Plug and Abandonment Guidelines, Challenges, the Future May 8, 2015 - - PowerPoint PPT Presentation

plug and abandonment
SMART_READER_LITE
LIVE PREVIEW

Plug and Abandonment Guidelines, Challenges, the Future May 8, 2015 - - PowerPoint PPT Presentation

Plug and Abandonment Guidelines, Challenges, the Future May 8, 2015 To promote safety, protect the environment and conserve resources offshore through vigorous regulatory oversight and enforcement.


slide-1
SLIDE 1

Plug and Abandonment

Guidelines, Challenges, the Future May 8, 2015 “To promote safety, protect the environment and conserve resources

  • ffshore through vigorous regulatory
  • versight and enforcement.”
slide-2
SLIDE 2

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Overview

Regulatory Distinction

TA vs PA, etc.

Upcoming Revisions Departure/Alternate Compliance Regulations Going Forward

2

slide-3
SLIDE 3

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Classifications

Zonal Isolation

Defined by NTL 2010-G05 Well isolated downhole without further barriers (1715(a)(1),(a)(2), or (a)(3) May be left in this condition for two years Requires Alternate Compliance, if applicable

3

slide-4
SLIDE 4

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Classifications

Temporary Abandonment

Governed by 30 CFR 250.1721 Must meet all of 1715 minus 1715(a)(8) 100’ surface plug must be placed within 1000’ of mud line Annular isolation still required per 1715(a)(6)

4

slide-5
SLIDE 5

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Classifications

Permanent Abandonment

Must abide by 1715 Casing cut 15’ BML unless below 800 m (2624 feet) All zones must be plugged as per regulation or with District Manager approval All annuli must be isolated

5

slide-6
SLIDE 6

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Upcoming Changes

30 CFR 1715(a)(3)(iii)(B)

Confusion due to outdated wording (B) refers to casing bridge plug (E) refers to tubing bridge plug (A),(B),(C) original PA regulation (D),(E) added to accommodate tubing left in hole Regulation (B) will be written to refer to “casing bridge plug” when practical

6

slide-7
SLIDE 7

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Regulatory Deviations

Alternate Compliance

Allows operator to meet the “intent” of regulation Require PE certification to read as above.

Example: Program meets intent of 1721, etc.

Granted at District level

7

slide-8
SLIDE 8

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Regulatory Deviations

Departure

Requested when operator cannot meet regulation

Example: Deepwater casing annulus lacks 200’ of cement

PE certification must read “cannot meet” regulation Granted, rarely, at the Regional level

8

slide-9
SLIDE 9

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Going Forward

Annular isolation

Balanced cement plugs (“Horse collar”)

Potential for filter cake on casing Hole cleaning Quality of isolation? 9

slide-10
SLIDE 10

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Going Forward

Annular isolation

Deep Penetration (DP) guns

Effectiveness?

Testing?

Quality of cement job 10

slide-11
SLIDE 11

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Going Forward

Annular isolation

Deepwater

No monitoring of outer annuli Mud line hanger wells without annular mechanical barriers 11

slide-12
SLIDE 12

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA “To promote safety, protect the

BSEE Website: www.bsee.gov @BSEEgov BSEEgov Bureau of Safety and Environmental Enforcement

environment and conserve resources

  • ffshore through vigorous regulatory
  • versight and enforcement.”