1 TSX-V: F
P a n M i n e a n d G o l d R o c k E x p l o r a t i o n P r o - - PowerPoint PPT Presentation
P a n M i n e a n d G o l d R o c k E x p l o r a t i o n P r o - - PowerPoint PPT Presentation
P a n M i n e a n d G o l d R o c k E x p l o r a t i o n P r o j e c t , W h i t e P i n e C o u n t y, N e v a d a TSX-V: F 1 Pan Mine and Gold Rock Favorable Location within Prolific Battle Mountain-Eureka Mineral Trend TSX-V: F
SLIDE 1
SLIDE 2
2 TSX-V: F
Pan Mine and Gold Rock
Favorable Location within Prolific Battle Mountain-Eureka Mineral Trend
SLIDE 3
3 TSX-V: F
PAN MINE
North Pit – Primarily Silicified Ore Source
- Crusher and leach pad blend of argillic and silicified materials for proper percolation, stability, and
recovery
- North Pit material leaches slower and is very abrasive
SLIDE 4
4 TSX-V: F
PAN MINE
South Pit – Primary Argillic Ore Source
- South Pit material is soft, drills easily, and tends to have higher recoveries
SLIDE 5
5 TSX-V: F
PAN MINE
Crusher Added to Circuit in Spring of 2019
SLIDE 6
6 TSX-V: F
Pan Mine Reserves and Resources 2019
- Pan Resource Update Completed in late 2018 by SRK.
- 2019 Resource Enhancement due to early 2018 Drilling
Program of Near Mine Targets (71 holes, 28,730 feet, all RCR)
Pan Resource 2018 Resource Tonnes Grade Grade Contained Metal
(incl. reserve)
(000s) (g/t) OPT
(Au oz) Measured 6,031 0.6 0.018 117,000 Indicated 21,578 0.45 0.013 315,000 Measured + Indicated 27,609 0.49 0.014 432,000 Inferred 7,580 0.45 0.013 110,000
SLIDE 7
7 TSX-V: F
Pan Mine
Favorable Geologic Setting in Devonian to Permian Carbonate-Clastic Sequence
SLIDE 8
8 TSX-V: F
Pan Mine
- Gold Mineralization is controlled locally by the high angle
Branham Fault Zone (BFZ), and secondarily by favorable lithologies adjacent to the fault zone.
- Specifically, solution breccia (SBX) and silicified breccia within
the BFZ in the lower Pilot Shale, near the Pilot-Devils Gate contact is a favored mineralization focus in North Pan.
- At South Pan, the ore is typically heavily argillized and less
silicified within the BFZ. Ore may occur in the Devil’s Gate or Pilot Shale, but always near the BFZ.
- Ore from North Pan is ‘blended’ with South Pan ore at the
leach pad to enhance permeability and recovery.
SLIDE 9
9 TSX-V: F
Pan Mine Geology
SLIDE 10
10 TSX-V: F
Pan Mine Geology and Mineralization
North Pan Conceptualized Cross Section
SLIDE 11
11 TSX-V: F
Pan Mine Geology and Mineralization
South Pan Conceptualized Cross Section
SLIDE 12
12 TSX-V: F
Pan Mine, North Pit
Discovery Outcrop ‘Campbell Jasperoid’ in Foreground
SLIDE 13
13 TSX-V: F
Pan Mine - North Pit
Viewing northward along strike of BFZ
SLIDE 14
14 TSX-V: F
Pan Mine Exploration Potential - 2019
Exploration Opportunities at Pan are Classified as 1.Near Mine –Development, and 2.Expansion or Property Targets (exploration targets identified within the property boundary).
SLIDE 15
15 TSX-V: F
Pan Mine Exploration Potential - 2019
Limited exploration drilling in 2018 grew reserves and extended mine life. Many of these areas indicate additional resource is available for definition by subsequent drilling phases.
SLIDE 16
16 TSX-V: F
Pan Mine Exploration Potential - 2019
Cross section through Campbell Ridge (Near Mine Development Target) Showing positive 2018 results and open ended resource to West.
SLIDE 17
17 TSX-V: F
Pan Mine Exploration Potential - 2019
3D Perspective of Pan Pit Design and Existing Drilling
SLIDE 18
18 TSX-V: F
Pan Mine Exploration Potential - 2019
Several other, favorable, ‘Near Mine’ targets have been identified at Pan. Additional Pan ‘Near Mine’ Targets
SLIDE 19
19 TSX-V: F
Pan Mine Exploration Potential - 2019
Pan 2019 Proposed Development Targets
SLIDE 20
20 TSX-V: F
Pan Mine Exploration Potential - 2019
Pan 2019 Proposed Development Targets
SLIDE 21
21 TSX-V: F
Pan Mine Exploration Potential - 2019
Pan Mine - ‘Property’ Exploration Targets ‘Property’ Targets have been identified by favorable geology, structure, and/or surface geochemistry.
