Participant Conduct Policy Charles Berardesco, Senior Vice President - - PowerPoint PPT Presentation

participant conduct policy
SMART_READER_LITE
LIVE PREVIEW

Participant Conduct Policy Charles Berardesco, Senior Vice President - - PowerPoint PPT Presentation

Participant Conduct Policy Charles Berardesco, Senior Vice President and General Counsel Mark Lauby, Senior Vice President and Chief Reliability Officer Member Representatives Committee Meeting February 6, 2019 Participant Conduct Policy


slide-1
SLIDE 1

Participant Conduct Policy

Charles Berardesco, Senior Vice President and General Counsel Mark Lauby, Senior Vice President and Chief Reliability Officer Member Representatives Committee Meeting February 6, 2019

slide-2
SLIDE 2

RELI ABI LI TY | ACCOUNTABI LI TY 2

  • Derived from policies used by Operating Committee and

standards development teams

  • Applies to all participants in NERC activities
  • Includes four sections:
  • General purpose
  • Policy
  • Restrictions on participation
  • NERC email list use

Participant Conduct Policy Overview

slide-3
SLIDE 3

RELI ABI LI TY | ACCOUNTABI LI TY 3

  • Promote efficient use of participants’ time
  • Maintain a professional and constructive work environment
  • Clarify expectations for participants

General purpose

slide-4
SLIDE 4

RELI ABI LI TY | ACCOUNTABI LI TY 4

  • 1. Conduct yourself in a professional manner
  • 2. Do not use NERC activities for commercial or private purposes
  • 3. Do not distribute Confidential Information
  • -“Confidential Information” is defined in Rules of Procedure Section 1500
  • 4. Do not distribute work product if distribution is prohibited
  • -E.g., document is labeled “embargoed”, “do not release”, or

“confidential”, among other similar labels

Policy

slide-5
SLIDE 5

RELI ABI LI TY | ACCOUNTABI LI TY 5

  • Receive reminder to comply with Participant Conduct Policy
  • May be asked to leave the meeting or teleconference
  • May be permanently restricted from NERC activities
  • NERC notifies employer of permanent restriction
  • NERC General Counsel can review written requests to remove restriction

Restrictions on Participation

slide-6
SLIDE 6

RELI ABI LI TY | ACCOUNTABI LI TY 6

  • Listserv topics are limited to group’s scope of work
  • Anti-competitive behavior is prohibited
  • Personal views prohibited unless relevant to group’s scope of

work

  • Offensive, abusive, or obscene language not permitted

NERC Email List Use

slide-7
SLIDE 7

RELI ABI LI TY | ACCOUNTABI LI TY 7

slide-8
SLIDE 8

Special Reliability Assessment Development

James Merlo, Vice President, Reliability Risk Management Member Representatives Committee Meeting February 6, 2019

slide-9
SLIDE 9

RELI ABI LI TY | ACCOUNTABI LI TY 9

  • The ability to perform Special Reliability Assessments called for

in Rules of Procedure

  • NERC leverages technical committees to support development
  • Topics generally based on findings from the Long-Term

Reliability Assessment that require a “deeper dive”

  • Seeking input from MRC provides front-end guidance as topics

are selected for further assessment Special Assessments

slide-10
SLIDE 10

RELI ABI LI TY | ACCOUNTABI LI TY 10

Updated 2017 Special Assessment Topics Based on MRC Policy I nput

  • Reliability Value of Baseload Generation and Implications of

Accelerated Retirements

  • Contingency Response of DER and Other Inverter-Based

Resources

  • Changing Resource Mix on Reserves, Forecasting, and Resource

Adequacy

  • Changing End-Use Load Characteristics and Dynamic Load

Modeling

slide-11
SLIDE 11

RELI ABI LI TY | ACCOUNTABI LI TY 11

  • Potential topic for 2019 Special Reliability Assessment
  • Integration of significant amounts of battery storage
  • Request for MRC policy input
  • Does the MRC support this potential topic for a 2019 Special Reliability

Assessment?

  • Are there any additional topics that should be considered for future

Special Reliability Assessments and, if so, what is their relative priority?

