Presentation of the ATENA view and testbed ATENA H2020 WORKSHOP A new cybersecurity for interdependent Critical Infrastructures Dr. Leonid Lev Manager, Innovative ICT Projects for Governance Luxembourg 18/10/2018 What are the main Problems


slide-1
SLIDE 1
  • Dr. Leonid Lev – Manager, Innovative ICT Projects for Governance

Presentation of the ATENA view and testbed

Luxembourg 18/10/2018

ATENA H2020 WORKSHOP A new cybersecurity for interdependent Critical Infrastructures

slide-2
SLIDE 2

2

What are the main Problems of Validation and Demonstration in the R&D projects

  • End users are ready to provide small facilities or training centers but they are not

ready to install new applications or provide facilities for cyber attack. Possible threats could not be demonstrated in the real environment.

  • Usually no real data or real scenarios are provided, even rarer the combination of real

data and real scenarios could be provided.

  • End user do not provide remote access to the real equipment, applications and

infrastructures.

  • The laboratories of universities or SMEs could not create a seemingly infinite

infrastructure for parallel serving of several users, most of them use SW models and some PCs and PLCs to represent IACSs.

slide-3
SLIDE 3

3

What is Smart Validation

slide-4
SLIDE 4

4

Hybrid Environment for Design and Validation (HEDVa) for Industrial Control Systems (ICS)

 Environment for research projects of the European Programs  Environment for validation of the future systems that will be installed at IEC premises  Environment for validation of cyber security technologies and policies  Environment for design and validation of new innovative projects in cooperation with Israel government

slide-5
SLIDE 5

5

Smart grid Critical Infrastructure

slide-6
SLIDE 6

6

HEDVa Configuration

slide-7
SLIDE 7

7

Power Generator Emulator

slide-8
SLIDE 8

8

Substation Emulation

slide-9
SLIDE 9

9

Distribution Emulation

slide-10
SLIDE 10

10

Smart Home (1)

slide-11
SLIDE 11

11

Smart Home (2)

slide-12
SLIDE 12

12

Data Repository

slide-13
SLIDE 13

13

ATENA Validation and Demonstration System(1)

slide-14
SLIDE 14

14

ATENA Validation and Demonstration System(2)

slide-15
SLIDE 15

15

ATENA Validation and Demonstration System

slide-16
SLIDE 16

16

ATENA Integrated Use Case (1)

slide-17
SLIDE 17

17

ATENA Integrated Use Case (2)

ROMA3 MULTITEL Water CI CRAT ENEA CI UC

Data Repository Files Cimplicity DB OPC MODBUS Field 3x

IEC HEDVa Elctrical grid + Gas CI SWDE

ATENA’s MODEL Of the Use Case

legend To be done done

Leonardo ITrust

OPC memory Share OPC memory Share Operational 2x

slide-18
SLIDE 18

18

ATENA Integrated Use Case (3)

C++ application on PC C++ variables Under implementation by IEC Under implementation by Multitel RAO model(s) (ECI, WCI...) Communicator PLC Simulation model(s) OPC RAO model (ECI) Messages Windows WM_COPYDATA Connection PC/PLC

slide-19
SLIDE 19

19

ATENA Use Case Example

The LOAD > Nominal load YES NO Power outage PRMS Domains involved in the case Distribution system (Active&Reactive Power) LOAD Frequency Voltage Gas Flow Diesel Generator LOAD shedding YES NO Frequency protection worked YES PRMS PRMS Distribution system Gas Flow=0 Diesel generator is ready to work Diesel generator Is NOT READY towork Normal operation

  • f diesel-generator

Gas Pressure Start Event: The LOAD of the consumer has increased End Event: Gas flow increased End Event: Disconnection of the generator main switch End Event: Return to normal Operation End Event: Emergency stop of diesel generator

POWER STATION OVERLOAD single generator and distribution system without spare energy source

slide-20
SLIDE 20

20

ATENA Use Case Demonstrating Cyber Attack

slide-21
SLIDE 21

21

Main Results

Deliverables D7.1 Validation Plan, M18 (R) D7.2 Validation System Implementation and Aggregation (Interim Report), M24 (R, DEM) D7.3 Demonstration of the ATENA Prototype (Interim DEM) ), M24 (R, DEM) D7.4Validation System Implementation and Aggregation (Final Report), M36 (R, DEM) D7.5 Final ATENA prototype validation and evaluation of validation results (Final report), M36 (R, DEM)