, CA
January 7, 2020 Prepared by: Kristine Storm
3 Genesee & Wyoming Inc.
4 Genesee & Wyoming Inc.
(90% North America; 10% Europe)
5 Genesee & Wyoming Inc.
Rail Operator with Key Real Estate at Ports and Inland Terminals; Offers Trains, Trucks & Storage
Long-Term Track Concession & Contracts
Serving 41 U.S. States, 4 Canadian Provinces, and Ports on All 3 Coasts
North America UK/Europe Australia
6 Genesee & Wyoming Inc.
| 12
Brookfield Infrastructure Partners (NYSE:BIP) and GIC
horizons perfectly aligned with the long lives of G&W’s railroad assets
7 Genesee & Wyoming Inc.
Safety We have an unconditional commitment to the well- being of our people and the safety of our
Integrity We possess the courage to do the right thing always Transparency We communicate openly to enable well-informed decision making Innovation We embrace creativity, technology and new ideas Service We have an absolute commitment to our customers based on a philosophy of mutual success Respect We treat all people with dignity and fairness, fostering diversity and inclusion Accountability We set high standards and take full ownership
individual and a team Excellence We have relentless focus on continuous improvement and excellence in all we do
8 Genesee & Wyoming Inc.
* G&W results include April 2015 acquisition of Freightliner Group
1 2 3 4 5
Class I Short Lines
Injury Frequency Rate per 200,000 Hours
9 Genesee & Wyoming Inc.
Trucking Other Railroads
5 6 7 8 9 10
2007 2009 2011 2013 2015 2017
10 Genesee & Wyoming Inc.
11 Genesee & Wyoming Inc.
Leverage of Spend
Single Procurement Unit ALL CAPITAL RUNS THRU THE G&W CENTRALIZED PURCHASING PROCESS
12 Genesee & Wyoming Inc.
is expected.
in September 2019 in support of the 2020 capital programs
Dec-19 thru Feb-20; South to North
13 Genesee & Wyoming Inc.
$89 $120 $179 $232 $249 $331 $372 $280 $288 $344 $348
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019B
(Capex In Millions)
14 Genesee & Wyoming Inc.
15 Genesee & Wyoming Inc.
Engineering design and construction 100% Switch & cross tie installation 30% Surfacing 30% Turnout installation and upgrades 100% CWR and jointed rail installation 100% Crossing Rehabilitations 90% Major bridge component upgrades 65% Signal installation, maintenance, and upgrades 90% Civil, earth & subgrade work 100% Locomotive Overhauls 15% Freight Car Repairs - RIP & LOR 50%
16 Genesee & Wyoming Inc.
17 Genesee & Wyoming Inc.
Genesee & Wyoming Inc. | 21
Winter
more snow clearing/de-icing
damage to structures Spring
summer leads to larger floods
Summer
increases risk of rail buckling / sun kinks
18 Genesee & Wyoming Inc.
30 washouts (10 major) totaling 57 days of main-line closures from May-August
19 Genesee & Wyoming Inc.
Bridge over a field
structure, replaced with 6 culverts
days later; thanks to Industrial Railways Company, Contech, Cal-Sierra Pipe.
21 Genesee & Wyoming Inc.
22 Genesee & Wyoming Inc.
Total (Units) Ties 1,000,000 Rail (Lineal Miles) 200 Surfacing (Track Miles) 2,000 Switches 75 Bridges $29 million Grade Crossing Rehabs 125 Signals (Crossing Warning Devices) 100+ New Track (Track Feet) 8,450 TF (1 siding, 1 yard expansion)
23 Genesee & Wyoming Inc.
Legend:
Rail – Linear Miles Ties – Each Surfacing – Track Miles Bridge - $’s
Rail - 4 Ties-175,000 Surfacing– 250 Bridge – $2.5M Rail - 83 Ties-175,000 Surfacing– 475 Bridge – $3.4M Rail – 7 Ties-65,000 Surfacing– 150 Bridge – $3.1M Rail - 41 Ties-225,000 Surfacing– 425 Bridge – $7.0M Rail – 30 Ties - 90,000 Surfacing – 225 Bridge – $3.5M Rail – 35 Ties-270,000 Surfacing– 475 Bridge – $9.5M
24 Genesee & Wyoming Inc.
loss (<10%)
initiative (strengthening program) & grants resulting in working 200+ addt bridges.