Questions in Policy I nput Letter

slide-12
SLIDE 12

RELI ABI LI TY | ACCOUNTABI LI TY 12

  • Integration of Large Amounts of Energy Storage and Micro-Grids
  • Valuable for NERC to evaluate policies and develop guidelines
  • Supported by aggressive state goal; key resilience component
  • Important, but lower priority and possibly premature (some non-supportive)
  • Leverage existing working groups working through reliability challenges

Technical challenges include:

  • Lack of accurate simulation models
  • Identification of amount and locations
  • Operating parameters and modes
  • Restoration capability and coordination
  • Potential for devices on distribution system to be in conflict with wider-system

needs

  • Alternative Approaches
  • Develop technical references and reports through the SPIDER WG
  • Use technical committees to define and vet the proposed topic and scope
  • Develop special assessment upon completion of the technical work more oriented

to policy makers and industry leaders

Policy I nput Comments

slide-13
SLIDE 13

RELI ABI LI TY | ACCOUNTABI LI TY 13

  • Contingency response for DER and other inverter-based

resources

  • Changing end-use load characteristics and dynamic load

modeling

  • Capacity value for generation with non-firm fuel
  • Transmission end-of-life
  • Resilience impacts and lessons learned for severe weather

events

  • Asset management and grid hardening

Additional Assessment Topics

slide-14
SLIDE 14

RELI ABI LI TY | ACCOUNTABI LI TY 14

slide-15
SLIDE 15

Supply Chain Report

Howard Gugel, Senior Director of Engineering and Standards Member Representatives Committee Meeting February 6, 2019

slide-16
SLIDE 16

RELI ABI LI TY | ACCOUNTABI LI TY 16

  • Support effective and efficient implementation (e.g. CIP V5

transition)

  • Supply chain risk study
  • Communicate supply chain risks to industry
  • Forum and Association white papers
  • Plan to evaluate effectiveness of supply chain standards

Board Resolution

slide-17
SLIDE 17

RELI ABI LI TY | ACCOUNTABI LI TY 17

  • NERC used the Electric Power Research Institute (EPRI) to

conduct risk study

  • Assessment of product/manufacturer types used on the Bulk Electric

System (BES)

  • Analysis and applicability to BES Cyber Assets
  • Analysis of best practices and standards in other industries to mitigate

supply chain risks

  • Analysis of generalized vendor practices and approaches used to mitigate

supply chain risks

I nterim Supply Chain Risk Study

slide-18
SLIDE 18

RELI ABI LI TY | ACCOUNTABI LI TY 18

  • Applying Industry Practices and Guidelines
  • Third-party accreditation processes
  • Secure hardware delivery
  • Threat-Informed Procurement Language
  • Unsupported or open-sourced technology components
  • Use supply chain controls to mitigate common-mode

vulnerabilities

  • Assess the risks through data analysis
  • Pre-Audit surveys and questionnaires
  • Targeted outreach to vendors
  • Develop standardized vendor supply chain practices
  • Independent testing of legacy applications and products

I nterim Report Conclusions

slide-19
SLIDE 19

RELI ABI LI TY | ACCOUNTABI LI TY 19

  • Risks
  • Allow remote access through backdoor
  • Impact ability to respond
  • Single platform vulnerabilities
  • Mitigation factors
  • Existing Critical Infrastructure Protection (CIP) access controls
  • Testing, verification, and validation of architecture, configuration, and

management controls

  • Staff recommendations
  • Include electronic access controls in Supply Chain Standards
  • In interim, voluntarily identify and assess supply chain vulnerabilities

Electronic Access Control or Monitoring Systems

slide-20
SLIDE 20

RELI ABI LI TY | ACCOUNTABI LI TY 20

  • Risks
  • Allow physical access to assets
  • Adverse action without detection
  • Impact ability to respond
  • Mitigation factors
  • Existing CIP access controls
  • Requires physical presence
  • Staff recommendations
  • Include physical access controls in Supply Chain Standards
  • In interim, voluntarily identify and assess supply chain vulnerabilities

