Off the grid: The reliable transition to renewable energy James Harman, CEO Australian Energy Week | 13 June 2019 Global operations EDL is a leading global producer 1 Canada of sustainable distributed energy 11 59 10 UK 27 63 991MW |


slide-1
SLIDE 1

Off the grid: The reliable transition to renewable energy

James Harman, CEO Australian Energy Week | 13 June 2019

slide-2
SLIDE 2

A wo rld o f ne w e ne rg y

2

Global operations

Div Diversifie ified asset p por

  • rtfolio

folio

355MW

landfill gas

299MW

remote energy

288MW

waste coal mine gas

49MW

renewables

Australia

713

MW

12

MW

Greece

UK

63

MW

USA

192

MW Canada

11

MW

EDL is a leading global producer

  • f sustainable distributed energy

991MW | 98 power stations | 5 countries

27 1 10 1 59

21.8 TJ/day

gas delivery (LNG/CNG/LFG) Number of power stations

slide-3
SLIDE 3

A world of new energy

Perth Kalamunda Red Hill Tamala Park Hill 60 Hill 50 Leonora Menzies Gascoyne Junction Darlot Laverton Sunrise Dam Karratha Bidyadanga Broome Beagle Bay Djarindjin Ardyaloon Derby Fitzroy Crossing Looma Halls Creek Warmun Pine Creek Yulara McArthur River Cannington Coober Pedy Wingfield Broadmeadows Brooklyn Corio Berwick Clayton Springvale Wonthaggi Belconnen Cullerin Range Mugga Lane Lucas Heights Belrose, Grange Av Teralba Jacks Gully Eastern Creek Glennies Creek Brown Plains Brisbane Grosvenor Moranbah North Weipa

3

Div Diversifie ified asset p por

  • rtfolio

folio

713MW 59

assets

KEY Waste coal mine gas Remote energy LNG / CNG Landfill gas Renewables Office

77MW

landfill gas

288MW

waste coal mine gas

299MW

remote energy

49MW

renewables

EDL owns and operates 59 power stations in clean and remote energy across Australia. Our global headquarters is in Brisbane, Queensland.

German Creek Oaky Creek Appin, Tower Tahmoor

Australian operations

slide-4
SLIDE 4

A world of new energy 4

KEY Remote energy LNG/CNG Hybrid renewables

  • Powering off-grid remote communities and

industries for 30 years

  • Fuelled with natural gas and/or diesel
  • Since 2017, grown to include three hybrid

renewable assets: − Coober Pedy Renewable Hybrid Project − Cannington Power Station − Agnew Renewable Hybrid Project, under construction.

EDL’s remote energy assets

Hill 60 Hill 50 Leonora Menzies Gascoyne Junction Darlot Laverton Sunrise Dam Karratha Bidyadanga Broome Beagle Bay Djarindjin Ardyaloon Derby Fitzroy Crossing Looma Halls Creek Warmun Pine Creek Yulara McArthur River Cannington Coober Pedy Agnew

slide-5
SLIDE 5

A world of new energy 5

Drivers of the transition to renewable energy

Decr creas asing ng cos costs of renewable energy technologies Soci Social al sus ustai ainabi nability y im impera erativ ives es to reduce emissions Price vol volat atility y of

  • f

tradi aditiona

  • nal fue

uel sources Pot

  • tent

ntial al cos cost savi avings ngs for operation/project Execution of Pa Paris ris Agreem reemen ent in 2016

Reliability En Energy y tri rilem emma

slide-6
SLIDE 6

6

Coober Pedy Renewable Hybrid Project

1MW MW A AC so sola lar 4MW w wind ge d generat ation

  • n

3.9M 3.9MW di diesel ge generat ation 1.4 .4MW av avg, g, 3.4 3.4MW pe peak ak 3M 3MW dyn ynami mic resist sistor 1.7MVA VA fly lywh wheel/ l/ DUP DUPS 1MW/ / 500k 500kWh battery ry stor

