Observations From The Instrumentation of a Micropiled and Tied Back Reticulated Grid Walter E. Vanderpool, P.E. Senior Geotechnical Engineer Terracon Consultants, Inc. Site: The C2K Theatre at the Palazzo 370 kN wall load at the
Site: The C2K
Theatre at the Palazzo
370 kN wall load
at the crest of a 15.3 m excavation
Theatre
construction concurrent with excavation and tower construction
Site excavation began
9/1/04
Theatre construction
began 11/25/04
Secant pile installation
began 12/6/04
Underpinning installed
12/11/04
Secant piling complete
12/16/04
Theatre structure frame
complete 3/14/05
- Reticulated group plan
- VW gauge locations
- Micropile locations
- Tieback locations
- Foundation shafts for
cantilevered tower
5 10 15 20 25 30 35 40 5 10 15 20 25 30 35 40 45 50 55 60 65
Easting (m) Northing (m)
Secant Piles Micropiles Bonded Tie Back VW Strain Gauge Inclinometer Piezometer Tower shafts
N
605 610 615 620 625 630 635 15 20 25 30 35 40 45 50 55 60
Viewing West Elevation (m MSL)
Secant Piles VW Strain Gauge Inclinometer Bonded Tie Back Mat Micropiles Piezometer
Northing (m)
SG 616.2 m FF 631.5 m
Caliche Layers
- Reticulated group profile
- VW gauge locations
- Micropile locations
- Tieback locations
- Reticulated tieback
intersections
- Cemented beds
- Piezometer location
- Relative top-drive hammer drilling resistance
- Measured by rate of advance
- Subjectively interpreted relative to geotechnical logging
Micropile, Relative Drilling Resistance, 1=very soft/loose, 3=very stiff/very dense and partially cemented, 5=strongly cemented
612 614 616 618 620 622 624 626 628 630 632 1 2 3 4 5
Drilling Resistance Rating Elevation (m MSL)
Relative Drilling Resistance, count=103
629.4 m MSL
Flush grout
injection drilling
VW strain gauge Insertion by
fiberglass rod
Inclinometer
at P1-015NS
Piezometer
at P1-013S
Cemented layer at
approximately elevation 626.5 m to 625 m MSL
Notch at tower
cantilever
Theatre wall
36.3 m - wide by 32 m - high by 457mm - thick
Carbonate
precipitate at tie- backs
Tower shaft group
at cantilever
- Micropile strain history
- VW strain gauge data record
- Installation 12/04 through
completion 1/06
- 1000
- 750
- 500
- 250
250 500 750 1000 1250 1500 1750 2000 2250 12/4/2004 0:00 1/29/2005 0:00 3/26/2005 0:00 5/21/2005 0:00 7/16/2005 0:00 9/10/2005 0:00 11/5/2005 0:00 12/31/2005 0:00 Date & Time Gauge Microstrain M4,17 Curing M6, 6 M4, 10 M8, 2 M2, 8 M4, 17 M1, 11 Mat Fill Placed Theatre Construction M1,5
- Initial tension during curing and
excavation to subgrade 12/11/04 – 12/18/04
- Mat placement 12/24
- Theatre construction
1/05 – 3/05
- Fill placement
3/14/05 – 3/20/05
- 200
- 180
- 160
- 140
- 120
- 100
- 80
- 60
- 40
- 20
20 40 60 12/9/2004 0:00 12/23/2004 0:00 1/6/2005 0:00 1/20/2005 0:00 2/3/2005 0:00 2/17/2005 0:00 3/3/2005 0:00 3/17/2005 0:00 3/31/2005 0:00 4/14/2005 0:00
Date & Time Gauge Microstrain M6, 6 M4,17 M1, 5 M1, 11 M2, 8 M8, 2 M4, 17 Grout Curing (see Figure 9) Mat Fill Placed Mat Placed Wall Construction (see Figure 10)
- Forming and concrete placement load/unload at interior
location on mat
- 72
- 71
- 70
- 69
- 68
- 67
- 66
2/9/2005 18:00 2/10/2005 6:00 2/10/2005 18:00 2/11/2005 6:00 2/11/2005 18:00 2/12/2005 6:00 Date & Time Gauge Microstrain
M4, 17