Physical Access Control Systems

slide-21
SLIDE 21

RELI ABI LI TY | ACCOUNTABI LI TY 21

  • Risks
  • Malicious code
  • Vendor access
  • Common mode vulnerabilities
  • Mitigation factors
  • Basic cyber hygiene
  • Overall market impact
  • Common procurement methods
  • Staff recommendations
  • Voluntarily apply to low if subject to CIP-013
  • If low only, develop supply chain risk management programs tailored to

risk

  • Monitor practices through pre-audit surveys

Low I mpact BES Cyber Systems

slide-22
SLIDE 22

RELI ABI LI TY | ACCOUNTABI LI TY 22

  • Risks
  • Vary with the asset
  • By definition, do not represent an immediate 15-minute adverse impact to

the reliability of the BES

  • Typically Information Technology assets
  • Staff recommendations
  • Evaluate risk on case-by-case basis
  • Verify authenticity

Protected Cyber Assets

slide-23
SLIDE 23

RELI ABI LI TY | ACCOUNTABI LI TY 23

  • Include in Supply Chain Standards
  • Electronic access controls for medium and high BES Cyber Systems
  • Physical access controls for medium and high BES Cyber Systems
  • Do not include in Supply Chain Standards
  • Electronic access monitoring and logging
  • Physical access monitoring and logging
  • Protected Cyber Assets
  • Collect more data on low impact BES Cyber Systems
  • Additional actions
  • Support EPRI report conclusions
  • Monitor emerging technologies for risks

Conclusion

slide-24
SLIDE 24

RELI ABI LI TY | ACCOUNTABI LI TY 24

  • Policy input on staff recommendations - April
  • Summary of policy input and final report to Board - May
  • Report filed with FERC
  • SAR developed to address final recommendations - June

Schedule

slide-25
SLIDE 25

RELI ABI LI TY | ACCOUNTABI LI TY 25

slide-26
SLIDE 26

Effectiveness and Efficiency

Stakeholder Engagement

Mark Lauby, Senior Vice President and Chief Reliability Officer Member Representatives Committee Meeting February 6, 2019

slide-27
SLIDE 27

RELI ABI LI TY | ACCOUNTABI LI TY 27

  • Objectives
  • Enhance Electric Reliability Organization (ERO) effectiveness in executing

its statutory functions, recognizing the value of industry expertise

  • Improve the efficiency of ERO operations and use of stakeholder resources
  • Four-legged approach

Objectives and Approach

Stakeholder Engagement NERC Initiatives ERO Enterprise “Coordination costs/ Opportunities” Regional Entity (RE) Initiatives

slide-28
SLIDE 28

RELI ABI LI TY | ACCOUNTABI LI TY 28

Stakeholder Engagement / Committees

  • The current model has been in place for over ten years
  • Model is expensive and time consuming for NERC members
  • The ERO Enterprise has matured
  • Several REs have had success enhancing their committee models
  • Committee “silos” blurring
  • Committees activities increasingly overlap
  • New technology requires cross-cutting rethinking of many utility paradigms
  • Changing industry model
  • Advances in new and unfamiliar technologies (e.g., inverters, batteries)
  • Risk profiles changing (e.g., fuel assurance, ERS preservation with resource

mix changes)

slide-29
SLIDE 29

RELI ABI LI TY | ACCOUNTABI LI TY 29

Current NERC Stakeholder Committees

slide-30
SLIDE 30

RELI ABI LI TY | ACCOUNTABI LI TY 30

OC, PC, and CI PC: I ncreasing Convergence

slide-31
SLIDE 31

RELI ABI LI TY | ACCOUNTABI LI TY 31

OC, PC, and CI PC: Future State

  • Is there a different structure?
  • Strengthen alignment of stakeholder input with ERO Enterprise priorities
  • Accommodate the changing industry model with focus on reliability and

security risks from a strategic planning, operating and security perspective

  • Effectively address the increasing overlap between the committees driven

by the current and evolving industry model and convergence of issues?

  • Achieve a higher level of industry participation (effectiveness) and more

cost-effectively leverage subject matter expertise (efficiency)?

