December 23, 2019 Pittsburgh Parking Authority 9 th and Penn Avenue Replacement Garage Planning Commission Design Review Process New Construction December 23, 2019 1 LOCATION MAP December 23, 2019 2 INTRODUCTION December 23, 2019


slide-1
SLIDE 1 December 23, 2019 1 Pittsburgh Parking Authority 9th and Penn Avenue Replacement Garage Planning Commission Design Review Process New Construction December 23, 2019
slide-2
SLIDE 2 December 23, 2019 LOCATION MAP 2
slide-3
SLIDE 3 December 23, 2019 INTRODUCTION
  • Location
  • 136 9th Street, Pittsburgh, PA
  • Zoning District: GT-C (Golden Triangle – C)
  • Size
  • Demolition of existing 586 space parking structure
  • Build a 692 space facility
  • Operations
  • Functional and efficient for ease of operations
  • Durable cast in place p/t structure with extended life
  • Community
  • Revitalization and building block for future development
  • Architecturally sensitive, and aesthetically enhanced
  • Safe pedestrian connections to destinations
  • Creation of urban open space (10%)
  • Public art requirement (1%)
  • Feasibility of re-purposing- ground tier
slide-4
SLIDE 4 December 23, 2019 SITE PLAN – EXISTING PPAP OWNERSHIP 4
slide-5
SLIDE 5 December 23, 2019 EXISTING PPAP OWNERSHIP AND DEMOLITION 5
slide-6
SLIDE 6 December 23, 2019 CONDITIONS PRIOR TO DEMOLITION
slide-7
SLIDE 7 December 23, 2019 EXISTING PPAP OWNERSHIP AND DEMOLITION 7
slide-8
SLIDE 8 December 23, 2019 KEY DESIGN AND SITE CONSIDERATIONS
  • User groups
  • Daily Commuters
  • Theatre District Patrons
  • North Shore Stadium Events
  • Architecture
  • Open per code, and natural ventilated structure
  • Horizontal lines and screening applications
  • Recognition of proposed adjacent uses (hotel, condo)
  • Traffic
  • Traffic Study
  • Primary entry/exits on 9th Street, overflow off of 8th Street
  • Close coordination with the Cultural Trust
  • Buildings owned by the Cultural Trust
  • Maintaining the 3 buildings at corner of 9th and Penn Ave.
  • Maintain the Goodyear building to the northwest of garage
  • Coordination with demolition of the Duff’s building
  • Property line consideration
  • Sustainable
  • ParkSmart Gold certified / Sustainable strategies
  • Green Roof / City Park
slide-9
SLIDE 9 December 23, 2019 SURROUNDING CONTEXT 9 Intersection of 9th Street and Penn Avenue Benedum Center / Umbrella Sky Exhibit
slide-10
SLIDE 10 December 23, 2019 SURROUNDING CONTEXT 10
slide-11
SLIDE 11 December 23, 2019 PERSPECTIVE RENDERINGS / PPAP Existing Parking Structures 11
slide-12
SLIDE 12 December 23, 2019 RELATIONSHIP TO MASTER PLAN 12 PITTSBURGH CULTURAL TRUST MASTER PLAN
slide-13
SLIDE 13 December 23, 2019 RELATIONSHIP TO MASTER PLAN 13
slide-14
SLIDE 14 December 23, 2019 PERSPECTIVE RENDERINGS: 9th Street from Penn Avenue 14 Glass guardrail pedestrian barrier Cast-In-Place Concrete Perforated metal panel; panels project at varying depth; multi-color Curtainwall Decorative / Architectural Fencing
slide-15
SLIDE 15 December 23, 2019 PERSPECTIVE RENDERINGS: 8th Street from Penn Avenue 15 Cast-In-Place Concrete Glass guardrail pedestrian barrier Perforated metal panel; panels project at same depth; one color Curtainwall
slide-16
SLIDE 16 December 23, 2019 PERSPECTIVE RENDERINGS: 9th Street from Fort Duquesne 16 Glass guardrail pedestrian barrier Cast-In-Place Concrete Perforated metal panel; panels project at varying depth; multi-color Curtainwall Decorative / Architectural Fencing
slide-17
SLIDE 17 December 23, 2019 PERSPECTIVE RENDERINGS: 9th Street from Penn Avenue (night) 17 Glass guardrail pedestrian barrier Cast-In-Place Concrete Perforated metal panel; panels project at varying depth; multi-color Curtainwall Decorative / Architectural Fencing
slide-18
SLIDE 18 December 23, 2019 AERIAL RENDERINGS: 9th Street from Fort Duquesne 18 Paver area; temporary movie area Tall grasses Children’s playground; sport turf Artwork / sculpture Dog park Glass guardrail pedestrian barrier
slide-19
SLIDE 19 December 23, 2019 WALL PANEL DETAIL 19 Perforated metal panels in 6 shades
  • f grey, projecting
from the face of the garage at varying distance
slide-20
SLIDE 20 December 23, 2019 SITE PLAN 20
slide-21
SLIDE 21 December 23, 2019 SITE PLAN 21
slide-22
SLIDE 22 December 23, 2019 GROUND TIER PLAN 22
slide-23
SLIDE 23 December 23, 2019 GROUND TIER PLAN 23
slide-24
SLIDE 24 December 23, 2019 SECOND TIER PLAN 24
slide-25
SLIDE 25 December 23, 2019 TYPICAL TIER PLAN 25
slide-26
SLIDE 26 December 23, 2019 ROOF LEVEL PLAN – GREEN ROOF 26
slide-27
SLIDE 27 P E N N A V E N U E )

U B

UP SPEED RAMP UP P L P L P L P L P L P L P L P L P L P L P L P L P L P R O P O S E D P A R K I N G GARAGE URBAN OPEN SPACE AND P E D E S T R I A N A C C E S S EASEMENT #2 ACCESS DRIVE E A S E M E N T # 1 SITE DEVELOPMENT PLAN LD-5 NOTES: 1. SOIL CLASSIFICATION; URBAN LAND (UB) - 0 TO 3 PERCENT SLOPES, PAVEMENT, BUILDINGS AND OTHER ARTIFICIALLY COVERED AREAS. NOTE: FOR LEGEND OF EXISTING FEATURES SEE SHEET LD-2; NOTES, LEGEND AND ABBREVIATIONS PITTSBURGH PARKING AUTHORITY 9TH AND PENN PARKING GARAGE CITY OF PITTSBURGH ALLEGHENY COUNTY PA

N W CONSULTING ENGINEERS, INC.

151 RENO AVENUE NEW CUMBERLAND, PA 17070 (717) 441-2216 FAX (717) 695-7449 www.navarrowright.com N AVARRO & W RIGHT

DRAFT

Goodyear Service Center
  • No Access
Cultural Trust Temp Parking - Access needed for easement construction 9th & Penn Garage Footprint Occupied Buildings
  • No Access
Sidewalk Closure for duration of project 9th Street 8th Street Penn Avenue Ft Duquesne Blvd. Temporary Construction Fence Site access Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will need coordinated for lane closure Site access Gate for two way traffic Construction Trailers Construction Access Zone Temporary Easement Dumpster Location Main Delivery Zone Crane Hoisting Area

DRAFT - Site Logistics Plan

Developed by Massaro 12/02/2019