Patrick Gsellman, PE WW3 Akron Waterways Renewed Program Manager - - PowerPoint PPT Presentation

patrick gsellman pe ww3
SMART_READER_LITE
LIVE PREVIEW

Patrick Gsellman, PE WW3 Akron Waterways Renewed Program Manager - - PowerPoint PPT Presentation

Patrick Gsellman, PE WW3 Akron Waterways Renewed Program Manager Akron Engineering Bureau Our Mission lies in building infrastructure that will protect public health and maintain water of the highest quality in the most cost- effective manner


slide-1
SLIDE 1

Patrick Gsellman, PE WW3

Akron Waterways Renewed Program Manager Akron Engineering Bureau

slide-2
SLIDE 2

Our Mission lies in building infrastructure that will protect public health and maintain water of the highest quality in the most cost- effective manner while providing local jobs Integrated Planning Goal – to find equal or better environmental solutions at a more affordable cost

slide-3
SLIDE 3
  • Akron’s CSO Program Development
  • Integrated Planning
  • Consent Decree Projects
  • Construction Delivery Methods / Local Labor
  • Consent Decree Modification Requests
  • Integrated Planning Status

3

slide-4
SLIDE 4
  • Initiated CSO Program Development:

1991

  • Facilities Plan Alternatives 1999
  • Ohio EPA LTCP 2002
  • Ohio EPA Supposal 2008
  • Akron CSO LTCP 3/3/3 Plan 2011
  • Design/Implement Consent Decree
  • Akron CSO LTCP – Final Consent Decree

2014

slide-5
SLIDE 5

5

  • 2012 US EPA Integrated Municipal Stormwater

Wastewater Planning Approach Framework

– Water Quality, Human Health and Regulatory – Existing Systems – Community Stakeholders – Alternatives and Proposed Implementation Schedules – Measuring Success – Improvements to the Plan

slide-6
SLIDE 6

6

  • Akron Integrated Planning Framework Plan

– Develop Project List – Stakeholder Involvement – Triple Bottom Line Evaluation – Water Quality Activities – Financial Analysis – Final Integrated Plan – Ongoing Plan Improvements

slide-7
SLIDE 7

7

slide-8
SLIDE 8

8

  • Construction Manager at Risk (CMaR)
  • Design-Build
  • Design-Bid-Build
  • Local Participation
slide-9
SLIDE 9
  • Merriman Separation – Green (36)
  • North Hill Separation – Green (22)
  • Middlebury Separation – Green (5/7)
  • Main Outfall Sewer
  • CMOM Schedule

9

slide-10
SLIDE 10

Patrick Gsellman, PE WW3

Akron Waterways Renewed Program Manager Akron Engineering Bureau

pgsellman@akronohio.gov 330-375-2355

www.AkronWaterwaysRenewed.com