  • Increase effectiveness of industry and ERO Enterprise resource allocation
  • Balance the burden and benefits of time and travel
  • Ensure continued availability of industry subject matter expertise
  • Consider committee succession planning to fortify stakeholder leadership
  • Right people working on the right issues
slide-32
SLIDE 32

RELI ABI LI TY | ACCOUNTABI LI TY 32

Stakeholder Engagement Team

  • Stakeholder Engagement Team formed to develop a future vision

for ERO stakeholder engagement needs and put forward a committee structure to support:

  • Execution of statutory functions
  • Improvement in the efficiency of ERO operations and stakeholder resources
  • Recognizing and leveraging the value of industry expertise
  • Review the existing technical committee structure and make

recommendations to improve efficiency and effectiveness

  • The team was formed in late 2018 and held a kick-off webinar on

December 14, 2018 to discuss the team’s purpose and scope

slide-33
SLIDE 33

RELI ABI LI TY | ACCOUNTABI LI TY 33

Stakeholder Engagement Team

  • Leadership:

Jennifer Sterling Mark Lauby

  • Team members:

Marc Child Jeffrey Cook Michael Desselle Brian Evans-Mongeon Greg Ford Lloyd Linke Jennifer Flandermeyer Jason Marshall Patti Metro David Short Martin Sidor Lori Spence Scott Tomashefsky

  • NERC Staff:

Stephen Crutchfield Nina Jenkins-Johnston

slide-34
SLIDE 34

RELI ABI LI TY | ACCOUNTABI LI TY 34

Stakeholder Engagement Team

  • Face-to-face meeting held on January 18, 2019 to:
  • Refine the scope and work plan
  • Begin the evaluation process
  • Regional Entity staff provided lessons learned from transforming their

regional stakeholder engagement structure and processes

  • During the January 18 meeting:
  • Discussed existing ERO committee and subcommittee structure
  • Reviewed NERC’s Strategic Plan, Operating Plan, and RISC Report to facilitate

the evaluation process

  • The team established project work streams, identified

deliverables, and developed a project work schedule

slide-35
SLIDE 35

RELI ABI LI TY | ACCOUNTABI LI TY 35

Stakeholder Engagement Team – Work Stream

  • Review existing ERO committee structure
  • List deliverables from each NERC group and determine if those deliverables

are still needed and what is needed for the future

  • List statutory obligations of NERC
  • Obligations per the NERC Rules of Procedure, Federal Power Act, etc. –

identify and map tasks/responsibilities

  • Survey industry on what committee activities they see of value and include

future needs

  • Consider a NERC oversight committee for technical committees
  • PCGC/PS synergies and funding
slide-36
SLIDE 36

RELI ABI LI TY | ACCOUNTABI LI TY 36

Stakeholder Engagement Team – Work Stream

  • Review existing ERO committee structure (continued)
  • Regional Entity participation as members of committees - is there

duplication of effort?

  • Committee (OC, PC, CIPC) work plans – analyze for overlapping

responsibilities

  • RISC Report – consider assigning risk items to a specific committee for

accountability

  • Consider future needs, NERC vision
slide-37
SLIDE 37

RELI ABI LI TY | ACCOUNTABI LI TY 37

Stakeholder Engagement Team – Work Stream

  • Assess "best practices" and "lessons learned"
  • Survey Regions on what they learned from restructuring, before/after

analysis with more specific data (number of committees, number of meetings, number of members, membership model/requirements, etc.)

  • Develop
  • proposed structure
  • participation model
  • implementation plan
  • proposed committee and task force charter templates
  • Draft report for industry policy input
  • Present results and recommendations to the MRC and Board –

August 2019

slide-38
SLIDE 38

RELI ABI LI TY | ACCOUNTABI LI TY 38

Stakeholder Engagement Team – Work Stream

  • Members volunteered to support these work streams
  • Advanced work plan developed for next steps and milestones
  • Team will continue to gather information between meetings
  • Next face-to-face meeting is scheduled for February 20, 2019
slide-39
SLIDE 39

RELI ABI LI TY | ACCOUNTABI LI TY 39

slide-40
SLIDE 40

NERC Personnel Certification Governance Committee

Brett Hallborg, PCGC Member Member Representatives Committee Meeting February 6, 2019

slide-41
SLIDE 41

RELI ABI LI TY | ACCOUNTABI LI TY 41

  • Provides oversight to the policies and processes used to

implement and maintain the integrity and independence of NERC’s System Operator Certification Program

