Piner er S Stad adium F Fiel eld Lights Project Status Update - - PowerPoint PPT Presentation

piner er s stad adium f fiel eld lights
SMART_READER_LITE
LIVE PREVIEW

Piner er S Stad adium F Fiel eld Lights Project Status Update - - PowerPoint PPT Presentation

Piner er S Stad adium F Fiel eld Lights Project Status Update Backgr kgrou ound This project consists of: Stadium Lighting PA system and speakers Sound wall Required by Environmental Impact Report (EIR) Site


slide-1
SLIDE 1

Piner er S Stad adium F Fiel eld Lights

Project Status Update

slide-2
SLIDE 2

Backgr kgrou

  • und
  • This project consists of:
  • Stadium Lighting
  • PA system and speakers
  • Sound wall – Required by Environmental Impact Report (EIR)
  • Site improvements:
  • Site Paving (ADA Requirements) and Landscaping
  • The project is partially Owner Furnished-Contractor Installed, which means that the District will

direct purchase the lighting and appurtenant equipment and a contractor will install it.

  • The balance of the work; site work and landscaping, PA/speaker system and concrete sound wall

will be included in the bidding contractor’s scope of work.

slide-3
SLIDE 3

Statu tus a s as of 5/ 5/10 10/1 /17

  • The Musco Lighting for this project was board approved.
  • The construction documents are 80% complete.
  • DSA submission scheduled for May 24, 2017
  • Tentative date range for DSA approval is July 12 – August 16.
  • Bidding schedule is as follows;
  • 1st Advertisement

June 6

  • 2nd Advertisement

June 13

  • Pre-Bid Job Walk

June 15

  • Contractor Q&A/Addenda

June 15 – 20

  • Bids Due

June 27

slide-4
SLIDE 4

Lightin ing (Example le)

slide-5
SLIDE 5

Pre reca cast st C Concrete Fe Fence

  • Required by Environmental Impact Report
  • Used to deflect sound from neighborhood

homes

  • Average wall height 12’
  • Meets California Environmental Quality Act

(CEQA) requirements

BASE SCOPE: 10-13 FT HIGH FENCE LOCATION ADJACENT TO TRACK & FOOTBALL FIELD

slide-6
SLIDE 6

Prec ecas ast C Concrete F e Fence ( e (Exam ample) e)

Samples – For Illustrative Purposes

slide-7
SLIDE 7

Mileston

  • nes

es

Completion of Construction Documents May 23 DSA Submission May 24 Bidding Process June 6 – 22 Estimated DSA Approval July 12 – August 16 Board Approval for Contract Award TBD after DSA Approval Construction Timeframe 2-3 Months