SLIDE 22
22 TSX-V: F
Gold Rock Exploration Overview 2019
Gold Rock Project is Located Approximately 8 km Southeast of Pan Mine
SLIDE 23
23 TSX-V: F
Gold Rock Exploration Overview 2019
Gold Rock Highlights
1037 Mining Claims Approximately 25,600 acres
First Claims Located in 1979 Mining at Easy Jr. started in 1989 and continued sporadically until 1996 bankruptcy. Total Historical Production 52,400 ounces of gold from Easy Jr. pit Resource Update in 2018 Approximately 420k ounces Au in Indicated and Inferred Fiore completed 8 Holes in 2018 Targeted 3 outlying exploration areas. Encountered anomalous Au mineralization and confirmed target concepts. Exploration drilling was not designed to enhance known resource. Mine Permit ROD issued in 2018 Mining Permit includes Exploration disturbance of 392 acres (76.7 used to date) Numerous Exploration Targets Targets defined by favorable geology, structure and anomalous surface sampling. Limited drilling, sometimes no drilling.
SLIDE 24
24 TSX-V: F
Gold Rock Exploration Overview 2019
Gold Rock Stratigraphy - Similar to Pan, but different Host Gold Primarily in Joana Limestone and overlying Chainman Shale
SLIDE 25
25 TSX-V: F
Gold Rock Exploration Overview 2019
Gold Rock Geology Overview
SLIDE 26
26 TSX-V: F
Gold Rock Exploration Overview 2019
Resource Area Geology
SLIDE 27
27 TSX-V: F
Gold Rock Exploration Overview 2019
North Highwall EZ JR Pit -EZ Anticline in Joana Limestone
SLIDE 28
28 TSX-V: F
Gold Rock Exploration Overview 2019
NI 43-101 Resource Update Completed in 2018
Gold Rock Updated Resource 2018 Category Tonnes Gold Grade g/t* Gold Grade
- z/st*
Contained Gold oz Indicated 9,006,900 0.82 0.024 238,700 Inferred 7,787,500 0.72 0.021 180,900 *cut off grade of 0.02 oz/st
SLIDE 29
29 TSX-V: F
Gold Rock Exploration Overview 2019
North and South Resource Areas Separated by Region with Similar Geology and on Structural Trend, but limited Drilling
SLIDE 30
30 TSX-V: F
Gold Rock Exploration Overview 2019
2019 Phase 1 Development Drill Plan
SLIDE 31
31 TSX-V: F
Gold Rock Exploration Overview 2019
Resource Model Identifies Areas of Potential Resource Addition by Infill
- Drilling. Legacy Drilling did not fully delineate Mineralization
SLIDE 32
32 TSX-V: F
Gold Rock Exploration Overview 2019
2019 Phase 1 Development Drill Plan
SLIDE 33
33 TSX-V: F
Gold Rock Exploration Overview 2019
Exploration Targets Identified by Favorable Geology along Structural Trend and Anomalous Soil and Rock Geochemistry
SLIDE 34
34 TSX-V: F
Gold Rock Exploration Overview 2019
Three Target Areas were drill tested in 2018. Target Concepts were
- validated. Mineralization was encountered at the expected structural
and stratigraphic domains.
Hole ID Target Area From (ft) To (ft) Interval (Ft)* Au oz/ton GR18-01 Laura Hill 85 90 5 0.009 GR18-02 Laura Hill No significant value GR18-03 Laura Hill 50 60 10 0.007 GR18-04 Jasperoid Creek 250 290 40 0.020 GR18-04 Jasperoid Creek 300 320 20 0.010 GR18-04 Jasperoid Creek 595 615 20 0.008 GR18-05 Jasperoid Creek 375 385 10 0.005 GR18-06 Jasperoid Creek No significant value GR18-07 Monte HW 5 90 85 0.006 GR18-08 Monte HW 20 75 55 0.005
SLIDE 35
35 TSX-V: F
Gold Rock Exploration Overview 2019
Mineralization Characterized by Strong NNE Structural Trend – Anticlinal Axis and High Angle Faults along Limbs. Trace of NNE Structure typified by Anomalous Gold Values in Soils and Rock Chips
SLIDE 36
36 TSX-V: F
Gold Rock Exploration Overview 2019
Gold in Soils Define NNE and Parallel Structural Trend
SLIDE 37
37 TSX-V: F