  • Structure of the PCGC shall be implemented and maintained so

that policies and procedures are established to protect against undue influence that could compromise the integrity of the System Operator Certification process https://www.nerc.com/comm/PCGC/Pages/Charter.pdf NERC Personnel Certification Governance Committee (PCGC)

slide-42
SLIDE 42

RELI ABI LI TY | ACCOUNTABI LI TY 42

  • 10 voting members from the U. S. and Canada:
  • Each member maintains a current NERC System Operator Credential
  • The Federal Energy Regulatory Commission (FERC) and other governmental

authorities in Canada have the option of having a non-voting member

PCGC Membership Representation

slide-43
SLIDE 43

RELI ABI LI TY | ACCOUNTABI LI TY 43

  • Exam Working Group (EWG)
  • Responsible for development and maintenance of the System Operator

Certification exams under the general guidelines set by the PCGC

  • Recommend Exam Cut Scores
  • Membership:
  • Minimum of 12 Members
  • All members hold a current NERC System Operator credential
  • Subject matter experts in real time control centers or operational support

personnel

https://www.nerc.com/comm/PCGC/EWG%20DL/EWG%20Scope%20Final_Revised_No v_2017.pdf

PCGC: Exam Working Group

slide-44
SLIDE 44

RELI ABI LI TY | ACCOUNTABI LI TY 44

Exam Development and Maintenance Cycle

slide-45
SLIDE 45

RELI ABI LI TY | ACCOUNTABI LI TY 45

Year Credential Maintained New Certificates Exams Taken 2006 943 2007 109 729 1568 2008 833 634 1520 2009 1200 652 1005 2010 1597 638 914 2011 1691 607 874 2012 1291 588 894 2013 2063 631 943 2014 2102 620 809 2015 1465 725 967 2016 2056 624 854 2017 2082 521 748 2018 1966 496 699 Totals 18455 8408 11795

System Operator Certification (SOC) Program Statistics

slide-46
SLIDE 46

RELI ABI LI TY | ACCOUNTABI LI TY 46

System Operator Certification (SOC) Program Statistics

slide-47
SLIDE 47

RELI ABI LI TY | ACCOUNTABI LI TY 47

Exams by Type

slide-48
SLIDE 48

RELI ABI LI TY | ACCOUNTABI LI TY 48

Exams by Type

slide-49
SLIDE 49

RELI ABI LI TY | ACCOUNTABI LI TY 49

Exams by Type

slide-50
SLIDE 50

RELI ABI LI TY | ACCOUNTABI LI TY 50

  • Linear On-The-Fly Testing (LOFT) – 2016
  • System Operator Certification Continuing Education Database

(SOCCED) Transition – 2017

  • System Operator Certification Program Survey – 2017

Recent PCGC Projects

slide-51
SLIDE 51

RELI ABI LI TY | ACCOUNTABI LI TY 51

  • Benefits of LOFT:
  • Reduced the exam development cycle from three year to real time
  • Elimination of fixed forms has increased the integrity of the exams
  • Item Bank currently maintained at a minimum of 3 items per task
  • Ability to update exams as Standards are created or deactivated
  • Implemented Q1 2017
  • New Content Outlines
  • New Cut Scores

Linear on the Fly Testing (LOFT)

Fixed Form Exams Real Time Exam Creation

slide-52
SLIDE 52

RELI ABI LI TY | ACCOUNTABI LI TY 52

SOCCED

  • Previous Platform
  • Multiple Tables of Same Data
  • Old Technology
  • System was not user-friendly
  • Support from existing vendor was inadequate
  • Improvements to system were costly
  • Credential Maintenance Database – New Platform
  • Deployed December 2017
  • Current Technology
  • One Source for Data
  • Improved Accuracy
slide-53
SLIDE 53

RELI ABI LI TY | ACCOUNTABI LI TY 53

  • Purpose was to gather information from industry stakeholders

related to the evolving NERC System Operator Certification program

  • Use of one credential was launched in 1998 with a 5-year expiration
  • This credential was expanded to four credentials in 2001
  • Credential maintenance was implemented in 2005 in lieu of testing
  • The collected information was used to determine potential

future development and improvement of the program

System Operator Certification Program Survey

slide-54
SLIDE 54

RELI ABI LI TY | ACCOUNTABI LI TY 54

Current State Four System Operator Exams/Credentials:

  • Reliability Coordinator (RC)
  • 200 Continuing Education Hours (CEHs)
  • Transmission Operator (TO)
  • 140 CEHs
  • Balancing, Interchange and Transmission Operator (BT)
  • 160 CEHs
  • Balancing and Interchange Operator (BI)
  • 140 CEHs
slide-55
SLIDE 55

RELI ABI LI TY | ACCOUNTABI LI TY 55

Future State At this time, the only proposed changes to the program are one credential and the required CEHs to maintain this credential.

