P ar kland E asement P r oposal B etsy Caughli n Donnelly P - - PowerPoint PPT Presentation

p ar kland e asement p r oposal b etsy caughli n donnelly
SMART_READER_LITE
LIVE PREVIEW

P ar kland E asement P r oposal B etsy Caughli n Donnelly P - - PowerPoint PPT Presentation

P ar kland E asement P r oposal B etsy Caughli n Donnelly P ar k Washoe County Ope n Spac e and Re gional Par k Commission June 2, 2020 R equest 1. Ame nd an e xisting se we r line e ase me nt to allow for the installation


slide-1
SLIDE 1

P ar kland E asement P r

  • posal

B etsy Caughli n Donnelly P ar k

Washoe County Ope n Spac e and Re gional Par k Commission June 2, 2020

slide-2
SLIDE 2

R equest

1. Ame nd an e xisting se we r line e ase me nt to allow for the installation of additional utility line s 1. Gr ant a stor mwate r dr ainage fac ilitie s e ase me nt

slide-3
SLIDE 3

Backgr

  • und

Betsy Caughlin Donnelly Park Applicant’s Property

slide-4
SLIDE 4

Backgr

  • und
slide-5
SLIDE 5

Sewer L ine E asement Amendment

slide-6
SLIDE 6

Stor mwaterDr ainage F acilities E asement

slide-7
SLIDE 7

Alter natives Analysis

  • Or

iginal Pr

  • posal: T

hr e e (3) stor mwate r disc har ge points

  • Alte r

native 1: Connect to the municipal stor m system

  • Ci

ty of R eno’s Hi stor i c R esour ces Commi ssi

  • n condi

ti

  • ned the r

e- development pr

  • ject based on thei

r “L

  • w I

mpact Desi gn” standar ds

  • Stor

mwat erflows must be mai ntai ned on si te

  • Alter

native 2: One (1) stor mwate r disc har ge point

  • Route all stor

mwate r flows into the de te ntion basin

slide-8
SLIDE 8

P r

  • posed Mitigation
  • Applic ant to pr
  • vide e le c tr

ic al and wate r line s to se r ve the par k

  • Applic ant is ope n to ame nding the e xisting de e d

r e str ic tion

slide-9
SLIDE 9

R ecommendation

  • Staff is suppor

tive

  • f the pr
  • pose d

e ase me nt, e ase me nt ame ndme nt, and and mitigation

slide-10
SLIDE 10