  • rage

age

slide-7
SLIDE 7

A wo rld o f ne w e ne rg y

Coober Pedy Renewable Hybrid Project

7

73%

ave renewable energy contribution

8GWh

p.a. of renewable electricity

99.995%

reliability in FY18

99.999%

reliability in FY19 to date (31 mins/345 days unplanned outage)

Project o t outc tcome mes Period iod Year ar Unp nplanned nned o

  • ut

utages es Number Duration Pre re- hybrid idis isation ion FY15 4 3.5 hours FY16 5 1.1 hours FY17 4 4.2 hours Ave. 4.3 2.9 hours Post- hybridisation FY18 4 0.47 hours

>2,100,000 litres

p.a. reduction in diesel consumption

81 hours

longest uninterrupted period at 100% renewable supply (Dec 2018)

slide-8
SLIDE 8

A wo rld o f ne w e ne rg y

8

Cannington Power Station

Initially commissioned as a diesel power station for South32’s Cannington mine, the facility was upgraded to a primarily gas-fired power station in 1999. EDL recently commissioned a 3MW solar farm to integrate with existing power station. At a gl a glan ance

3MW

solar generation

2018

upgraded to hybrid renewable

35MW

gas capacity

5MW

diesel capacity

slide-9
SLIDE 9

9

Agnew Renewable Hybrid Project

  • Greenfields energy solution for

a remote mining operation

  • 10 year PPA
  • Current supply:

− neighbouring mine’s transmission line – 12MW − diesel hire sets – 6MW. This project will provide the mine with gr great ater t than an 5 50% % renew enewable ener e energy over the long term, wit ithou

  • ut c

com

  • mprom
  • mis

isin ing pow

  • wer q

qualit lity or

  • r relia

liabilit ility.

slide-10
SLIDE 10

Agnew Renewable Hybrid Project

In an Australian first, the project will utilise wind generation as part of a large hybrid microgrid in the mining sector.

5

wind turbines

18MW

wind generation

23MW

power station inc 16MW gas and 3MW diesel gen. and 4MW PV solar

St Stage age 1 1

4MW

PV solar

13MW

battery

St Stage age 2 2

slide-11
SLIDE 11

Hybrid technologies manage r relia liabilit ility ris isk and facilitate e hi higher her p penet enetration o n of r renew enewable ener e energy

The transition to renewables

ARE NA-suppo rte d re ne wa b le e ne rg y pro je c ts

  • Sa nd fire , Co o b e r Pe d y
  • We ipa
  • Ca nning to n

L

  • w pe ne tra tio n

pro je c ts c o mme rc ia lly via b le

  • Pro je c t X 23 MW the rma l +

4MW PV so la r (g re e nfie ld )

  • Gra nny Smith 8MW PV

so la r (b ro wnfie ld )

RE pe ne tra tio n inc re a se s

  • >50% re ne wa b le pro je c ts

will b e d e ve lo pe d

  • Amo unt o f ARE

NA fund ing ne e d e d fo r hyb rid re ne wa b le pro je c ts will d e c re a se

Hig h pe ne tra tio n o f re ne wa b le s >75%

  • Hyd ro g e n (pro d uc e d

fro m spill re ne wa b le s) use d a s fue l

  • Use o f e ne rg y sto ra g e

inc re a sing , with re d uc e d d e pe nd e nc e o n the rma l fue ls

  • Ze ro d ie se l ta rg e t

Now Now 2019 19–20 2020 20 2018 18 Fu Futu ture

slide-12
SLIDE 12

12 12

Oppo rtunitie s a he a d

A world of new energy

The path ahead

  • Moving forward, we see high penetration

renewables playing an increasing role.

  • Remote hybrid renewables market around

1GW, $2 billion capital.

  • EDL can play a leading role addressing the

energy transition in off-grid and edge of grid applications: − transition fossil fuel-powered remote communities and mines to high penetration renewable generation − partner with networks to develop and run microgrids.

  • Take-up influenced by scale of mechanisms

that encourage fossil fuel displacement.

slide-13
SLIDE 13

Thank you

edlenergy.com