  • One Credential:
  • NERC Certified System Operator (NCSO)
  • 140 CEHs
slide-56
SLIDE 56

RELI ABI LI TY | ACCOUNTABI LI TY 56

  • 1998: System Operator Certification Program established
  • 2001: 4 Credentials with 3 year expiration
  • 2005: Credential maintenance in lieu of retesting
  • 2006-2014: Focused on Exam Development
  • 2015-2017: Strategic Plan
  • 2017-Q1 2018: System Operator Certification Program Survey
  • 2018: Survey Analysis and Develop One Credential Whitepaper
  • 2019: Whitepaper/Credential Maintenance Analysis
  • 2020-2021: Update program

SOC Program Highlights

slide-57
SLIDE 57

RELI ABI LI TY | ACCOUNTABI LI TY 57

slide-58
SLIDE 58

Recent FERC Activity

Andy Dodge Director, Office of Electric Reliability Federal Energy Regulatory Commission February 6, 2018

The views expressed in this presentation are my own and do not represent those of the Commission or any individual Commissioner

slide-59
SLIDE 59

GMD Reliability Standard

  • Final Rule in RM18-8 issued 11/15/18
  • Approves proposed Reliability Standard TPL-007-2

(Transmission System Planned Performance for Geomagnetic Disturbance Events) submitted by NERC in response to Commission directives in Order No. 830

  • Directs NERC to modify the reliability standard to:
  • Require the development and implementation of corrective action

plans to mitigate assessed supplemental GMD event vulnerabilities; and

  • Authorize extensions of time to implement corrective action plans
  • n a case-by-case basis.
  • Accepts the revised GMD research work plan submitted by

NERC

  • Modified standard due 12 months from the effective date of

Reliability Standard TPL-007-2

2

slide-60
SLIDE 60

Removing Barriers to Storage Participation

  • Final Rule in RM16-23 issued 2/15/18
  • Requires grid operators to remove barriers to participation of electric

storage resources in capacity, energy and ancillary services markets

  • Requires each regional grid operator to revise its tariff to establish a

participation model for electric storage resources

  • Market rules to recognize the physical and operational

characteristics of electric storage resources

  • Must ensure that a resource is eligible to provide all capacity,

energy and ancillary services that it is technically capable of providing

  • All RTOs/ISOs have completed compliance filings, which were due

12/3/18

  • FERC, grid operators and stakeholders have one year to review, revise

and implement plans by 12/3/19

3

slide-61
SLIDE 61

Transmission Incentives

  • Commission will consider whether changes are required in

calculation of base ROE and transmission incentives under Order No. 679

  • At the 11/15/18 Commission meeting, Chairman Chatterjee

indicated that the policies were overdue for a “fresh look”

  • Commission is expected to consider changes to:
  • Calculation of base ROE
  • Whether the current policies are producing the appropriate level

and type of transmission investment

  • Any changes to the Commission’s transmission incentives

policy would be prospective from the time of the determination

4

slide-62
SLIDE 62

Market Actions with Reliability Implications

  • SPP Dispatchable Variable Energy Resources
  • On 1/10/19 in ER19-356, FERC issued deficiency letter requesting

more information to evaluate proposed tariff changes

  • SPP proposed to require most variable energy resources in its

footprint to be dispatchable

  • ISO-NE Interim Solution for Retaining Units for Fuel

Security

  • On 12/3/18, FERC accepted ISO-NE’s compliance filing in ER18-

2364 proposing interim solution for retaining units at cost of service rates if they are needed for fuel security

  • ISO-NE will file a long-term market solution by 7/1/19

5

slide-63
SLIDE 63

Upcoming Activities

  • ERO Recertification and Self-Assessment
  • Every five years, NERC, as the ERO, must submit an assessment of

its performance

  • Expected to be filed in 7/19
  • West RC Transition

6

slide-64
SLIDE 64
  • Thank you!
  • Questions?

7