- Tieback stressing effects
- 15 Tiebacks at Level -1 stressed
90 95 100 105 110 5/19/2005 5:00 5/19/2005 7:00 5/19/2005 9:00 5/19/2005 11:00 5/19/2005 13:00 5/19/2005 15:00 Date & Time Gauge Microstrain
M2, 8
- Inclinometer data record
- Weekly record 4/05 to 8/05 and 2/06
- Hourly data by IPI
system 8/05 – 12/05 not included
- Piezometer data record
12/04 – 1/06
- Head rise during tieback grouting
- Head drop during drilled shaft
construction
Secant Pile P1- 013,S 608 610 612 614 616 618 620 622 624 626 628 630 632 634 11/9/2004 0:00 1/4/2005 0:00 3/1/2005 0:00 4/26/2005 0:00 6/21/2005 0:00 8/16/2005 0:00 10/11/2005 0:00 12/6/2005 0:00
Date and Time Groundwater head (m)
Head (m MSL)
- O. G. 630.3 m
- S. G. 616.2 m
- F. F. 631.5 m
Tieback Grouting (see Figure 14) Shaft Drilling
- Tieback grout placement at Level – 2
Secant Pile P1- 013, S
615.0 615.5 616.0 616.5 617.0 617.5 618.0 618.5 619.0 619.5 620.0 7/1/2005 11:00 7/1/2005 12:00 7/1/2005 13:00 7/1/2005 14:00 7/1/2005 15:00 7/1/2005 16:00 7/1/2005 17:00
Date and Time Groundwater head (m MSL)
Head (m MSL)
Elastic Analyses vs. Observations
- Boussinesq elastic analyses by superposition
- Instrumented micropile locations and depths
- 250
- 200
- 150
- 100
- 50
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 Depth (D/B) - D/B 0=629.3 m MSL, D/B 2=609.1 m MSL Vertical Stress (kPa) M1,5 M2,8 M4,17 M8,2 M6,6 M1,11 Embedded strain gauge depths (D/B) 14.8 m 2.7 m 2.7 m 36.3 m 4.9 m B=10.1 m 30.8 m Excavation subgrade 616.2 m MSL Secant pile tip elevation 610.1 m MSL
PLAN (sketch)
Row M1 Row M8 Line 1 Line 22 M6,6 M4,17 M8,2 M1,17 M5,1 M2,8
Ground/Micropile Load Sharing Pre-Excavation, April 1, 2004
17.1 % 5.62
- 33.4
- 30.26
0.8 0.58 M6,6 11.8 % 5.64
- 49.4
- 32.94
0.5 0.37 M4,17 10.9 % 5.64
- 43.3
- 26.55
0.8 0.60 M4,10 47.0 % 2.70
- 50.9
- 64.71
0.5 0.47 M8,2 16.6 % 4.18
- 72.0
- 50.00
0.5 0.30 M2,20 28.1 % 3.70
- 67.3
- 69.93
0.5 0.30 M2,14 5.6 % 3.70
- 67.4
- 14.02
0.5 0.30 M2,8 73.2 % 2.02
- 34.0
- 50.32
1.1 0.66 N2,2 50.4 % 1.96
- 43.2
- 42.62
0.8 0.57 M5,1 50.9 % 1.62
- 58.7
- 55.05
0.5 0.30 M1,17 88.3 % 1.62
- 36.7
- 52.41
1.1 0.66 M1,11 37.6 % 1.62
- 67.5
- 41.08
0.5 0.30 M1,5 Stress Ratio % Tributary Area (m^2) Boussinesq Stress (kPa) 4/1/05 Load (kN) D/B D/L Location
37.6% to 88.3%
at perimeter
5.6% to 73.2% at
1st interior row
10.9% to 11.8%
near middle of mat (row 4)
17.1% at back
edge of mat (row 6)
Prior to stressing
Ground/Micropile Load Sharing Post Construction January 31, 2006
139.5 %* 5.62
- 33.4
261.76 0.8 0.58 M6,6 11.4 % 5.64
- 49.4
- 31.71
0.5 0.37 M4,17 83.0 %* 5.64
- 43.3
201.22 0.8 0.60 M4,10 184 % * 2.70
- 50.9
252.84 0.5 0.47 M8,2 29.0 % 4.18
- 72.0
- 87.14
0.5 0.30 M2,20 79.6 % 3.70
- 67.3
- 198.27
0.5 0.30 M2,14 6.7 % 3.70
- 67.4
- 16.60
0.5 0.30 M2,8 86.1 2.02
- 34.0
- 59.43
1.1 0.66 N2,2 66.4 % 1.96
- 43.2
- 56.18
0.8 0.57 M5,1 26.6 % 1.62
- 58.7
- 25.22
0.5 0.30 M1,17 115.5 % 1.62
- 36.7
- 68.56
1.1 0.66 M1,11 20.8 % 1.62
- 67.5
- 22.77
0.5 0.30 M1,5 Stress Ratio % Tributary Area (m^2) Boussinesq Stress (kPa) 1/31/06 Load (kN) D/B D/L Location
After tieback
stressing
20.8% to 115.5%
at perimeter
6.7% to 184%
(tension) at 1st interior row
11.4% to 83.0%
(tension) near middle of mat (row 4)
139.5% (tension)