26 Genesee & Wyoming Inc.
Southern Coastal Northeast Midwest
27 Genesee & Wyoming Inc.
28 Genesee & Wyoming Inc.
29 Genesee & Wyoming Inc.
30 Genesee & Wyoming Inc.
31 Genesee & Wyoming Inc.
32 Genesee & Wyoming Inc.
33 Genesee & Wyoming Inc.
34 Genesee & Wyoming Inc.
35 Genesee & Wyoming Inc.
36 Genesee & Wyoming Inc.
37 Genesee & Wyoming Inc.
286k b/w Colorado State Line and Belleville, KS
38 Genesee & Wyoming Inc.
39 Genesee & Wyoming Inc.
– Material Distribution, Tie & OTM clean up, crossing support, etc
41 Genesee & Wyoming Inc.
including Europe
– 17 units, purchase upgrade (trade ins)
– 20 units, purchase upgrade (trade ins) – 10 units, EPA Tier 0+ Upgrade Kits
– 6 units, Tier 4 purchase – 22 units, purchase upgrade GP38-2’s (trade ins) locomotives improving the aged fleet. – 25+ units, EPA Tier 0+ Upgrade Kits
42 Genesee & Wyoming Inc.
12/31/20 Deadline looming.
server requirements, no wayside requirements
CORP, DGNO, LDRR, LRWN, MNA, OTVR, PNWR, PSAP and UTAH.
implemented across our system on those RR’s applicable.
43 Genesee & Wyoming Inc.
– Complete shop rebuild due to structural damage from Hurricane Michael
– Completion Preliminary Engineering on New Shop – New Locomotive Shop Facility Final Design, Build
– Completion Preliminary Engineering on New Shop
– Completion Preliminary Engineering on Shop Expansion
44 Genesee & Wyoming Inc.
the operations and recognizes the financial benefit.
45 Genesee & Wyoming Inc.
https://www.gwrr.com/suppliers
Tom Dutrieux
Director Locomotive Fuel & Lube Oil Vehicles
Vacant
Assistant Manager
Contract & PO Administration
Kristine Storm VP
Engineering Materials & Services Logistics Indirect Services
Bill Grove
Director Engineering Materials & Services
Alan Pettigrew
Manager
Mechanical Materials & Services
Richard Lutz
Manager
Mechanical Materials & Services
Allen Wengert
Manager
Engineering Services Contractor Management
Matt Seinfeld
Manager
Engineering Materials Contract & PO Administration
46 Genesee & Wyoming Inc.
Purchasing & Request for Proposals: – Kristine Storm, Alan Pettigrew, Bill Grove, Allen Wengert, Matt Seinfeld, Rich Lutz – Website (https://www.gwrr.com/suppliers)
Regional Vice Presidents of Engineering: – Western Region – Kenton Esbenshade – Southern Region – Dale Hanshew – Coastal Region – Ken Whisenant & Rob Myer – North East Region – Todd Dragland – Canada Region – Andre Lapalme – Midwest Region – Dale Summers – Australia – Tom Hampton (National Track Manager)
47 Genesee & Wyoming Inc.
– Western Region – Juan Mendoza – Southern Region – Brad Landers – Coastal Region – Kris Kempel – Northeast Region – Mike Collier – Canada Region – Daniel Vaillancourt – Midwest Region – Dale Bennett (West) or Chad Gibson (East)
48 Genesee & Wyoming Inc.
49 Genesee & Wyoming Inc.
Sharma & Associates Collins Engineering Auto Truck RELCO Locomotives Asplundh Reforestation Services HDR All American Ferrosafe GREX National Railway Equipment Co. Alfred & Benesh Co. Sperry Rail Service Industrial Railways Co. R&J Construction Holland Railstar Engineering H&S Engineering Patrick Engineering Balfour Beatty Aecom US Trackworks Track Services Railworks Road & Rail Tri-County Ready Mix Concrete Mountain States Contracting V&H Interrail CR Construction All American Track J-Track Hamilton H&H Engineering Construction Trak-Time Xorail Delta Atlas Frontier Ames Construction Koppers Midwest MO Nordco Progress Rail RJ Corman Hulcher Osage National Signal Bartlett & West LRL Construction GE / Alstom Custom Truck Asplundh Reforestation TCR Railroad Signal Services Progress Rail Siemens TEC Associates MidSouth Railway Signal Construction Musselman & Hall West Rail
50 Genesee & Wyoming Inc. Genesee & Wyoming Inc.
51 Genesee & Wyoming Inc.