Office of Water Project Review And the Deep Draft Navigation - - PowerPoint PPT Presentation

office of water project review and the deep draft
SMART_READER_LITE
LIVE PREVIEW

Office of Water Project Review And the Deep Draft Navigation - - PowerPoint PPT Presentation

Office of Water Project Review And the Deep Draft Navigation Planning Center of Expertise US Army Corps of Engineers 1 Civil Works Project Delivery Process Step 1 Step 2 Step 3 Step 4 Step 5 Initial Problem Congressional Study Initial


slide-1
SLIDE 1

1

Office of Water Project Review And the Deep Draft Navigation Planning Center of Expertise US Army Corps of Engineers

slide-2
SLIDE 2

Civil Works Project Delivery Process

Step 10

Division Engineer's Transmittal Letter

Step 6

Negotiate PMP and FCSA

Step 1

Initial Problem Identification

Step 18

Congress Appropriates Construction Funds

Step 19

Execute PPA

Step 20

Project Construction

Step 15

Execute PED Agreement

Step 11

Washington Level Policy Review

Step 7

Execute FCSA & Request Feasibility Funds

Step 2

Congressional Study Resolution/Authorization

Step 16

Conduct PED

Step 12

Chief of Engineers Report

Step 8

Conduct Feasibility Study

Step 3

Initial Study Funding

Step 21

OMRR&R

Step 17

Draft PPA Review/Approval

Step 13

Administration Review

Step 14

Project Authorization

Step 9

Complete Final RPT. for Coord. & Submission

Step 4

Conduct Reconnaissance Study

Step 5

Certify Reconnaissance Phase

slide-3
SLIDE 3

“ DESIGN AGREEM ENT” M

  • del

FED Project Authorization

( from Step14)

Y es?

District Approval

HQUSACE

No?

Non-Fed

Civil W

  • rks Project Delivery- “An Overview”

Approval PED–Preconstruction Engineering & Design

Cost shared at the sam e rate as construction

slide-4
SLIDE 4

Preconstruction Engineering & Design Plans & Specs. EDD’s

PED:

Finalize detailed engineering & design to ready project for construction Prepare plans & specs. for first construction contract

Usually 2 years District Approval Authority

Contract Docs.

Civil W

  • rks Project Delivery- “An Overview”

GI Funds

EDD–Engineering Design Docum entation

Safety Assurance Review–Flood & Storm Projects

  • Sect. 2035 W

RDA 2007

slide-5
SLIDE 5

Draft PP A Package

RIT

Deviations Legal Certification Checklist

Financial Anal.

Decision Docum ent Approved?

  • Const. Funds-

Budgeted ? Added ?

Guidance:

EC 1165-2-204, dated 31 July 1997

ASA(CW ) Approval

 Status–see Plan

& Policy Hom e Page

 Usually 60-day

review tim e.

Draft PP A

Civil W

  • rks Project Delivery- “An Overview”

PP A–Project Partnership Agreem ent

slide-6
SLIDE 6

President’s Budget ( CG )

HQUSACE DIVISION

CW

  • B

Coordination Budget EC J-Sheets “Energy & Water Development Appropriations” Construction General (CG) Funds

Civil W

  • rks Project Delivery- “An Overview”
slide-7
SLIDE 7

Draft PP A Approved ( from Step 17) Initiate Construction

PP A

Civil W

  • rks Project Delivery- “An Overview”

PP A–Project Partnership Agreem ent

slide-8
SLIDE 8

Project Cost Sharing by Project Purpose

FLOOD RISK MANAGEMENT NA VIGA TION 65%-Federal 35%- Non-Federal ECOSYSTEM RESTORA TION RECREA TION 65%-Federal 35%- Non-Federal 50%-Federal 50%- Non-Federal

Inland: 50%- Federal 50%- T rust Fund Deep Draft: (see above) Deep Draft Navigation Depth Cost Share < 20 ft. 90%- Fed 10%- NF * 20- 45 ft. 75%- Fed 25%- NF * > 45 ft. 50%- Fed 50%- NF * Service Facilities 100%- NF * Plus an additional 10%

  • f

General Navigation Features if not

  • ffset byLERRs

Civil W

  • rks Project Delivery- “An Overview”

CG Funds

slide-9
SLIDE 9

If budgeting for a new PED start, the approval date of the latest econom ic analysis m ust not precede the date of the MSC budget subm ission date by m

  • re than 3 years.

If PED is continuing, the date of approval of the latest econom ic analysis m ust not precede the M SC budget subm ission date by m

  • re than 5 years.
slide-10
SLIDE 10

Level 1–Reaffirm ation

  • Qualitative analysis affirm

s that all previous benefits are still valid Level 2–Benefit Update

  • Som

e quantitative analysis is needed for benefits, but no m ajor changes Level 3–Econom ic Reevaluation

  • Conditions, Econom

ics and Engineering have changed so significantly that full reanalysis is warranted Level 4–General Reevaluation

  • Scope is beyond an econom

ic update (new Plan Form ulation)

slide-11
SLIDE 11

Work in Kind under Section 221 of the Flood Control Act of 1970 Contributed Funds/Advanced Funds Section 408 Submittal under 33 USC 408